City university
Service Building
222-05 56 AVENUE · BIN 4539247
💬 Discuss this project
1963Year Built
4Stories
W5Building Class
R4Zoning
878,386 sfGross Floor Area
0Units
LL97 Covered13 Open Violations 0 unresolved · 13 paperwork only ▸FDNY Report ↗
City university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 895,000 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
MechanicalCivilGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 6 docs
Floor 2Under Construction4p · 2 filings · 13 docs
Floor 1Under Construction2p · 1 filing · 7 docs
Sub-BasementUnder Construction2p · 1 filing · 7 docs
2 jobs · most recent 08/13/2025
Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
08/13/2025——Air Conditioning Systems
Cooling
Alliance 10FSV041101 7,500 CFM · Ahu ×1
Jetson ACCU030ABD2 325,500 BTU · Condensing Unit ×1
07/26/2023Permit IssuedARAMARK SERVICES INCOthers—
2 jobs · most recent 11/07/2022
General Wiring
FiledStatusContractorScope
11/07/2022CompleteS & V ELECTRICAL CORPGeneral Wiring
08/28/2019CompleteTRU-VAL ELECTRIC CORP.General Wiring
1 job · most recent 08/13/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/13/2025——Steel, Concrete, Masonry
Building Lifecycle
All (62)Filed (8)Permit Issued (8)Signed Off (2)Objection (16)Special Inspection (28)
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/09/2026
Filed — Alteration
Minor mechanical scope at the SERVICE building associated with the submetering project at Queensborough Community College. No change of use, egress or occupancy.
Q01372878-I1
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/16/2026
Special inspection requirement — Mechanical Systems
03/16/2026
Special inspection requirement — Final
10/23/2025
Permit issued — Mechanical Systems
Q00815303-I1-MS
09/16/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
08/20/2025
Objection raised — Scope
08/20/2025
Objection raised — Scope
08/20/2025
Objection raised — Inspections
08/13/2025
Filed — Alteration
Replacement of the existing air handling unit (AHU) systems and associated roof-mounted condensing unit in the service building. All as per plans filed herewith.
Q01257114-S2
08/07/2025
Filed — Alteration
Replacement of the existing air handling unit (AHU) systems and associated roof-mounted condensing unit in the service building. All as per plans filed herewith.
Q01257114-I1
07/17/2025
Special inspection requirement — Post-installed Anchors
07/17/2025
Special inspection requirement — Heating Systems
07/17/2025
Special inspection requirement — High Temperature Hot Water Piping (Welding)
07/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/17/2025
Special inspection requirement — Energy Code Compliance Inspections
07/16/2025
Special inspection requirement — Final
07/16/2025
Special inspection requirement — Mechanical Systems
10/16/2024
Permit issued — Mechanical Systems
Q00815303-I1-MS
07/26/2023
Filed — Alteration
Mechanical upgrades as related to updated Building Automation System as per plans. No change in use, egress, or occupancy.
Q00815303-I1
07/26/2023
Signed off — Alteration
Proposing removal and installation of two 1000 gal. UST, piping. 2 dispensers & enclosures, assoc. equipment's dispensers, control panels. concrete tank mat, curbing & walk. Install canopy with footing over dispensing island, and paving. All as per plans
Q00629201-I1
06/21/2023
Signed off — Alteration
Installation of temporary construction fence to protect pedestrian during excavation & construction work in conjunction with associated application Q00629201.
Q00640251-I1
04/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Marchese
04/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
04/26/2023
Special inspection requirement — Subgrade Inspections
Stephen Marchese
04/26/2023
Special inspection requirement — Structural Steel - Details
Stephen Marchese
04/26/2023
Special inspection requirement — Footing and Foundation
Stephen Marchese
04/26/2023
Special inspection requirement — Concrete - Cast-In-Place
Stephen Marchese
04/26/2023
Special inspection requirement — Mechanical Systems
Stephen Marchese
04/26/2023
Special inspection requirement — Final
JOHN CATAPANO
04/14/2023
Filed — Alteration
Proposing removal and installation of two 1000 gal. UST, piping. 2 dispensers & enclosures, assoc. equipment's dispensers, control panels. concrete tank mat, curbing & walk. Install canopy with footing over dispensing island, and paving. All as per plans
Q00629201-P2
01/19/2023
Special inspection requirement — Mechanical Systems
MARISA HARTE
01/19/2023
Special inspection requirement — Final
Stephen Marchese
12/20/2022
Permit issued — Mechanical Systems
Q00629201-I1-GC-CX
12/20/2022
Permit issued — Construction Fence
Q00640251-I1-FN
10/28/2022
Permit issued — Construction Fence
Q00640251-I1-FN
10/28/2022
Permit issued — Earth Work
Q00629201-I1-GC-CX
10/17/2022
Permit issued — General Construction
Q00629201-I1-GC-CX
07/15/2022
Permit issued — Construction Fence
Q00640251-I1-FN
07/14/2022
Filed — Alteration
Proposing removal and installation of two 1000 gal. UST, piping. 2 dispensers & enclosures, assoc. equipment's dispensers, control panels. concrete tank mat, curbing & walk. Install canopy with footing over dispensing island, and paving. All as per plans
Q00629201-P1
06/30/2022
Special inspection requirement — Concrete - Cast-In-Place
Stephen Marchese
06/30/2022
Special inspection requirement — Structural Steel - Details
Stephen Marchese
06/30/2022
Special inspection requirement — Subgrade Inspections
Stephen Marchese
06/30/2022
Special inspection requirement — Final
JOHN CATAPANO
06/30/2022
Special inspection requirement — Footing and Foundation
Stephen Marchese
06/30/2022
Special inspection requirement — Mechanical Systems
Stephen Marchese
03/09/2022
Filed — Alteration
Installation of temporary construction fence to protect pedestrian during excavation & construction work in conjunction with associated application Q00629201.
Q00640251-I1
03/09/2022
Objection raised — Scope
03/09/2022
Objection resolved — Addressed
03/09/2022
Objection raised — Scope
03/09/2022
Objection resolved — Addressed
03/09/2022
Objection raised — Inspections
Latest 60 of 62 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY1807/08/2026
NYS DORMITORY AUTHORITY703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAMBOLL104/09/2026
MFS CONSULTING ENGINEERS & SURVEYOR108/13/2025
THE LIRO GROUP108/07/2025
EME CONSULTING ENGINEERING GROUP107/26/2023
CATAPANO ENGINEERING PC404/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES203/21/2026
Enviornmental & Energy Solutions403/21/2026
JMV ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND PUMP AND TANK, LLCGeneral Contractor907/08/2026
ARAMARK SERVICES INCGeneral Contractor207/08/2026
TOTARO, CHRISTOPHERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O589407/26/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedARAMARK SERVICES10/23/2025
DOB NOWMechanical SystemsPermit IssuedARAMARK SERVICES10/16/2024
DOB NOWMechanical SystemsSigned-offISLAND PUMP AND TANK, LLC12/20/2022
DOB NOWConstruction FenceSigned-offISLAND PUMP AND TANK, LLC12/20/2022
DOB NOWConstruction FenceSigned-offISLAND PUMP AND TANK, LLC10/28/2022
DOB NOWEarth WorkSigned-offISLAND PUMP AND TANK, LLC10/28/2022
DOB NOWGeneral ConstructionSigned-offISLAND PUMP AND TANK, LLC10/17/2022
DOB NOWConstruction FenceSigned-offISLAND PUMP AND TANK, LLC07/15/2022
BISPLISSUEDDYNAMIC CONTRACTING CORP09/21/2018
BISOTISSUEDDYNAMIC US, INC09/21/2018
BISMHISSUEDDYNAMIC US, INC09/21/2018
BISFSISSUEDDOUGLAS SIMMONS05/04/2018
BISFSISSUEDDOUGLAS SIMMONS11/21/2017
BISOTISSUEDDYNAMIC US, INC09/18/2017
BISMHISSUEDDYNAMIC US, INC09/18/2017
BISPLISSUEDDYNAMIC CONTRACTING CORP03/16/2017
BISMHISSUEDDYNAMIC US, INC09/14/2016
BISOTISSUEDDYNAMIC US, INC09/14/2016
BISFSISSUEDDYNAMIC MECHANICAL CONTR09/13/2016
BISFSISSUEDDYNAMIC MECHANICAL CONTR04/28/2016
BISPLISSUEDDYNAMIC CONTRACTING CORP03/07/2016
BISMHISSUEDDYNAMIC US, INC03/07/2016
BISOTISSUEDDYNAMIC US, INC03/07/2016
BISFSISSUEDWARD MECHANICAL CORP04/25/1995
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
03/25/2026Fire-Resistant Penetrations and Joints—special
03/25/2026Energy Code Compliance Inspections—progress
03/23/2026HVAC-R and service water piping design and insulation—energy_progress
03/16/2026Mechanical Systems—special
03/16/2026Final—progress
07/17/2025Post-installed Anchors—special
07/17/2025Heating Systems—special
07/17/2025High Temperature Hot Water Piping (Welding)—special
07/17/2025Fire-Resistant Penetrations and Joints—special
07/17/2025Energy Code Compliance Inspections—progress
07/16/2025Final—progress
07/16/2025Mechanical Systems—special
04/27/2023HVAC-R and service water heating system controlsStephen Marcheseenergy_progress
04/27/2023Fire-Resistant Penetrations and JointsMARISA HARTEspecial
04/26/2023Subgrade InspectionsStephen Marchesespecial
04/26/2023Structural Steel - DetailsStephen Marchesespecial
04/26/2023Footing and FoundationStephen Marcheseprogress
04/26/2023Concrete - Cast-In-PlaceStephen Marchesespecial
04/26/2023Mechanical SystemsStephen Marchesespecial
04/26/2023FinalJOHN CATAPANOprogress
01/19/2023Mechanical SystemsMARISA HARTEspecial
01/19/2023FinalStephen Marcheseprogress
06/30/2022Concrete - Cast-In-PlaceStephen Marchesespecial
06/30/2022Structural Steel - DetailsStephen Marchesespecial
06/30/2022Subgrade InspectionsStephen Marchesespecial
Latest 25 of 28.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026Q00640251-I1Request digital key ↗
08/26/2026Q00629201-P2Request digital key ↗
08/26/2026Q00629201-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
06/07/2024421521981Open ↗
11/27/2019421030431Open ↗
11/27/2019421030431Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
12/05/2017421030431Open ↗
05/02/2016421030431Open ↗
03/09/2016421030431Open ↗
Showing 3 of 5 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
11/06/2019421030431Open ↗
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
03/14/2020421030431Open ↗
06/20/2019421030431Open ↗
06/20/2019421030431Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026Q00640251-I1Open ↗
08/26/2026Q00629201-I1Open ↗
08/26/2026Q00629201-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026Q00629201-P2Open ↗
08/31/2026Q00629201-P2Open ↗
08/30/2026Q00815303-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q00629201-P2Open ↗
08/30/2026Q00815303-I1Open ↗
08/29/2026Q00629201-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
07/03/2017421521981Open ↗
10/10/2014421030431Open ↗
10/10/2014421030431Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026Q01372878-I1Open ↗
08/13/2026Q00815303-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/03/2017421521981Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/19/2020421030431Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/20/2019421030431Open ↗
11/21/2018421030431Open ↗
07/03/2017421521981Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
03/19/2020421030431Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/09/2016421030431Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/19/2020421030431Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/20/2020421030431Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/17/2026Q01372878-I1Open ↗
08/13/2026Q00629201-P1Open ↗
08/13/2026Q00629201-I1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/11/2020421030431Open ↗
03/20/2020421030431Open ↗
03/19/2020421030431Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/11/2020421030431Open ↗
12/05/2017421030431Open ↗
05/02/2016421030431Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/10/2014421030431Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/19/2020421030431Open ↗
07/03/2017421521981Open ↗
10/10/2014421030431Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
07/03/2017421521981Open ↗
10/10/2014421030431Open ↗
10/10/2014421030431Open ↗
▸BISBOROUGH INTAKE FORM2
11/27/2019421030431Open ↗
10/19/2018421030431Open ↗
▸BISADDITIONAL INFORMATION2
03/14/2020421030431Open ↗
11/21/2018421030431Open ↗