← Back
Walk-up cooperative
196-01 POMPEII AVENUE
QUEENS · BIN 4460580
💬 Discuss this project
1950Year Built
2Stories
C6Building Class
R3-2Zoning
120,184 sfGross Floor Area
152Units
LL97 CoveredRent Stabilized97 Open Violations ▸
Walk-up cooperative · Owner of record: HOLLISWOOD OWNERS CORP · 222,175 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (22)Filed (4)Permit Issued (9)Signed Off (3)Violation (2)Special Inspection (4)
11/25/2025
Violation issued (HPD, open)
I
09/12/2022
Signed off — Alteration
Q00537444-I1
08/22/2022
Signed off — Alteration
RE-INSTALLATION OF EXISTING BRICK VENEER WALL AT SELECTED LOCATIONS OF 2-STORY-2 FAMILY WOOD FRAME BUILDING. NO CHANGE OF USE, EGRESS, OCCUPANCY, BULK OR HEIGHT UNDER THIS APPLICATION.
Q00496970-I1
05/06/2022
Permit issued — Construction Fence
Q00537444-I1-FN
05/06/2022
Permit issued — General Construction
Q00496970-I1-GC
04/20/2022
Permit issued — Construction Fence
Q00537444-I1-FN
04/18/2022
Permit issued — General Construction
Q00496970-I1-GC
12/15/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sajjad Malik
12/15/2021
Special inspection requirement — Masonry
Sajjad Malik
12/15/2021
Special inspection requirement — Final
Sajjad Malik
12/14/2021
Filed — Alteration
RE-INSTALLATION OF EXISTING BRICK VENEER WALL AT SELECTED LOCATIONS OF 2-STORY-2 FAMILY WOOD FRAME BUILDING. NO CHANGE OF USE, EGRESS, OCCUPANCY, BULK OR HEIGHT UNDER THIS APPLICATION.
Q00496970-P1
11/05/2021
Permit issued — Construction Fence
Q00537444-I1-FN
11/03/2021
Permit issued — General Construction
Q00496970-I1-GC
06/17/2021
Permit issued — Construction Fence
Q00537444-I1-FN
06/17/2021
Permit issued — General Construction
Q00496970-I1-GC
06/11/2021
Filed — Alteration
Q00537444-I1
04/09/2021
Filed — Alteration
RE-INSTALLATION OF EXISTING BRICK VENEER WALL AT SELECTED LOCATIONS OF 2-STORY-2 FAMILY WOOD FRAME BUILDING. NO CHANGE OF USE, EGRESS, OCCUPANCY, BULK OR HEIGHT UNDER THIS APPLICATION.
Q00496970-I1
05/21/2020
Signed off — Alteration
New 8'-0" high wood Temporary Construction Fence With Gates
Q00313771-I1
02/14/2020
Filed — Alteration
New 8'-0" high wood Temporary Construction Fence With Gates
Q00313771-I1
02/14/2020
Permit issued — Construction Fence
Q00313771-I1-FN
02/11/2020
Special inspection requirement — Final
Sajjad Malik
10/15/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOLLISWOOD OWNERS503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAR ARCHITECTURE & ENGINEERING P.C.312/14/2021
CHRISTOPHER COMPTON106/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAR DESIGN SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATLANTIC SPECIALTY INCGeneral Contractor707/08/2026
LINEAL CONSTRUCTION & RESGeneral Contractor407/08/2026
MAR CODE INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S.A.M. ARCHITECTURE5901212/14/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offLINEAL CONSTRUCTION & RES05/06/2022
DOB NOWGeneral ConstructionSigned-offLINEAL CONSTRUCTION & RES05/06/2022
DOB NOWConstruction FenceSigned-offMAR CODE INC04/20/2022
DOB NOWGeneral ConstructionSigned-offMAR CODE INC04/18/2022
DOB NOWConstruction FenceSigned-offATLANTIC SPECIALTY INC11/05/2021
DOB NOWGeneral ConstructionSigned-offATLANTIC SPECIALTY INC11/03/2021
DOB NOWConstruction FenceSigned-offATLANTIC SPECIALTY INC06/17/2021
DOB NOWGeneral ConstructionSigned-offATLANTIC SPECIALTY INC06/17/2021
DOB NOWConstruction FenceSigned-offATLANTIC SPECIALTY INC02/14/2020
BISOTISSUEDATLANTIC SPECIALTY INC03/06/2020
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
12/15/2021Structural Stability – Alterations of existing buildingsSajjad Malikspecial
12/15/2021MasonrySajjad Malikspecial
12/15/2021FinalSajjad Malikprogress
02/11/2020FinalSajjad Malikprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/27/2026Q00496970-P1Request digital key ↗
08/27/2026Q00496970-I1Request digital key ↗
08/27/2026Q00537444-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00313771-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/05/2020440584093Open ↗
▸BISWORK PERMIT APPLICATION1
03/05/2020440584093Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00496970-I1Open ↗
08/27/2026Q00496970-P1Open ↗
08/27/2026Q00537444-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q00496970-I1Open ↗
08/28/2026Q00496970-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q00496970-I1Open ↗
08/28/2026Q00313771-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/05/2020440584093Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/05/2020440584093Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/05/2020440584093Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
03/05/2020440584093Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00313771-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026Q00496970-I1Open ↗
08/27/2026Q00496970-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/05/2020440584093Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/04/2020440584093Open ↗
03/05/2020440584093Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/05/2020440584093Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/04/2020440584093Open ↗
▸BISNYCECC ANALYSIS1
03/05/2020440584093Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/04/2020440584093Open ↗
03/05/2020440584093Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/04/2020440584093Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/04/2020440584093Open ↗
03/05/2020440584093Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/05/2020440584093Open ↗