DOB09/24/2025REMEDY: DEMOLISH, GRADE AND FENCE SITE
ECB09/19/2025FAILURE TO MAINTAIN. OBSERVED STRUCTURE REAR WALL(EXP #3) IN STATE OF DISREPAIR, HAVE DISPLACED/SMI FILED CMU BLOCKED, MISSING MORTAR JOINTS. VACATE ENTIRE STRUCTURE. REMEDY: REPAIR, COMPLY TO CODE.$12K due
DOB09/16/2025AT TIME OF INSPECTION OBSERVED REAR WALL OF THE GARAGE IN STATE OF DISREPAIR, SHIFTED CMU BLOCKS, AND MISSING MORTAR, . ENGINEER REPORT REQUESTED
ECB09/16/2025AT TIME OF INSPECTION OBSERVED REAR CMU WALL IN STATE OF DISREPAIR WITH CRACKS AND BULGES AT MULTIPLE LOCATIONS AND IN DANGER OF POTENTIAL FURTHER COLLAPSE AT EXP.3 (REAR OF BUILDING)., REPAIR AND/REPLACE$2K due
HPD10/23/2008SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING IN THE 1st BEDROOM 2 FROM NORTH LOCATED AT APT 2, 2nd STORY
HPD10/23/2008SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY
HPD10/23/2008SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING IN THE 2nd BEDROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY