← Back
Two family frame
150-08 109 DRIVE
QUEENS · BIN 4464068
💬 Discuss this project
2002Year Built
2Stories
B2Building Class
R5DZoning
1,760 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family frame · Owner of record: 150-08 109 DRIVE LLC · 1,960 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE OWNER OF 150-08 109 D103/22/2026
EXCLUSIVE HOME CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARNOLD MONTAG ARCHITECT AM PM DESI203/21/2026
Building Lifecycle
All (78)Filed (3)Violation (28)Objection (17)Special Inspection (30)
11/25/2025
Violation issued (HPD, closed)
I
08/19/2025
Objection resolved — Resolved
08/18/2025
Objection resolved — Resolved
08/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/15/2025
Special inspection requirement — Concrete - Cast-In-Place
07/16/2025
Objection raised — Other
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/14/2025
Objection raised — Fire_Protection
07/14/2025
Objection raised — Plumbing
06/25/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed 6 family dwelling (2 story wood frame to be reconstructed as a 6 family non-combustible metal frame with stucco finish residence on the existing foundation.
Q01199013-S3
06/25/2025
Objection resolved — Addressed
06/25/2025
Objection resolved — Addressed
06/18/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed 6 family dwelling (2 story wood frame to be reconstructed as a 6 family non-combustible metal frame with stucco finish residence on the existing foundation.
Q01199013-S1
05/09/2025
Objection resolved — Addressed
05/09/2025
Objection resolved — Addressed
04/14/2025
Objection raised — Structural
04/14/2025
Objection raised — Zoning
04/14/2025
Objection raised — Admin
04/14/2025
Objection raised — Structural
04/14/2025
Objection raised — Zoning
04/14/2025
Objection raised — Scope
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/02/2025
Special inspection requirement — Sprinkler Systems
03/26/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed 6 family dwelling (2 story wood frame to be reconstructed as a 6 family non-combustible metal frame with stucco finish residence on the existing foundation.
Q01199013-I1
03/26/2025
Special inspection requirement — Ventilation and air distribution system
03/26/2025
Special inspection requirement — Air barrier — testing
03/24/2025
Special inspection requirement — Subgrade Inspections
03/24/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
03/24/2025
Special inspection requirement — Structural Cold-Formed Steel
03/24/2025
Special inspection requirement — Structural Steel - Details
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
03/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
03/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
03/24/2025
Special inspection requirement — Fenestration areas
03/24/2025
Special inspection requirement — Insulation placement and R values
03/24/2025
Special inspection requirement — Maintenance information
03/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
03/24/2025
Special inspection requirement — Air barrier - visual inspection
03/24/2025
Special inspection requirement — Interior lighting power
03/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
03/24/2025
Special inspection requirement — Fenestration air leakage
03/24/2025
Special inspection requirement — Protection of exposed foundation insulation
03/24/2025
Special inspection requirement — Metering
03/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
03/24/2025
Special inspection requirement — Structural Wood Frame
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/24/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/24/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/24/2025
Special inspection requirement — Structural Steel - High Strength Bolting
03/24/2025
Special inspection requirement — Structural Steel - Welding
05/23/2024
Violation issued (HPD, closed)
B
05/23/2024
Violation issued (HPD, closed)
B
05/23/2024
Violation issued (HPD, closed)
A
05/23/2024
Violation issued (HPD, closed)
A
05/23/2024
Violation issued (HPD, closed)
B
05/23/2024
Violation issued (HPD, closed)
A
05/23/2024
Violation issued (HPD, closed)
B
05/23/2024
Violation issued (HPD, closed)
A
05/23/2024
Violation issued (HPD, closed)
B
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDTOM BRAUN P & H INC06/30/2006
BISOTISSUEDGOLDSMITH CONSTRUCTION CORP06/29/2006
BISPLISSUEDWAGNER ZIV PLG AND HEATING CORP10/25/2002
BISEQISSUEDKEREN'S CONSTRUCTION10/08/2002
1 project · most recent 06/25/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
06/25/2025——Heating and Air Conditioning Systems
1 project · most recent 06/25/2025
Steel Concrete
FiledStatusContractorScope
06/25/2025——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/15/2025Concrete - Cast-In-Place—special
04/04/2025Fire-Resistant Penetrations and Joints—special
04/02/2025Sprinkler Systems—special
03/26/2025Ventilation and air distribution system—energy_progress
03/26/2025Air barrier — testing —energy_progress
03/24/2025Subgrade Inspections—special
03/24/2025Wall Panels, Curtain Walls, and Veneers—special
03/24/2025Structural Cold-Formed Steel—special
03/24/2025Structural Steel - Details—special
03/24/2025Energy Code Compliance Inspections—progress
03/24/2025Fire-Resistance Rated Construction—progress
03/24/2025HVAC-R and service water piping design and insulation—energy_progress
03/24/2025Fenestration areas—energy_progress
03/24/2025Insulation placement and R values—energy_progress
03/24/2025Maintenance information—energy_progress
03/24/2025HVAC-R and service water heating equipment—energy_progress
03/24/2025Air barrier - visual inspection—energy_progress
03/24/2025Interior lighting power—energy_progress
03/24/2025HVAC-R and service water heating system controls—energy_progress
03/24/2025Fenestration air leakage—energy_progress
03/24/2025Protection of exposed foundation insulation—energy_progress
03/24/2025Metering—energy_progress
03/24/2025Fenestration and door U-factor and product ratings—energy_progress
03/24/2025Structural Wood Frame—progress
Latest 25 of 35.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026Q01199013-S3Request digital key ↗
08/19/2026Q01199013-I1Request digital key ↗
08/19/2026Q01199013-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q01199013-S1Open ↗
08/13/2026Q01199013-S3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01199013-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01199013-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01199013-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q01199013-S1Open ↗
08/13/2026Q01199013-S3Open ↗
08/13/2026Q01199013-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01199013-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026Q01199013-I1Open ↗
08/13/2026Q01199013-S3Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q01199013-I1Open ↗
08/13/2026Q01199013-S1Open ↗
08/13/2026Q01199013-S3Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01199013-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01199013-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01199013-S3Open ↗
08/13/2026Q01199013-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q01199013-I1Open ↗
08/13/2026Q01199013-S3Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01199013-I1Open ↗