← Back
Two family brick
51-31 48 STREET
QUEENS · BIN 4473565
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R4Zoning
1,649 sfGross Floor Area
2Units
11 Open Violations 10 unresolved · 1 paperwork only ▸
Two family brick · 2,320 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (3)Inspection (1)Objection (2)
07/13/2026
Signed off — Alteration
A.REPAIR GARAGE CMU WALL AS PER PLANSB.REPOINT CMU WALL AS NEEDEDC.REPAIR BRICK BUTTRESS ON THE EAST WALLD.LEGALIZE ROOF FRAMING.E.RESOLVE VIOLATIONS NOS. 39160641XF.RESOLVE VIOLATION NO. V 091625C25-02152 & V 091725CFEU40209BSG.NO CHANGE ON USE, EGRESS O
Q01309346-I1
06/30/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/12/2026
Permit issued — General Construction
Q01309346-I1-GC
04/14/2026
Objection resolved — Resolved
04/08/2026
Objection raised — Cost
03/21/2026
Filed — Alteration
A.REPAIR GARAGE CMU WALL AS PER PLANSB.REPOINT CMU WALL AS NEEDEDC.REPAIR BRICK BUTTRESS ON THE EAST WALLD.LEGALIZE ROOF FRAMING.E.RESOLVE VIOLATIONS NOS. 39160641XF.RESOLVE VIOLATION NO. V 091625C25-02152 & V 091725CFEU40209BSG.NO CHANGE ON USE, EGRESS O
Q01309346-I1
09/17/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/2025
Violation issued (ECB, open)
Construction
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2015$680K—— → —$412/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAMIREZ ENGINEERING PLLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
N G A CONTRACTOR INCGeneral Contractor107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAMIREZ ENGINEERING PLLC8679103/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offN G A CONTRACTOR INC05/12/2026
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/30/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01309346-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01309346-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01309346-I1Open ↗