Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
QUEENS · BIN 4466789
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Floor 2Under Construction5p · 1 filing · 20 docs
Floor 1Under Construction5p · 1 filing · 20 docs
CellarUnder Construction5p · 2 filings · 20 docs
2 jobs · most recent 03/09/2026
Heating Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
03/09/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
11/25/2025Permit IssuedSIMPLY STRONG CONSTRUCTHeating Systems
2 jobs · most recent 03/09/2026
Wood
FiledStatusContractorScope
03/09/2026——Wood
11/25/2025Permit IssuedSIMPLY STRONG CONSTRUCT3 scope_items
1 job · most recent 11/25/2025
Fence
FiledStatusContractorScope
11/25/2025Permit IssuedSIMPLY STRONG CONSTRUCTFence
Building Lifecycle
All (91)Filed (5)Permit Issued (2)Objection (54)Special Inspection (30)
04/21/2026
Objection resolved — Addressed
04/21/2026
Objection resolved — Open
04/21/2026
Objection resolved — Open
04/20/2026
Objection raised — Zoning
04/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/30/2026
Permit issued — General Construction
Q00960934-I1-GC-CX
03/24/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/19/2026
Objection raised — Plumbing
03/19/2026
Objection raised — Admin
03/19/2026
Objection raised — Admin
03/19/2026
Objection raised — Other
03/19/2026
Objection raised — Structural
03/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
ALTERATION TYPE I TO ENLARGE FIRST FLOOR AND CONSTRUCT A NEW SECOND FLOOR
Q01363638-I1
03/09/2026
Special inspection requirement — Mechanical Systems
FRANK VILLANO
03/09/2026
Special inspection requirement — Fenestration air leakage
FRANK VILLANO
03/09/2026
Special inspection requirement — Subgrade Inspections
FRANK VILLANO
03/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANK VILLANO
03/09/2026
Special inspection requirement — Air barrier — testing
03/09/2026
Special inspection requirement — Lowest Floor Elevation
FRANK VILLANO
03/09/2026
Special inspection requirement — Footing and Foundation
FRANK VILLANO
03/09/2026
Special inspection requirement — Energy Code Compliance Inspections
FRANK VILLANO
03/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
FRANK VILLANO
03/09/2026
Special inspection requirement — Final
FRANK VILLANO
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK VILLANO
03/09/2026
Special inspection requirement — Interior lighting power
FRANK VILLANO
03/09/2026
Special inspection requirement — Air barrier - visual inspection
FRANK VILLANO
03/09/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FRANK VILLANO
03/09/2026
Special inspection requirement — Maintenance information
FRANK VILLANO
03/09/2026
Special inspection requirement — Insulation placement and R values
FRANK VILLANO
03/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK VILLANO
03/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
FRANK VILLANO
03/09/2026
Special inspection requirement — Ventilation and air distribution system
FRANK VILLANO
03/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
FRANK VILLANO
03/09/2026
Special inspection requirement — Fenestration areas
FRANK VILLANO
03/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK VILLANO
03/09/2026
Special inspection requirement — Metering
FRANK VILLANO
03/09/2026
Special inspection requirement — Permanent certificate
FRANK VILLANO
03/09/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
FRANK VILLANO
03/09/2026
Special inspection requirement — Concrete - Cast-In-Place
FRANK VILLANO
03/05/2026
Special inspection requirement — Wood – Prefabricated I-Joists
03/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/05/2026
Special inspection requirement — Protection of exposed foundation insulation
02/24/2026
Objection resolved — Addressed
02/05/2026
Objection raised — Scope
01/27/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Admin
01/07/2026
Objection resolved — Addressed
12/31/2025
Permit issued — Construction Fence
Q00960934-S2-FN
12/08/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
12/05/2025
Objection raised — Energy
12/05/2025
Objection raised — Structural
12/05/2025
Objection raised — Cost
12/05/2025
Objection raised — Structural
11/25/2025
Filed — Alteration
INSTALL 8' TEMPORARY WOOD CONSTRUCTION FENCE
Q00960934-P1
10/17/2024
Objection resolved — Addressed
09/13/2024
Filed — Alteration
INSTALL 8' TEMPORARY WOOD CONSTRUCTION FENCE
Q00960934-S1
Latest 60 of 91 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.1304/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAYM S. GROSS, ARCHITECT103/09/2026
JRS ENGINEERING SERVICES411/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIMPLY STRONG CONSTRUCTGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FP VILLANO CONSULTING ENG8575101/30/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSIMPLY STRONG CONSTRUCT03/30/2026
DOB NOWConstruction FencePermit IssuedSIMPLY STRONG CONSTRUCT12/31/2025
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
04/09/2026Duct leakage testing, insulation and design—energy_progress
03/09/2026Concrete - Cast-In-PlaceFRANK VILLANOspecial
03/09/2026Fire-Resistant Penetrations and JointsFRANK VILLANOspecial
03/09/2026Subsurface Investigations (Borings/Test Pits)FRANK VILLANOspecial
03/09/2026Subgrade InspectionsFRANK VILLANOspecial
03/09/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)FRANK VILLANOspecial
03/09/2026Mechanical SystemsFRANK VILLANOspecial
03/09/2026Lowest Floor ElevationFRANK VILLANOprogress
03/09/2026Footing and FoundationFRANK VILLANOprogress
03/09/2026Energy Code Compliance InspectionsFRANK VILLANOprogress
03/09/2026Fire-Resistance Rated ConstructionFRANK VILLANOprogress
03/09/2026FinalFRANK VILLANOprogress
03/09/2026Permanent certificateFRANK VILLANOenergy_progress
03/09/2026Air barrier — testing —energy_progress
03/09/2026Air barrier - visual inspectionFRANK VILLANOenergy_progress
03/09/2026Fenestration air leakageFRANK VILLANOenergy_progress
03/09/2026Maintenance informationFRANK VILLANOenergy_progress
03/09/2026Insulation placement and R valuesFRANK VILLANOenergy_progress
03/09/2026HVAC-R and service water piping design and insulationFRANK VILLANOenergy_progress
03/09/2026HVAC-R and service water heating system controlsFRANK VILLANOenergy_progress
03/09/2026Ventilation and air distribution systemFRANK VILLANOenergy_progress
03/09/2026HVAC-R and service water heating equipmentFRANK VILLANOenergy_progress
03/09/2026Fenestration areasFRANK VILLANOenergy_progress
03/09/2026Fenestration and door U-factor and product ratingsFRANK VILLANOenergy_progress
03/09/2026MeteringFRANK VILLANOenergy_progress
Latest 25 of 76.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026Q00960934-P1Request digital key ↗
08/18/2026Q00960934-S2Request digital key ↗
08/18/2026Q00960934-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/18/2026Q00960934-I1Open ↗
08/17/2026Q01363638-I1Open ↗
08/13/2026Q00960934-P1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026Q00960934-I1Open ↗
09/01/2026Q00960934-I1Open ↗
09/01/2026Q00960934-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00960934-I1Open ↗
09/01/2026Q00960934-I1Open ↗
09/01/2026Q00960934-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026Q00960934-I1Open ↗
08/17/2026Q01363638-I1Open ↗
08/13/2026Q00960934-S1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026Q01363638-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026Q01363638-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026Q01363638-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026Q00960934-I1Open ↗
08/17/2026Q01363638-I1Open ↗
08/13/2026Q00960934-P1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/18/2026Q00960934-I1Open ↗
08/17/2026Q01363638-I1Open ↗
08/13/2026Q00960934-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026Q01363638-I1Open ↗
08/13/2026Q00960934-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/18/2026Q00960934-I1Open ↗
08/17/2026Q01363638-I1Open ↗
08/13/2026Q00960934-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/18/2026Q00960934-I1Open ↗
08/17/2026Q01363638-I1Open ↗
08/13/2026Q00960934-P1Open ↗
▸DOB NOWPlot Diagram2
08/18/2026Q00960934-I1Open ↗
08/13/2026Q00960934-P1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01363638-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/18/2026Q00960934-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/17/2026Q01363638-I1Open ↗