← Back
Walk-up cooperative
Glen Oaks Village
74-02 260 STREET · BIN 4460398
💬 Discuss this project
1948Year Built
2Stories
C6Building Class
R3-2Zoning
137,476 sfGross Floor Area
176Units
LL97 CoveredRent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: GLEN OAKS VILLAGE OWNERS INC · 319,500 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GLEN OAKS VILLAGE OWNERS, INC.603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT303/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SENID PL & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GINO O. LONGO ARCHITETCT331303/04/2025
Building Lifecycle
All (25)Filed (3)Permit Issued (1)Signed Off (1)Violation (12)Inspection (4)Objection (2)Special Inspection (2)
04/23/2025
Signed off — Alteration
APPLICATION HEREWITH FILED TO LEGALIZE WASHER AND DRYER. ALL WORK IS COMPLETE. NO BUILDING MATERIALS TO BE DISTURBED. NO CHANGE IN OCCUPANCY, USE, EGRESS OR BULK.
Q01034641-I1
03/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
03/04/2025
Filed — Alteration
APPLICATION HEREWITH FILED TO LEGALIZE WASHER AND DRYER. ALL WORK IS COMPLETE. NO BUILDING MATERIALS TO BE DISTURBED. NO CHANGE IN OCCUPANCY, USE, EGRESS OR BULK.
Q01034641-P2
01/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2024
Filed — Alteration
APPLICATION HEREWITH FILED TO LEGALIZE WASHER AND DRYER. ALL WORK IS COMPLETE. NO BUILDING MATERIALS TO BE DISTURBED. NO CHANGE IN OCCUPANCY, USE, EGRESS OR BULK.
Q01034641-P1
08/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
08/07/2024
Permit issued — Plumbing
Q01034641-I1-PL
05/07/2024
Objection resolved — Addressed
05/06/2024
Objection raised — Scope
04/25/2024
Filed — Alteration
APPLICATION HEREWITH FILED TO LEGALIZE WASHER AND DRYER. ALL WORK IS COMPLETE. NO BUILDING MATERIALS TO BE DISTURBED. NO CHANGE IN OCCUPANCY, USE, EGRESS OR BULK.
Q01034641-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/28/1991
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSENID PL & HTG CORP08/07/2024
BISBLISSUEDSENID PL & HTG CORP01/29/2010
BISPLISSUEDSENID PL & HTG CORP01/29/2010
BISPLISSUEDSENID PL & HTG CORP07/13/2006
BISBLISSUEDSENID PL & HTG CORP07/13/2006
BISOTISSUEDNAT'L MECH. SVCS PLBG LLC04/19/1991
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC04/19/1991
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/11/2025Fire-Resistant Penetrations and JointsGINO LONGOspecial
08/27/2024Fire-Resistant Penetrations and JointsGINO LONGOspecial
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026Q01034641-P2Request digital key ↗
08/22/2026Q01034641-P1Request digital key ↗
08/22/2026Q01034641-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
11/22/2022400189808Open ↗
11/03/2022400189808Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026Q01034641-I1Open ↗
08/22/2026Q01034641-P1Open ↗
08/13/2026Q01034641-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01034641-P1Open ↗
08/22/2026Q01034641-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026Q01034641-I1Open ↗
08/22/2026Q01034641-P1Open ↗
08/13/2026Q01034641-P2Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/21/2022400189808Open ↗
10/31/2022400189808Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/22/2022400189808Open ↗