Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
QUEENS · BIN 4467202
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone X500
Locations of Work
ArchitectureCivil
Floor 31p · 1 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.3107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUNGALOW DESIGN & ENGINEERING PC601/03/2025
PARKER AND WEST ENGINEERING, PLLC102/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIMPLY STRONG CONSTRUCTGeneral Contractor1907/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
JOSEPH O'GRADY P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUNGALOW DESIGN & ENGINEE4105501/03/2025
PARKER AND WEST ENGINEERI5272102/20/2024
Building Lifecycle
All (62)Filed (7)Permit Issued (9)Signed Off (4)Inspection (8)Objection (4)Special Inspection (30)
02/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/04/2025
Special inspection requirement — Lowest Floor Elevation
Deidre Duffy
02/04/2025
Special inspection requirement — Fenestration areas
Deidre Duffy
02/04/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Deidre Duffy
02/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Deidre Duffy
02/04/2025
Special inspection requirement — Duct leakage testing, insulation and design
Deidre Duffy
02/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Deidre Duffy
02/04/2025
Special inspection requirement — Concrete - Cast-In-Place
Deidre Duffy
02/04/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Deidre Duffy
02/04/2025
Special inspection requirement — Footing and Foundation
Deidre Duffy
02/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
Deidre Duffy
02/04/2025
Special inspection requirement — Metering
Deidre Duffy
02/04/2025
Special inspection requirement — Air barrier — testing
Deidre Duffy
02/04/2025
Special inspection requirement — Fireplaces
Deidre Duffy
02/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Deidre Duffy
02/04/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Deidre Duffy
02/04/2025
Special inspection requirement — Heating Systems
Deidre Duffy
02/04/2025
Special inspection requirement — Mechanical Systems
Deidre Duffy
02/04/2025
Special inspection requirement — Subgrade Inspections
Deidre Duffy
02/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Deidre Duffy
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Deidre Duffy
02/04/2025
Special inspection requirement — Final
Deidre Duffy
02/04/2025
Special inspection requirement — Structural Wood Frame
Deidre Duffy
02/04/2025
Special inspection requirement — Interior lighting power
Deidre Duffy
02/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Deidre Duffy
02/04/2025
Special inspection requirement — Air barrier - visual inspection
Deidre Duffy
02/04/2025
Special inspection requirement — Fenestration air leakage
Deidre Duffy
02/04/2025
Special inspection requirement — Insulation placement and R values
Deidre Duffy
02/04/2025
Special inspection requirement — Maintenance information
Deidre Duffy
02/04/2025
Special inspection requirement — Ventilation and air distribution system
Deidre Duffy
02/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Deidre Duffy
01/03/2025
Filed — New Building
New plumbing work associated with NB Q00827109
Q00827109-P3
09/27/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/23/2024
Signed off — New Building
New plumbing work associated with NB Q00827109
Q00827109-S1
09/23/2024
Signed off — New Building
New plumbing work associated with NB Q00827109
Q00827109-S2
09/18/2024
Permit issued — General Construction
Q00827109-I1-MS
08/22/2024
Permit issued — Structural
Q00827109-I1-ST
06/24/2024
Signed off — Alteration
Q01007523-I1
06/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/22/2024
Permit issued — Solar
Q01007523-I1-SL
02/20/2024
Filed — Alteration
Q01007523-I1
02/02/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/29/2023
Permit issued — Plumbing
Q00827109-S1-PL
10/26/2023
Signed off — Full Demolition
HAND DEMOLITION OF 1-STORY RESIDENTIAL BUILDING.
Q00878399-I1
10/16/2023
Permit issued — Earth Work
Q00827109-I1-EA
10/16/2023
Permit issued — Earth Work
Q00827109-I1-GC
10/16/2023
Permit issued — Structural
Q00827109-I1-FO
09/19/2023
Permit issued — Full Demolition
Q00878399-I1-FD
09/08/2023
Permit issued — Construction Fence
Q00827109-S2-FN
09/05/2023
Objection resolved — Addressed
08/18/2023
Objection raised — Admin
08/07/2023
Filed — New Building
New plumbing work associated with NB Q00827109
Q00827109-P1
06/15/2023
Filed — Full Demolition
HAND DEMOLITION OF 1-STORY RESIDENTIAL BUILDING.
Q00878399-I1
05/31/2023
Filed — New Building
New plumbing work associated with NB Q00827109
Q00827109-S2
04/03/2023
Objection raised — Scope
04/03/2023
Objection resolved — Addressed
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSIMPLY STRONG CONSTRUCT09/18/2024
DOB NOWStructuralSigned-offSIMPLY STRONG CONSTRUCT08/22/2024
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/22/2024
DOB NOWPlumbingSigned-offJOSEPH O'GRADY P & H INC12/29/2023
DOB NOWEarth WorkSigned-offSIMPLY STRONG CONSTRUCT10/16/2023
DOB NOWEarth WorkPermit IssuedSIMPLY STRONG CONSTRUCT10/16/2023
DOB NOWStructuralSigned-offSIMPLY STRONG CONSTRUCT10/16/2023
DOB NOWFull DemolitionSigned-offSIMPLY STRONG CONSTRUCT09/19/2023
DOB NOWConstruction FenceSigned-offSIMPLY STRONG CONSTRUCT09/08/2023
1 project · most recent 01/03/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/03/2025Signed-offSIMPLY STRONG CONSTRUCTAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Trane TRANE 4TTR3036H 3 tons · Condensing Unit ×2
Heating
Navien NAVIEN NCB 240/130H 120,000 BTU · Boiler ×1
Ventilation
Panasonic Panasonic Intelli-Balance 200 200 CFM · Erv ×1
1 project · most recent 01/03/2025
Sprinkler System
FiledStatusContractorScope
01/03/2025——Sprinkler System
1 project · most recent 01/03/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
01/03/2025Signed-offJOSEPH O'GRADY P & H INCGas, Plumbing-Sprinkler, Water/Sanitary
2 projects · most recent 02/21/2024
General Wiring
FiledStatusContractorScope
02/21/2024CompletePAPPAS & FODERA ELECT'LGeneral Wiring
02/20/2024CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 01/03/2025
Wood
FiledStatusContractorScope
01/03/2025Signed-offSIMPLY STRONG CONSTRUCTWood
1 project · most recent 01/03/2025
Fence
FiledStatusContractorScope
01/03/2025Signed-offSIMPLY STRONG CONSTRUCTFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
02/04/2025Permanent certificateDeidre Duffyenergy_progress
02/04/2025HVAC-R and service water heating equipmentDeidre Duffyenergy_progress
02/04/2025Fenestration areasDeidre Duffyenergy_progress
02/04/2025Fenestration and door U-factor and product ratingsDeidre Duffyenergy_progress
02/04/2025HVAC-R and service water heating system controlsDeidre Duffyenergy_progress
02/04/2025Ventilation and air distribution systemDeidre Duffyenergy_progress
02/04/2025FireplacesDeidre Duffyenergy_progress
02/04/2025Maintenance informationDeidre Duffyenergy_progress
02/04/2025Insulation placement and R valuesDeidre Duffyenergy_progress
02/04/2025Duct leakage testing, insulation and designDeidre Duffyenergy_progress
02/04/2025Air barrier — testing Deidre Duffyenergy_progress
02/04/2025Fenestration air leakageDeidre Duffyenergy_progress
02/04/2025Air barrier - visual inspectionDeidre Duffyenergy_progress
02/04/2025MeteringDeidre Duffyenergy_progress
02/04/2025HVAC-R and service water piping design and insulationDeidre Duffyenergy_progress
02/04/2025Interior lighting powerDeidre Duffyenergy_progress
02/04/2025Lowest Floor ElevationDeidre Duffyprogress
02/04/2025Energy Code Compliance InspectionsDeidre Duffyprogress
02/04/2025Fire-Resistance Rated ConstructionDeidre Duffyprogress
02/04/2025Structural Wood FrameDeidre Duffyprogress
02/04/2025FinalDeidre Duffyprogress
02/04/2025Footing and FoundationDeidre Duffyprogress
02/04/2025Fire-Resistant Penetrations and JointsDeidre Duffyspecial
02/04/2025Subsurface Investigations (Borings/Test Pits)Deidre Duffyspecial
02/04/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Deidre Duffyspecial
Latest 25 of 106.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026Q00878399-I1Request digital key ↗
08/23/2026Q01007523-I1Request digital key ↗
08/21/2026Q00827109-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00827109-P3Open ↗
08/13/2026Q00827109-P1Open ↗
08/13/2026Q00827109-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00827109-I1Open ↗
▸Seals & Professional Certifications101
▸DOB NOWProgress Inspector Seal & Signature65
09/24/2026Q00827109-S1Open ↗
09/24/2026Q00827109-S1Open ↗
08/28/2026Q01007523-I1Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/24/2026Q00827109-S1Open ↗
08/28/2026Q01007523-I1Open ↗
08/28/2026Q01007523-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00878399-I1Open ↗
08/21/2026Q00827109-P1Open ↗
08/21/2026Q00827109-P3Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026Q00878399-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00878399-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q00878399-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00878399-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026Q00878399-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q00878399-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/13/2026Q00827109-I1Open ↗
08/13/2026Q00827109-P1Open ↗
08/13/2026Q00827109-P3Open ↗
▸DOB NOWSOIL REPORT3
08/13/2026Q00827109-P3Open ↗
08/13/2026Q00827109-P1Open ↗
08/13/2026Q00827109-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00827109-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01007523-I1Open ↗
▸Other Documents16
▸DOB NOWProperty Ownership Certification4
08/24/2026Q00878399-I1Open ↗
08/21/2026Q00827109-P3Open ↗
08/21/2026Q00827109-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00827109-P1Open ↗
08/13/2026Q00827109-P3Open ↗
08/13/2026Q00827109-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00827109-P3Open ↗
08/13/2026Q00827109-I1Open ↗
08/13/2026Q00827109-P1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00878399-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00878399-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00827109-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00827109-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00878399-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00827109-I1Open ↗