← Back
Walk-up cooperative
196-01 POMPEII AVENUE
QUEENS · BIN 4460567
💬 Discuss this project
1950Year Built
2Stories
C6Building Class
R3-2Zoning
120,184 sfGross Floor Area
152Units
LL97 CoveredRent Stabilized97 Open Violations ▸
Walk-up cooperative · Owner of record: HOLLISWOOD OWNERS CORP · 222,175 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOLLISWOOD OWNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAR ARCHITECTURE & ENGINEERING P.C.204/14/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATLANTIC SPECIALTY INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S.A.M. ARCHITECTURE5901104/09/2021
Building Lifecycle
All (17)Filed (2)Permit Issued (1)Signed Off (1)Violation (2)Objection (8)Special Inspection (3)
11/25/2025
Violation issued (HPD, open)
I
11/01/2021
Signed off — Alteration
RE-INSTALLATION OF EXISTING BRICK VENEER WALL AT SELECTED LOCATIONS OF 2-STORY-2 FAMILY WOOD FRAME BUILDING. NO CHANGE OF USE, EGRESS, OCCUPANCY, BULK OR HEIGHT UNDER THIS APPLICATION.
Q00497418-I1
06/17/2021
Permit issued — General Construction
Q00497418-I1-GC
04/15/2021
Objection raised — Fire_Protection
04/15/2021
Objection resolved — Addressed
04/15/2021
Objection raised — Structural
04/15/2021
Objection resolved — Addressed
04/15/2021
Objection raised — Inspections
04/15/2021
Objection resolved — Addressed
04/15/2021
Objection raised — Fire_Protection
04/15/2021
Objection resolved — Addressed
04/14/2021
Filed — Alteration
NEW 8-FOOT-HIGH CHAINLINK TEMPORARY CONSTRUCTION FENCE W/ GATES. NOTE: Work Qualifies for chain-link fence per BC Sec. 3307.7(2) As proposed work is a facade restoration on a 2-Family-2-Story building (less than 40 high w/Setback 15 ft. min from sidewalk
Q00500959-I1
04/09/2021
Filed — Alteration
RE-INSTALLATION OF EXISTING BRICK VENEER WALL AT SELECTED LOCATIONS OF 2-STORY-2 FAMILY WOOD FRAME BUILDING. NO CHANGE OF USE, EGRESS, OCCUPANCY, BULK OR HEIGHT UNDER THIS APPLICATION.
Q00497418-I1
04/02/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sajjad Malik
04/02/2021
Special inspection requirement — Masonry
Sajjad Malik
04/02/2021
Special inspection requirement — Final
Sajjad Malik
10/15/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offATLANTIC SPECIALTY INC06/17/2021
1 job · most recent 04/14/2021
Fence
FiledStatusContractorScope
04/14/2021——Fence
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/02/2021Structural Stability – Alterations of existing buildingsSajjad Malikspecial
04/02/2021MasonrySajjad Malikspecial
04/02/2021FinalSajjad Malikprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026Q00497418-I1Request digital key ↗
08/15/2026Q00500959-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026Q00497418-I1Open ↗
08/27/2026Q00500959-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00497418-I1Open ↗
09/01/2026Q00497418-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q00497418-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026Q00497418-I1Open ↗