← Back
Bungalow colony - cooperatively owned land
202-30 ROCKAWAY POINT BLVD
QUEENS · BIN 4464968
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
460,000 sfGross Floor Area
539Units
LL97 Covered11 Open Violations 2 unresolved · 9 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 3,589,344 sf lot · 0.13 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction8p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/06/2025
CMC DESIGN ARCHITECT, P.C.403/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAND-BAR CONTRACTORS INCGeneral Contractor307/08/2026
JOSEPH O'GRADY P & H INCPlumbing207/08/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/06/2025
CMC DESIGN ARCHITECT, P.C2984101/04/2024
Building Lifecycle
All (61)Filed (5)Permit Issued (5)Inspection (7)Objection (14)Special Inspection (30)
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2026
Permit issued — Plumbing
Q00960708-S1-PL
12/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/13/2025
Permit issued — Solar
Q01266702-I1-SL
08/06/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01266702-I1
08/06/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
08/05/2025
Special inspection requirement — Final
Walid Abdulla
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/05/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/05/2025
Filed — Alteration CO
temporary construction fence in conjunction with enlargement.
Q00960708-P1
03/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Gary Lenhart
03/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Gary Lenhart
02/07/2025
Permit issued — Plumbing
Q00960708-S1-PL
01/30/2025
Objection resolved — Addressed
12/03/2024
Objection raised — Other
11/27/2024
Permit issued — Structural
Q00960708-I1-GC-CX
11/21/2024
Objection resolved — Addressed
11/13/2024
Permit issued — Construction Fence
Q00960708-S2-FN
05/24/2024
Objection resolved — Addressed
05/02/2024
Objection resolved — Addressed
03/21/2024
Special inspection requirement — Interior lighting power
Gary Lenhart
03/21/2024
Special inspection requirement — Ventilation and air distribution system
Gary Lenhart
03/21/2024
Special inspection requirement — Permanent certificate
Gary Lenhart
02/07/2024
Objection raised — Other
02/05/2024
Objection resolved — Addressed
02/05/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Gary Lenhart
02/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
Gary Lenhart
02/05/2024
Special inspection requirement — Lowest Floor Elevation
Gary Lenhart
02/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Gary Lenhart
02/05/2024
Special inspection requirement — Structural Wood Frame
Gary Lenhart
01/23/2024
Objection raised — Other
01/23/2024
Objection raised — Other
01/23/2024
Objection raised — Energy
01/22/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
01/19/2024
Objection raised — Other
01/16/2024
Objection raised — Other
01/05/2024
Filed — Alteration CO
temporary construction fence in conjunction with enlargement.
Q00960708-S1
01/05/2024
Filed — Alteration CO
temporary construction fence in conjunction with enlargement.
Q00960708-S2
01/04/2024
Filed — Alteration CO
temporary construction fence in conjunction with enlargement.
Q00960708-I1
01/04/2024
Special inspection requirement — Concrete - Cast-In-Place
Gary Lenhart
11/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
Gary Lenhart
11/30/2023
Special inspection requirement — Wood – Prefabricated I-Joists
Gary Lenhart
11/30/2023
Special inspection requirement — Fenestration areas
Gary Lenhart
11/30/2023
Special inspection requirement — Air barrier - visual inspection
Gary Lenhart
11/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Gary Lenhart
11/30/2023
Special inspection requirement — Insulation placement and R values
Gary Lenhart
11/30/2023
Special inspection requirement — Fenestration air leakage
Gary Lenhart
11/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
Gary Lenhart
11/30/2023
Special inspection requirement — Maintenance information
Gary Lenhart
11/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Gary Lenhart
11/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Gary Lenhart
11/09/2023
Special inspection requirement — Final
Gary Lenhart
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOSEPH O'GRADY P & H INC01/21/2026
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/13/2025
DOB NOWPlumbingPermit IssuedJOSEPH O'GRADY P & H INC02/07/2025
DOB NOWStructuralPermit IssuedSAND-BAR CONTRACTORS INC11/27/2024
DOB NOWConstruction FencePermit IssuedSAND-BAR CONTRACTORS INC11/13/2024
1 project · most recent 03/05/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/05/2025Permit IssuedSAND-BAR CONTRACTORS INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric multi zone 24,000 BTU · Condensing Unit ×1
1 project · most recent 03/05/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/05/2025Permit IssuedJOSEPH O'GRADY P & H INCGas, Water/Sanitary
4 projects · most recent 11/19/2025
General Wiring
FiledStatusContractorScope
11/19/2025Permit IssuedSUNRUN SOLAR ELECTL CORP2 meters, 1 new_meters
10/27/2025Permit IssuedG.E.O. ELECTRIC CORPGeneral Wiring
04/07/2025CompleteG.E.O. ELECTRIC CORPGeneral Wiring
07/06/2023CompleteJ.A. LEE ELEC SVCS LLC3 meters, 1 new_meters
1 project · most recent 03/05/2025
Concrete Wood
FiledStatusContractorScope
03/05/2025Permit IssuedJOSEPH O'GRADY P & H INCConcrete, Wood
1 project · most recent 08/06/2025
FiledStatusContractorScope
08/06/2025Signed-offSUNRUN INSTALLATION SVC10 panels, 4.05 kw, 211.2 roof_area_sqft
1 project · most recent 03/05/2025
Fence
FiledStatusContractorScope
03/05/2025Permit IssuedJOSEPH O'GRADY P & H INCFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/06/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
08/05/2025FinalWalid Abdullaprogress
08/05/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/05/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/05/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
08/05/2025Energy Code Compliance InspectionsWalid Abdullaprogress
03/05/2025HVAC-R and service water piping design and insulationGary Lenhartenergy_progress
03/05/2025Energy Code Compliance InspectionsGary Lenhartprogress
03/21/2024Interior lighting powerGary Lenhartenergy_progress
03/21/2024Ventilation and air distribution systemGary Lenhartenergy_progress
03/21/2024Permanent certificateGary Lenhartenergy_progress
02/05/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Gary Lenhartspecial
02/05/2024Fire-Resistance Rated ConstructionGary Lenhartprogress
02/05/2024Lowest Floor ElevationGary Lenhartprogress
02/05/2024Energy Code Compliance InspectionsGary Lenhartprogress
02/05/2024Structural Wood FrameGary Lenhartprogress
01/04/2024Concrete - Cast-In-PlaceGary Lenhartspecial
11/30/2023HVAC-R and service water heating equipmentGary Lenhartenergy_progress
11/30/2023Wood – Prefabricated I-JoistsGary Lenhartspecial
11/30/2023Fenestration areasGary Lenhartenergy_progress
11/30/2023Air barrier - visual inspectionGary Lenhartenergy_progress
11/30/2023HVAC-R and service water piping design and insulationGary Lenhartenergy_progress
11/30/2023Insulation placement and R valuesGary Lenhartenergy_progress
11/30/2023Fenestration air leakageGary Lenhartenergy_progress
11/30/2023HVAC-R and service water heating system controlsGary Lenhartenergy_progress
Latest 25 of 30.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026Q00960708-P1Request digital key ↗
08/23/2026Q00960708-S2Request digital key ↗
08/23/2026Q00960708-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00960708-P2Open ↗
08/13/2026Q00960708-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026Q01266702-I1Open ↗
08/31/2026Q01266702-I1Open ↗
08/31/2026Q01266702-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026Q00960708-I1Open ↗
08/23/2026Q00960708-P2Open ↗
08/23/2026Q00960708-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026Q01266702-I1Open ↗
08/31/2026Q01266702-I1Open ↗
08/31/2026Q01266702-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026Q00960708-I1Open ↗
08/23/2026Q00960708-P1Open ↗
08/23/2026Q00960708-S2Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01266702-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026Q00960708-P2Open ↗
08/13/2026Q00960708-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00960708-I1Open ↗
08/13/2026Q00960708-P2Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00960708-I1Open ↗
08/13/2026Q00960708-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026Q00960708-I1Open ↗
08/23/2026Q00960708-P2Open ↗