← Back
Miscellaneous utility property
106 BEACH CHANNEL
QUEENS · BIN 4539810
💬 Discuss this project
0Year Built
—Stories
U9Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Miscellaneous utility property · Owner of record: NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION · 222,521 sf lot · 0 FAR built
Locations of Work
ElectricalGeneral
Floor 52p · 3 filings · 9 docs
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 3 docs
Basement8p · 3 filings · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAZEN AND SAWYER602/11/2025
B4 ARCHITECTURE LLC108/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HAZEN & SAWYER, P.C.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RUSSO DEVELOPMENT ENTERPGeneral Contractor107/08/2026
Building Lifecycle
All (26)Filed (7)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (16)
07/25/2025
Signed off — Alteration
PROPOSED: dismantling and removal of abandoned empty steel gas tank. No change of use, egress or occupancy.
Q01033428-I1
02/11/2025
Filed — Alteration
DEP ROCKAWAY WRRF, NYC WASTEWATER RESILIENCY PROGRAM ASSIGNMENT RLCY-RO-02-J18G-F-03. CHLORINATION BUILDING, HEATING PLANT, TUNNEL A, REMOVE & REPLACE LIGHTING, REMOVE & REPLACE EXISTING CONDUIT & WIRE AS PER PLANS SUBMITTED.
Q01178316-I1
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/07/2025
Special inspection requirement — Final
02/07/2025
Special inspection requirement — Post-installed Anchors
11/27/2024
Filed — Alteration
DEP ROCKAWAY WRRF, EAST CENTRAL PIPE GALLERY, AERATION TAKES SIDE & END PIPE GALLERY, PRIMARY SCUM BUILDING PIPE GALLERY, NYC WASTEWATER RESILIENCY PROGRAM ASSIGNMENT RLCY-RO-02-J18G-F05. REMOVE & REPLACE EXIST CONDUIT & WIRE AS PER PLANS SUBMITTED.
Q01140211-I1
11/27/2024
Filed — Alteration
Q01140285-I1
11/11/2024
Special inspection requirement — Final
11/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/11/2024
Special inspection requirement — Post-installed Anchors
11/11/2024
Special inspection requirement — Final
11/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/11/2024
Special inspection requirement — Post-installed Anchors
10/24/2024
Filed — Alteration
DEP ROCKAWAY WRRF, EAST CENTRAL PIPE GALLERY, AERATION TAKES SIDE & END PIPE GALLERY, PRIMARY SCUM BUILDING PIPE GALLERY, NYC WASTEWATER RESILIENCY PROGRAM ASSIGNMENT RLCY-RO-02-J18G-F06. REMOVE & REPLACE EXIST CONDUIT & WIRE AS PER PLANS SUBMITTED.
Q01111314-I1
10/24/2024
Filed — Alteration
Q01114967-I1
09/13/2024
Special inspection requirement — Post-installed Anchors
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/13/2024
Special inspection requirement — Final
08/20/2024
Permit issued — General Construction
Q01033428-I1-GC
08/12/2024
Filed — Alteration
PROPOSED: dismantling and removal of abandoned empty steel gas tank. No change of use, egress or occupancy.
Q01033428-I1
04/10/2024
Special inspection requirement — Final
LAZAR KESIC
03/19/2024
Filed — Alteration
Q00905244-I1
02/09/2024
Violation issued (FDNY_NOV, closed)
07/18/2023
Special inspection requirement — Post-installed Anchors
07/17/2023
Special inspection requirement — Mechanical Systems
07/17/2023
Special inspection requirement — Final
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRUSSO DEVELOPMENT ENTERP08/20/2024
BISMHISSUEDWDF INC06/03/2020
BISMHISSUEDWDF INC07/18/2019
BISMHISSUEDWDF INC12/11/2018
BISMHISSUEDWDF INC12/20/2017
BISEQISSUEDTRI BOROUGH SCAFFOLDING11/05/2014
BISBLISSUEDAPPROVED OIL CO OF BKLYN01/25/2013
2 projects · most recent 08/23/2019
General Wiring
FiledStatusContractorScope
08/23/2019CompleteA TECH ELEC ENTERPRISESGeneral Wiring
04/19/2018CompleteMARAJ ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
02/07/2025Fire-Resistant Penetrations and Joints—special
02/07/2025Final—progress
02/07/2025Post-installed Anchors—special
11/11/2024Final—progress
11/11/2024Fire-Resistant Penetrations and Joints—special
11/11/2024Post-installed Anchors—special
11/11/2024Final—progress
11/11/2024Fire-Resistant Penetrations and Joints—special
11/11/2024Post-installed Anchors—special
09/13/2024Post-installed Anchors—special
09/13/2024Fire-Resistant Penetrations and Joints—special
09/13/2024Final—progress
04/10/2024FinalLAZAR KESICprogress
07/18/2023Post-installed Anchors—special
07/17/2023Mechanical Systems—special
07/17/2023Final—progress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026Q00905244-I1Request digital key ↗
08/21/2026Q01033428-I1Request digital key ↗
08/21/2026Q01111314-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
12/17/2018440455071Open ↗
12/20/2017440455071Open ↗
11/03/2014440181919Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
01/16/2013420803072Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026Q01114967-I1Open ↗
08/20/2026Q01178316-I1Open ↗
08/13/2026Q01140211-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/26/2015440181919Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01033428-I1Open ↗
▸Trade Schedules & Equipment2
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
01/29/2013420803072Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/16/2013420803072Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/16/2013420803072Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/13/2017440455071Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/13/2017440455071Open ↗
▸BISNYCECC ANALYSIS1
12/13/2017440455071Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/13/2017440455071Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/21/2026Q01114967-I1Open ↗
08/13/2026Q01178316-I1Open ↗
08/13/2026Q01140285-I1Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/26/2015440181919Open ↗
01/29/2013420803072Open ↗
▸BISSUPERSEDING LETTER1
12/17/2018440455071Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/26/2015440181919Open ↗
▸Cost, Insurance & Ownership2
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
12/20/2017440455071Open ↗
▸BISCOST AFFIDAVIT1
12/13/2017440455071Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
▸Other Documents1
▸BISEMERGENCY WORK NOTIFICATION1
01/24/2013420803072Open ↗