← Back
Two family frame
177-10 129 AVENUE
QUEENS · BIN 4533855
💬 Discuss this project
2005Year Built
2Stories
B2Building Class
R3AZoning
—Gross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 0.67 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRESTIGE EQUITIES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR108/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281108/21/2026
Building Lifecycle
All (7)Filed (1)Violation (1)Special Inspection (5)
08/21/2026
Filed — Alteration
Installation of solar panels, Roof Top, Grid Tied, railed, (9) Modules, (3.69) kW System Size
Q01449613-I1
08/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
08/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
08/21/2026
Special inspection requirement — Final
Mina Makar
08/21/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
10/20/2004
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDPRESTIGE EQUITIES INC.01/24/2007
BISEQISSUEDPRESTIGE EQUITIES INC.01/24/2007
BISPLISSUEDCK PLUMBING & MECH INC04/28/2006
BISEQISSUEDPRESTIGE EQUITIES INC.01/27/2006
BIS—ISSUEDPRESTIGE EQUITIES INC.01/27/2006
BISEQISSUEDPRESTIGE EQUITIES INC.03/11/2005
BIS—ISSUEDPRESTIGE EQUITIES INC.03/11/2005
BISEQISSUEDPRESTIGE EQUITIES INC08/06/2004
1 project · most recent 08/21/2026
FiledStatusContractorScope
08/21/2026Permit IssuedISLAND ELECTRIC CORP—
1 project · most recent 08/21/2026
FiledStatusContractorScope
08/21/2026——18 panels, 7.38 kw, 158 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/21/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
08/21/2026Fire-Resistant Penetrations and JointsMina Makarspecial
08/21/2026Energy Code Compliance InspectionsMina Makarprogress
08/21/2026FinalMina Makarprogress
08/21/2026Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01449613-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026Q01449613-I1Open ↗
09/23/2026Q01449613-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/22/2026Q01449613-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q01449613-I1Open ↗