← Back
Walk-up cooperative
196-01 POMPEII AVENUE
QUEENS · BIN 4460549
💬 Discuss this project
1950Year Built
2Stories
C6Building Class
R3-2Zoning
120,184 sfGross Floor Area
152Units
LL97 CoveredRent Stabilized97 Open Violations ▸
Walk-up cooperative · Owner of record: HOLLISWOOD OWNERS CORP · 222,175 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (16)Filed (3)Permit Issued (3)Signed Off (3)Violation (2)Special Inspection (5)
11/25/2025
Violation issued (HPD, open)
I
01/20/2022
Signed off — Alteration
NEW 8-FOOT-HIGH CHAINLINK TEMPORARY CONSTRUCTION FENCE W/ GATES. NOTE: Work Qualifies for chain-link fence per BC Sec. 3307.7(2) As proposed work is a facade restoration on a 2-Family-2-Story building (less than 40 high w/Setback 15 ft. min from sidewalk
Q00537429-I1
11/01/2021
Signed off — Alteration
RE-INSTALLATION OF EXISTING BRICK VENEER WALL AT SELECTED LOCATIONS OF 2-STORY-2 FAMILY WOOD FRAME BUILDING. NO CHANGE OF USE, EGRESS, OCCUPANCY, BULK OR HEIGHT UNDER THIS APPLICATION.
Q00496889-I1
07/07/2021
Permit issued — Construction Fence
Q00537429-I1-FN
06/17/2021
Permit issued — General Construction
Q00496889-I1-GC
06/11/2021
Filed — Alteration
NEW 8-FOOT-HIGH CHAINLINK TEMPORARY CONSTRUCTION FENCE W/ GATES. NOTE: Work Qualifies for chain-link fence per BC Sec. 3307.7(2) As proposed work is a facade restoration on a 2-Family-2-Story building (less than 40 high w/Setback 15 ft. min from sidewalk
Q00537429-I1
06/09/2021
Special inspection requirement — Final
CHRISTOPHER COMPTON
04/09/2021
Filed — Alteration
RE-INSTALLATION OF EXISTING BRICK VENEER WALL AT SELECTED LOCATIONS OF 2-STORY-2 FAMILY WOOD FRAME BUILDING. NO CHANGE OF USE, EGRESS, OCCUPANCY, BULK OR HEIGHT UNDER THIS APPLICATION.
Q00496889-I1
04/01/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sajjad Malik
04/01/2021
Special inspection requirement — Masonry
Sajjad Malik
04/01/2021
Special inspection requirement — Final
Sajjad Malik
10/02/2020
Signed off — Alteration
Q00338000-I1
03/30/2020
Filed — Alteration
Q00338000-I1
03/30/2020
Permit issued — Construction Fence
Q00338000-I1-FN
03/26/2020
Special inspection requirement — Final
ZAINAB FAISAL
10/15/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOLLISWOOD OWNERS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRISTOPHER COMPTON106/11/2021
MAR ARCHITECTURE & ENGINEERING P.C.204/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAR DESIGN SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATLANTIC SPECIALTY INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S.A.M. ARCHITECTURE5901104/09/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offATLANTIC SPECIALTY INC07/07/2021
DOB NOWGeneral ConstructionSigned-offATLANTIC SPECIALTY INC06/17/2021
DOB NOWConstruction FenceSigned-offATLANTIC SPECIALTY INC03/30/2020
BISOTISSUEDATLANTIC SPECIALTY INC05/28/2020
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/09/2021FinalCHRISTOPHER COMPTONprogress
04/01/2021Structural Stability – Alterations of existing buildingsSajjad Malikspecial
04/01/2021MasonrySajjad Malikspecial
04/01/2021FinalSajjad Malikprogress
03/26/2020FinalZAINAB FAISALprogress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/27/2026Q00496889-I1Request digital key ↗
08/27/2026Q00537429-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00338000-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/30/2020440587198Open ↗
▸BISWORK PERMIT APPLICATION1
03/30/2020440587198Open ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026Q00496889-I1Open ↗
09/01/2026Q00338000-I1Open ↗
08/26/2026Q00537429-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00496889-I1Open ↗
08/13/2026Q00537429-I1Open ↗
08/13/2026Q00338000-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00496889-I1Open ↗
09/02/2026Q00496889-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/30/2020440587198Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/30/2020440587198Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/30/2020440587198Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026Q00338000-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/30/2020440587198Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026Q00496889-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/30/2020440587198Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/01/2020440587198Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/30/2020440587198Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/13/2020440587198Open ↗
03/30/2020440587198Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/13/2020440587198Open ↗
11/13/2020440587198Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/30/2020440587198Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/01/2020440587198Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/30/2020440587198Open ↗