← Back
Bungalow colony - cooperatively owned land
202-30 ROCKAWAY POINT BLVD
QUEENS · BIN 4465416
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
460,000 sfGross Floor Area
539Units
LL97 Covered11 Open Violations 2 unresolved · 9 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 3,589,344 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 11/03/2025
FiledStatusContractorScope
11/03/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 job · most recent 04/08/2026
Wood
FiledStatusContractorScope
04/08/2026——Wood
Building Lifecycle
All (18)Filed (3)Permit Issued (2)Signed Off (1)Objection (5)Special Inspection (7)
09/22/2026
Permit issued — General Construction
Q01448964-I1-GC
08/25/2026
Filed — Alteration
PROPOSED DECK
Q01448964-I1
08/20/2026
Special inspection requirement — Final
LEON SKVIRSKY
05/21/2026
Objection raised — Other
04/23/2026
Objection raised — Scope
04/23/2026
Objection resolved — Open
04/23/2026
Objection raised — Other
04/23/2026
Objection resolved — Open
04/08/2026
Filed — Alteration
PROPOSED DECK
Q01382506-I1
02/17/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01312118-I1
11/06/2025
Permit issued — Solar
Q01312118-I1-SL
11/03/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01312118-I1
11/03/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
11/03/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/31/2025
Special inspection requirement — Final
Walid Abdulla
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE209/23/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE108/25/2026
NORMAN C. LOK, PE104/08/2026
PARKER AND WEST ENGINEERING, PLLC111/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SIMPLY STRONG CONSTRUCTGeneral Contractor109/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/03/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSIMPLY STRONG CONSTRUCT09/22/2026
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/06/2025
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/20/2026FinalLEON SKVIRSKYprogress
11/03/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
11/03/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
11/03/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/31/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/31/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/31/2025FinalWalid Abdullaprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026Q01382506-I1Request digital key ↗
08/26/2026Q01448964-I1Request digital key ↗
08/18/2026Q01312118-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026Q01448964-I1Open ↗
09/01/2026Q01312118-I1Open ↗
09/01/2026Q01312118-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026Q01382506-I1Open ↗
08/26/2026Q01448964-I1Open ↗
08/18/2026Q01312118-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q01312118-I1Open ↗
09/01/2026Q01312118-I1Open ↗
09/01/2026Q01312118-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01312118-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/29/2026Q01382506-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01312118-I1Open ↗