← Back
One family attached or semi-detached
92-16 93 AVENUE
QUEENS · BIN 4580983
💬 Discuss this project
1925Year Built
2Stories
A5Building Class
R3-1Zoning
1,080 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,800 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/09/2018$568K—Private party → Private party$526/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG ENGINEERING PLLC207/28/2023
AK CONSULTING SERVICES, INC110/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCX DESIGN403/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTRUCTION &General Contractor303/21/2026
AIRITAN MANAGEMENT CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG ENGINEERING PLLC8512207/28/2023
Building Lifecycle
All (19)Filed (3)Permit Issued (2)Signed Off (1)Violation (2)Inspection (3)Special Inspection (8)
10/12/2023
Signed off — Alteration
TO RESTORE THE EXISTING SINGLE-CAR DETACHED GARAGE, INCLUDING REPAIRS TO THE WALL AND ROOF FRAMING. DAMAGES WERE CAUSED BY A VEHICULAR IMPACT. NO CHANGE IN USE, OCCUPANCY AND EGRESS. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00861426-I1
08/24/2023
Special inspection requirement — Final
XIAO ZHENG
08/24/2023
Special inspection requirement — Masonry
XIAO ZHENG
08/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAO ZHENG
08/24/2023
Special inspection requirement — Structural Wood Frame
XIAO ZHENG
07/28/2023
Filed — Alteration
TO RESTORE THE EXISTING SINGLE-CAR DETACHED GARAGE, INCLUDING REPAIRS TO THE WALL AND ROOF FRAMING. DAMAGES WERE CAUSED BY A VEHICULAR IMPACT. NO CHANGE IN USE, OCCUPANCY AND EGRESS. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00861426-P1
07/26/2023
Special inspection requirement — Masonry
XIAO ZHENG
07/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAO ZHENG
07/26/2023
Special inspection requirement — Final
XIAO ZHENG
07/26/2023
Special inspection requirement — Structural Wood Frame
XIAO ZHENG
07/14/2023
Permit issued — Structural
Q00861426-I1-GC-CX
05/26/2023
Filed — Alteration
TO RESTORE THE EXISTING SINGLE-CAR DETACHED GARAGE, INCLUDING REPAIRS TO THE WALL AND ROOF FRAMING. DAMAGES WERE CAUSED BY A VEHICULAR IMPACT. NO CHANGE IN USE, OCCUPANCY AND EGRESS. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00861426-I1
12/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/27/2022
Permit issued — Construction Fence
Q08028573-I1-FN
10/26/2022
Filed — Alteration
Q08028573-I1
10/24/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offAIRITAN MANAGEMENT CORP07/14/2023
DOB NOWConstruction FencePermit IssuedINNOVATIVE CONSTRUCTION &10/27/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/24/2023FinalXIAO ZHENGprogress
08/24/2023MasonryXIAO ZHENGspecial
08/24/2023Structural Stability – Alterations of existing buildingsXIAO ZHENGspecial
08/24/2023Structural Wood FrameXIAO ZHENGprogress
07/26/2023MasonryXIAO ZHENGspecial
07/26/2023Structural Stability – Alterations of existing buildingsXIAO ZHENGspecial
07/26/2023FinalXIAO ZHENGprogress
07/26/2023Structural Wood FrameXIAO ZHENGprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q08028573-I1Request digital key ↗
08/24/2026Q00861426-I1Request digital key ↗
08/24/2026Q00861426-P1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026Q08028573-I1Open ↗
08/24/2026Q00861426-I1Open ↗
08/24/2026Q00861426-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q00861426-I1Open ↗
08/24/2026Q00861426-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00861426-I1Open ↗
08/24/2026Q00861426-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026Q00861426-P1Open ↗
08/24/2026Q00861426-I1Open ↗