← Back
Fire Department
423 ABBOTT ROAD
QUEENS · BIN 4539895
💬 Discuss this project
0Year Built
—Stories
Y1Building Class
R3-1Zoning
421,996 sfGross Floor Area
0Units
LL97 Covered7 Open Violations 1 unresolved · 6 paperwork only ▸FDNY Report ↗
Fire Department · Owner of record: FIRE DEPARTMENT OF NEW YORK · 5,926,250 sf lot · 0.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 2 filings · 6 docs
Floor 31p · 1 filing · 3 docs
Floor 21p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
Cellar8p · 4 filings · 12 docs
1 job · most recent 04/25/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/25/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXSQ48TBVJUA 48,000 BTU · Vrf Outdoor ×2
RXTQ48TBVJUA 48,000 BTU · Vrf Outdoor ×1
RXYQ312AATJA 313,000 BTU · Vrf Outdoor ×1
Ventilation
Pennbarry ZJ1-SC 940 CFM · Exhaust Fan ×2
1 job · most recent 04/16/2025
FiledStatusContractorScope
04/16/2025——114 heads
1 job · most recent 04/16/2025
Water/Sanitary
FiledStatusContractorScope
04/16/2025——Water/Sanitary
1 job · most recent 07/17/2025
Steel Concrete
FiledStatusContractorScope
07/17/2025——Steel, Concrete
Building Lifecycle
All (58)Filed (7)Objection (31)Special Inspection (20)
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/28/2026
Objection raised — Other
05/28/2026
Objection raised — Other
05/27/2026
Filed — Alteration
Q01349394-S1
05/27/2026
Filed — Alteration
Q01349394-I1
12/29/2025
Objection raised — Admin
12/29/2025
Objection raised — Other
12/29/2025
Objection raised — Other
12/29/2025
Objection raised — Zoning
12/29/2025
Objection raised — Structural
12/29/2025
Objection raised — Scope
12/29/2025
Objection raised — Admin
12/02/2025
Filed — Alteration CO
Alt/CO
Q01196071-I1
08/06/2025
Objection raised — Structural
08/06/2025
Objection raised — Structural
08/06/2025
Objection raised — Structural
08/06/2025
Objection raised — Structural
08/06/2025
Objection raised — Admin
07/17/2025
Filed — Alteration
Structural Work
Q01196185-I1
05/08/2025
Objection raised — Admin
05/07/2025
Objection raised — Admin
05/05/2025
Objection raised — Plumbing
05/05/2025
Objection raised — Fire_Protection
05/05/2025
Objection raised — Plumbing
05/05/2025
Objection raised — Fire_Protection
05/05/2025
Objection raised — Fire_Protection
05/05/2025
Objection raised — Fire_Protection
05/05/2025
Objection raised — Fire_Protection
05/05/2025
Objection raised — Plumbing
05/05/2025
Objection raised — Plumbing
05/05/2025
Objection raised — Fire_Protection
05/05/2025
Objection raised — Fire_Protection
05/05/2025
Objection raised — Fire_Protection
05/05/2025
Objection raised — Admin
04/25/2025
Filed — Alteration
Installation of new HVAC system. No change of use, egress or occupancy under this application.
Q01196090-I1
04/16/2025
Filed — Alteration
New Sprinkler System for two story building with sprinkler protected attic and cellar. No standpipe system work for this building. No change of use, egress or occupancy under this application
Q01196150-I1
04/16/2025
Filed — Alteration
NEW PLUMBING SYSTEM COMPLETE WITH DOMESTIC WATER AND SANITARY/VENT SYSTEMS FOR PLUMBING FIXTURESWITHIN 2 STORY BUILDING WITH CELLAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Q01196130-I1
04/11/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/17/2025
Special inspection requirement — Demolition
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/17/2025
Special inspection requirement — Masonry
03/17/2025
Special inspection requirement — Post-installed Anchors
03/17/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
03/17/2025
Special inspection requirement — Concrete - Cast-In-Place
03/17/2025
Special inspection requirement — Masonry
03/17/2025
Special inspection requirement — Post-installed Anchors
03/17/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
03/17/2025
Special inspection requirement — Structural Cold-Formed Steel
03/17/2025
Special inspection requirement — Structural Steel - Details
03/17/2025
Special inspection requirement — Final
03/17/2025
Special inspection requirement — Footing and Foundation
03/17/2025
Special inspection requirement — Lowest Floor Elevation
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/17/2025
Special inspection requirement — Post-installed Anchors
03/17/2025
Special inspection requirement — Sprinkler Systems
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FDNY608/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&B WORLD CONSULTING205/27/2026
ALEXANDER BADALAMENTI112/02/2025
IMEG Consulting Corp.107/17/2025
IMEG304/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC1003/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/11/2025Subsurface Investigations (Borings/Test Pits)—special
04/11/2025Structural Stability – Alterations of existing buildings—special
03/17/2025Demolition—special
03/17/2025Fire-Resistant Penetrations and Joints—special
03/17/2025Masonry—special
03/17/2025Post-installed Anchors—special
03/17/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/17/2025Concrete - Cast-In-Place—special
03/17/2025Masonry—special
03/17/2025Post-installed Anchors—special
03/17/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/17/2025Structural Cold-Formed Steel—special
03/17/2025Structural Steel - Details—special
03/17/2025Final—progress
03/17/2025Footing and Foundation—progress
03/17/2025Lowest Floor Elevation—progress
03/17/2025Fire-Resistant Penetrations and Joints—special
03/17/2025Fire-Resistant Penetrations and Joints—special
03/17/2025Post-installed Anchors—special
03/17/2025Sprinkler Systems—special
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026Q01196130-I1Request digital key ↗
08/20/2026Q01196150-I1Request digital key ↗
08/20/2026Q01196090-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/16/2026Q01349394-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/18/2026Q01196071-I1Open ↗
08/16/2026Q01349394-S1Open ↗
08/16/2026Q01349394-I1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026Q01196185-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/16/2026Q01349394-I1Open ↗
08/14/2026Q01349394-S1Open ↗
08/13/2026Q01196185-I1Open ↗
Showing 3 of 7 on file for this type