← Back
Two stories - detached, small or mid-size
184-42 TUDOR ROAD
QUEENS · BIN 4565773
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R1-2Zoning
1,716 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 8,976 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG ENGINEERING PLLC106/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCX DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BNL CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG ENGINEERING PLLC8512106/05/2023
Building Lifecycle
All (14)Filed (1)Permit Issued (1)Signed Off (1)Violation (4)Inspection (1)Objection (2)Special Inspection (4)
01/19/2024
Violation issued (ECB, closed)
Construction
08/08/2023
Signed off — Alteration
Q00878963-I1
08/07/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/01/2023
Permit issued — General Construction
Q00878963-I1-GC-CX
07/07/2023
Objection resolved — Addressed
06/09/2023
Objection raised — Scope
06/05/2023
Filed — Alteration
Q00878963-I1
05/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAO ZHENG
05/22/2023
Special inspection requirement — Masonry
XIAO ZHENG
05/22/2023
Special inspection requirement — Structural Wood Frame
XIAO ZHENG
05/22/2023
Special inspection requirement — Final
XIAO ZHENG
01/10/2023
Violation issued (ECB, closed)
Construction
10/14/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/23/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBNL CONSTRUCTION08/01/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/07/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/22/2023Structural Stability – Alterations of existing buildingsXIAO ZHENGspecial
05/22/2023MasonryXIAO ZHENGspecial
05/22/2023Structural Wood FrameXIAO ZHENGprogress
05/22/2023FinalXIAO ZHENGprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026Q00878963-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q00878963-I1Open ↗
08/27/2026Q00878963-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00878963-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026Q00878963-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00878963-I1Open ↗