← Back
Walk-up cooperative
Glen Oaks Village
245-24 76 AVENUE · BIN 4458940
💬 Discuss this project
1948Year Built
2Stories
C6Building Class
R3-2Zoning
136,802 sfGross Floor Area
168Units
LL97 CoveredRent Stabilized7 Open Violations ▸
Walk-up cooperative · Owner of record: GLEN OAKS VILLAGE OWNERS INC · 282,525 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GLEN OAKS VILLAGE OWNER'S INC.1907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MESZAROS ENGINEERING PLLC602/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MESZAROS ENGINEERING PLLC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABILENE INCGeneral Contractor104/09/2026
NY CITY PLUMBER CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MESZAROS ENGINEERING PLLC963602/05/2026
Building Lifecycle
All (53)Filed (6)Permit Issued (3)Violation (11)Inspection (3)Special Inspection (30)
04/30/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
04/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/06/2026
Special inspection requirement — Chimneys and vents
02/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
02/06/2026
Special inspection requirement — Post-installed Anchors
Christian Meszaros
02/06/2026
Special inspection requirement — Preliminary
Christian Meszaros
02/06/2026
Special inspection requirement — Final
Christian Meszaros
02/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Christian Meszaros
02/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
02/06/2026
Special inspection requirement — Maintenance information
Christian Meszaros
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
02/06/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
02/05/2026
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215058-P2
02/05/2026
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215058-P3
01/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
01/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
01/29/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
01/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
01/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
01/29/2026
Special inspection requirement — Maintenance information
Christian Meszaros
01/26/2026
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215058-P1
01/26/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
01/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
01/26/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Christian Meszaros
01/26/2026
Special inspection requirement — Heating Systems
Christian Meszaros
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
01/26/2026
Special inspection requirement — Maintenance information
Christian Meszaros
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
01/21/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Christian Meszaros
01/21/2026
Special inspection requirement — Heating Systems
Christian Meszaros
01/16/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/10/2025
Permit issued — Plumbing
Q01215058-S1-PL
06/09/2025
Permit issued — Boiler Equipment
Q01215058-S2-BE
06/09/2025
Permit issued — General Construction
Q01215058-I1-GC
05/27/2025
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215058-I1
05/27/2025
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215058-S1
05/27/2025
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215058-S2
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP06/10/2025
DOB NOWBoiler EquipmentSigned-offABILENE, INC06/09/2025
DOB NOWGeneral ConstructionPermit IssuedABILENE INC06/09/2025
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC04/26/1990
1 project · most recent 02/05/2026
Gas
FiledStatusContractorScope
02/05/2026Signed-offNY CITY PLUMBER CORPGas
1 project · most recent 08/21/2025
Boiler Controls
FiledStatusContractorScope
08/21/2025CompleteABILENE ELECTRIC INCBoiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/30/2026Fail-Final Boiler Equipment InspectionFailView ↗
04/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
02/06/2026Chimneys and vents—special
02/06/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
02/06/2026Post-installed AnchorsChristian Meszarosspecial
02/06/2026PreliminaryChristian Meszarosprogress
02/06/2026FinalChristian Meszarosprogress
02/06/2026Energy Code Compliance InspectionsChristian Meszarosprogress
02/06/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
02/06/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
02/06/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
02/06/2026Maintenance informationChristian Meszarosenergy_progress
02/06/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
02/06/2026Permanent certificateChristian Meszarosenergy_progress
01/29/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
01/29/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
01/29/2026Permanent certificateChristian Meszarosenergy_progress
01/29/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
01/29/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
01/29/2026Maintenance informationChristian Meszarosenergy_progress
01/26/2026Permanent certificateChristian Meszarosenergy_progress
01/26/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
01/26/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
01/26/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsChristian Meszarosspecial
01/26/2026Heating SystemsChristian Meszarosspecial
01/26/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
01/26/2026Maintenance informationChristian Meszarosenergy_progress
Latest 25 of 34.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026Q01215058-P2Request digital key ↗
08/20/2026Q01215058-P3Request digital key ↗
08/20/2026Q01215058-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature21
09/12/2026Q01215058-S2Open ↗
09/12/2026Q01215058-S2Open ↗
09/12/2026Q01215058-S2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q01215058-P2Open ↗
08/20/2026Q01215058-P3Open ↗
08/20/2026Q01215058-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/12/2026Q01215058-S2Open ↗
08/27/2026Q01215058-S1Open ↗
08/26/2026Q01215058-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026Q01215058-P1Open ↗
08/20/2026Q01215058-P2Open ↗
08/20/2026Q01215058-P3Open ↗
Showing 3 of 6 on file for this type