2005Year Built
3Stories
C0Building Class
R5Zoning
3,141 sfGross Floor Area
3Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Three families · 2,314 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 13p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J I CONSTRUCTION103/22/2026
N S M REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEORGIOS G GEORGOPOULOS, R.A.107/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGIOS G. GEORGOPOULOS, R.A. ARCH203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGIOS G. GEORGOPOULOS,1192107/18/2023
Building Lifecycle
All (38)Filed (1)Violation (20)Objection (2)Special Inspection (15)
05/08/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, open)
I
06/13/2025
Violation issued (HPD, open)
A
12/02/2024
Violation issued (HPD, open)
I
05/28/2024
Objection resolved — Addressed
04/16/2024
Violation issued (HPD, open)
A
11/24/2023
Violation issued (HPD, closed)
I
07/31/2023
Objection raised — Scope
07/18/2023
Filed — Alteration CO
Q00809845-I1
06/27/2023
Violation issued (HPD, open)
A
06/27/2023
Violation issued (HPD, open)
A
06/27/2023
Violation issued (HPD, open)
A
06/27/2023
Violation issued (HPD, open)
A
06/27/2023
Violation issued (HPD, open)
A
03/30/2023
Violation issued (HPD, open)
A
01/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
Georgios Georgopoulos
01/11/2023
Special inspection requirement — Masonry
Georgios Georgopoulos
01/11/2023
Special inspection requirement — Interior lighting power
Georgios Georgopoulos
01/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
01/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Georgios Georgopoulos
01/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
Georgios Georgopoulos
01/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Georgios Georgopoulos
01/11/2023
Special inspection requirement — Insulation placement and R values
Georgios Georgopoulos
01/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
Georgios Georgopoulos
01/11/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Georgios Georgopoulos
01/11/2023
Special inspection requirement — Fenestration areas
Georgios Georgopoulos
01/11/2023
Special inspection requirement — Fenestration air leakage
Georgios Georgopoulos
01/11/2023
Special inspection requirement — Air barrier - visual inspection
Georgios Georgopoulos
01/09/2023
Special inspection requirement — Mechanical Systems
Georgios Georgopoulos
01/09/2023
Special inspection requirement — Final
Georgios Georgopoulos
11/15/2022
Violation issued (HPD, closed)
I
03/09/2022
Violation issued (HPD, closed)
I
03/09/2022
Violation issued (HPD, open)
A
04/19/2021
Violation issued (HPD, open)
A
11/04/2019
Violation issued (HPD, closed)
I
10/25/2018
Violation issued (HPD, closed)
I
11/25/2016
Violation issued (HPD, closed)
I
07/29/2004
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDPETER PLUMBING ASSOC. INC.03/15/2005
BIS—ISSUEDJ & I CONSTRUCTION11/24/2004
BIS—ISSUEDJ & I CONSTRUCTION05/20/2004
1 project · most recent 07/18/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/18/2023——Heating and Air Conditioning Systems
Heat / Cool
Comfort Aire A-SMH12SC 12,000 BTU · Split System ×1
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
01/11/2023HVAC-R and service water heating system controlsGeorgios Georgopoulosenergy_progress
01/11/2023MasonryGeorgios Georgopoulosspecial
01/11/2023Interior lighting powerGeorgios Georgopoulosenergy_progress
01/11/2023Fire-Resistant Penetrations and JointsGeorgios Georgopoulosspecial
01/11/2023Energy Code Compliance InspectionsGeorgios Georgopoulosprogress
01/11/2023Fire-Resistance Rated ConstructionGeorgios Georgopoulosprogress
01/11/2023HVAC-R and service water piping design and insulationGeorgios Georgopoulosenergy_progress
01/11/2023Insulation placement and R valuesGeorgios Georgopoulosenergy_progress
01/11/2023HVAC-R and service water heating equipmentGeorgios Georgopoulosenergy_progress
01/11/2023Fenestration and door U-factor and product ratingsGeorgios Georgopoulosenergy_progress
01/11/2023Fenestration areasGeorgios Georgopoulosenergy_progress
01/11/2023Fenestration air leakageGeorgios Georgopoulosenergy_progress
01/11/2023Air barrier - visual inspectionGeorgios Georgopoulosenergy_progress
01/09/2023Mechanical SystemsGeorgios Georgopoulosspecial
01/09/2023FinalGeorgios Georgopoulosprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026Q00809845-I1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q00809845-I1Open ↗
09/01/2026Q00809845-I1Open ↗
09/01/2026Q00809845-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00809845-I1Open ↗
09/01/2026Q00809845-I1Open ↗
09/01/2026Q00809845-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/24/2026Q00809845-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00809845-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026Q00809845-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/24/2026Q00809845-I1Open ↗