← Back
Two stories - detached, small or mid-size
35-24 170 STREET
QUEENS · BIN 4484568
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2AZoning
2,036 sfGross Floor Area
1Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUNG HO SHIN ARCHITECT, PC301/29/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILD IT BROTHERS INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050201/29/2026
SUNG HO SHIN ARCHITECT2997201/29/2026
Building Lifecycle
All (45)Filed (3)Permit Issued (1)Violation (2)Inspection (6)Objection (6)Special Inspection (27)
05/01/2026
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
05/01/2026
Special inspection requirement — Wood – Prefabricated I-Joists
PAUL MARINO
05/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
SUNG HO SHIN
05/01/2026
Special inspection requirement — Structural Wood Frame
PAUL MARINO
05/01/2026
Special inspection requirement — Final
SUNG HO SHIN
05/01/2026
Special inspection requirement — Lighting controls
SUNG HO SHIN
05/01/2026
Special inspection requirement — Electric vehicle service equipment requirements
SUNG HO SHIN
05/01/2026
Special inspection requirement — Interior lighting power
SUNG HO SHIN
03/20/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/04/2026
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
01/29/2026
Filed — Alteration CO
Remove garage violation. New garage construction. REMOVE OF ECB VIOLATION #39117327Y
Q01086158-P2
01/20/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/20/2026
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
01/20/2026
Special inspection requirement — Wood – Prefabricated I-Joists
PAUL MARINO
01/20/2026
Special inspection requirement — Final
SUNG HO SHIN
01/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
SUNG HO SHIN
01/20/2026
Special inspection requirement — Structural Wood Frame
PAUL MARINO
01/20/2026
Special inspection requirement — Electric vehicle service equipment requirements
SUNG HO SHIN
01/20/2026
Special inspection requirement — Lighting controls
SUNG HO SHIN
01/20/2026
Special inspection requirement — Interior lighting power
SUNG HO SHIN
11/18/2025
Permit issued — General Construction
Q01086158-I1-GC-CX
09/30/2025
Filed — Alteration CO
Remove garage violation. New garage construction. REMOVE OF ECB VIOLATION #39117327Y
Q01086158-P1
09/29/2025
Special inspection requirement — Concrete - Cast-In-Place
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/29/2025
Special inspection requirement — Wood – Prefabricated I-Joists
09/29/2025
Special inspection requirement — Final
09/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
09/29/2025
Special inspection requirement — Structural Wood Frame
09/29/2025
Special inspection requirement — Electric vehicle service equipment requirements
09/29/2025
Special inspection requirement — Interior lighting power
09/29/2025
Special inspection requirement — Lighting controls
06/02/2025
Objection resolved — Addressed
10/24/2024
Objection resolved — Addressed
08/20/2024
Objection resolved — Addressed
08/18/2024
Objection raised — Energy
08/18/2024
Objection raised — Scope
08/18/2024
Objection raised — Admin
08/01/2024
Filed — Alteration CO
Remove garage violation. New garage construction. REMOVE OF ECB VIOLATION #39117327Y
Q01086158-I1
06/20/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2024
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBUILD IT BROTHERS11/18/2025
1 project · most recent 01/29/2026
Wood
FiledStatusContractorScope
01/29/2026Permit IssuedBUILD IT BROTHERS INCWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/20/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/20/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/04/2026Fail-Final PL - Up to 9 Requested FloorsFailView ↗
01/20/2026Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
05/01/2026Concrete - Cast-In-PlacePAUL MARINOspecial
05/01/2026Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
05/01/2026Wood – Prefabricated I-JoistsPAUL MARINOspecial
05/01/2026Fire-Resistance Rated ConstructionSUNG HO SHINprogress
05/01/2026Structural Wood FramePAUL MARINOprogress
05/01/2026FinalSUNG HO SHINprogress
05/01/2026Lighting controlsSUNG HO SHINenergy_progress
05/01/2026Electric vehicle service equipment requirementsSUNG HO SHINenergy_progress
05/01/2026Interior lighting powerSUNG HO SHINenergy_progress
01/20/2026Concrete - Cast-In-PlacePAUL MARINOspecial
01/20/2026Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
01/20/2026Wood – Prefabricated I-JoistsPAUL MARINOspecial
01/20/2026FinalSUNG HO SHINprogress
01/20/2026Fire-Resistance Rated ConstructionSUNG HO SHINprogress
01/20/2026Structural Wood FramePAUL MARINOprogress
01/20/2026Electric vehicle service equipment requirementsSUNG HO SHINenergy_progress
01/20/2026Lighting controlsSUNG HO SHINenergy_progress
01/20/2026Interior lighting powerSUNG HO SHINenergy_progress
09/29/2025Concrete - Cast-In-Place—special
09/29/2025Fire-Resistant Penetrations and Joints—special
09/29/2025Wood – Prefabricated I-Joists—special
09/29/2025Final—progress
09/29/2025Fire-Resistance Rated Construction—progress
09/29/2025Structural Wood Frame—progress
09/29/2025Electric vehicle service equipment requirements—energy_progress
Latest 25 of 27.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026Q01086158-P1Request digital key ↗
08/18/2026Q01086158-I1Request digital key ↗
08/18/2026Q01086158-P2Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026Q01086158-P2Open ↗
08/13/2026Q01086158-I1Open ↗
08/13/2026Q01086158-P1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q01086158-P2Open ↗
09/02/2026Q01086158-P2Open ↗
09/02/2026Q01086158-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026Q01086158-P2Open ↗
09/02/2026Q01086158-P2Open ↗
08/27/2026Q01086158-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026Q01086158-I1Open ↗
08/18/2026Q01086158-P2Open ↗
08/18/2026Q01086158-P1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q01086158-P2Open ↗
08/13/2026Q01086158-I1Open ↗
08/13/2026Q01086158-P1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/18/2026Q01086158-I1Open ↗
08/18/2026Q01086158-P2Open ↗
08/18/2026Q01086158-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01086158-I1Open ↗