← Back
Two stories - detached, small or mid-size
143-03 POPLAR AVENUE
QUEENS · BIN 4484036
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R2AZoning
1,152 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,858 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STRUCTURAL ENGINEERING SYSTEM903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL SJ MAZZELLA, RA203/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK BUENO EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
360 PRESTIGE CONTRACTINGGeneral Contractor303/21/2026
DHC CONTRACTING INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUST CONSULTING ENGINEERI5865403/03/2023
Building Lifecycle
All (26)Filed (2)Permit Issued (2)Violation (1)Inspection (1)Objection (10)Special Inspection (10)
11/20/2023
Permit issued — Structural
Q08011288-I1-GC-CX
07/11/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/13/2023
Special inspection requirement — Electric vehicle service equipment requirements
XIAOJUN WANG
03/13/2023
Special inspection requirement — Structural Steel - Details
XIAOJUN WANG
03/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOJUN WANG
03/13/2023
Special inspection requirement — Structural Cold-Formed Steel
XIAOJUN WANG
03/13/2023
Special inspection requirement — Final
CALVIN TRAN
03/03/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
REPLACE EXISTING SINGLE CAR GARAG DAMAGED BY FALLEN TREE ON EXISTING FOOTINGS. CONSTRUCTION TO BE OF NON-COMBUSTIBLE CONSTRUCTION.
Q08011288-P1
02/22/2023
Special inspection requirement — Structural Cold-Formed Steel
XIAOJUN WANG
02/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOJUN WANG
02/22/2023
Special inspection requirement — Structural Steel - Details
XIAOJUN WANG
02/22/2023
Special inspection requirement — Final
CALVIN TRAN
02/22/2023
Special inspection requirement — Electric vehicle service equipment requirements
XIAOJUN WANG
11/03/2022
Permit issued — Structural
Q08011288-I1-GC-CX
10/01/2022
Objection raised — Zoning
10/01/2022
Objection resolved — Addressed
10/01/2022
Objection raised — Zoning
10/01/2022
Objection resolved — Addressed
10/01/2022
Objection raised — Inspections
10/01/2022
Objection resolved — Addressed
10/01/2022
Objection raised — Structural
10/01/2022
Objection resolved — Addressed
10/01/2022
Objection raised — Energy
10/01/2022
Objection resolved — Addressed
09/27/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
REPLACE EXISTING SINGLE CAR GARAG DAMAGED BY FALLEN TREE ON EXISTING FOOTINGS. CONSTRUCTION TO BE OF NON-COMBUSTIBLE CONSTRUCTION.
Q08011288-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit Issued360 PRESTIGE CONTRACTING11/20/2023
DOB NOWStructuralPermit IssuedALEXANDER CHAN11/03/2022
1 project · most recent 03/03/2023
Steel
FiledStatusContractorScope
03/03/2023Permit Issued360 PRESTIGE CONTRACTINGSteel
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/13/2023Electric vehicle service equipment requirementsXIAOJUN WANGenergy_progress
03/13/2023Structural Steel - DetailsXIAOJUN WANGspecial
03/13/2023Structural Stability – Alterations of existing buildingsXIAOJUN WANGspecial
03/13/2023Structural Cold-Formed SteelXIAOJUN WANGspecial
03/13/2023FinalCALVIN TRANprogress
02/22/2023Structural Cold-Formed SteelXIAOJUN WANGspecial
02/22/2023Structural Stability – Alterations of existing buildingsXIAOJUN WANGspecial
02/22/2023Structural Steel - DetailsXIAOJUN WANGspecial
02/22/2023FinalCALVIN TRANprogress
02/22/2023Electric vehicle service equipment requirementsXIAOJUN WANGenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q08011288-P1Request digital key ↗
08/15/2026Q08011288-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08011288-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q08011288-I1Open ↗
08/29/2026Q08011288-I1Open ↗
08/25/2026Q08011288-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026Q08011288-I1Open ↗
08/29/2026Q08011288-I1Open ↗
08/25/2026Q08011288-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026Q08011288-P1Open ↗
08/25/2026Q08011288-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026Q08011288-P1Open ↗
08/15/2026Q08011288-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026Q08011288-I1Open ↗
08/13/2026Q08011288-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/25/2026Q08011288-P1Open ↗
08/15/2026Q08011288-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08011288-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q08011288-I1Open ↗