← Back
Telephone utility
94-05 QUEENS BOULEVARD
QUEENS · BIN 4591646
💬 Discuss this project
0Year Built
—Stories
U4Building Class
R7-1Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Telephone utility · Owner of record: REIGN CO1 PROPCO, LLC · 113,959 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 5 docs
5 jobs · most recent 08/11/2026
General Wiring Lighting
FiledStatusContractorScope
08/11/2026Permit IssuedCORPORATE ELEC. GROUP INC—
07/06/2026Permit IssuedTOP SHELF ELECTRIC CORP—
09/30/2024CompleteHATZEL AND BUEHLER, INCGeneral Wiring
08/11/2022CompleteFOREST ELECTRIC CORP.General Wiring
06/19/2018CompleteHATZEL AND BUEHLER, INCGeneral Wiring, Lighting
1 job · most recent 08/04/2026
Sidewalk Shed
FiledStatusContractorScope
08/04/2026Permit IssuedSPRING SCAFFOLDING LLCSidewalk Shed
1 job · most recent 01/05/2026
Suspended Scaffold
FiledStatusContractorScope
01/05/2026Permit IssuedH & H RESTORATION CORPSuspended Scaffold
1 job · most recent 01/05/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/05/2026Permit IssuedH & H RESTORATION CORPSuspended Scaffold (SC)
Building Lifecycle
All (32)Filed (6)Permit Issued (4)Signed Off (1)Violation (1)Special Inspection (20)
08/04/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01437937-I1
08/04/2026
Permit issued — Sidewalk Shed
Q01437937-I1-SH
03/26/2026
Permit issued — General Construction
Q01366694-I1-GC
03/13/2026
Filed — Alteration
Removal and replacement of cracked/displaced masonry and deteriorated sealant, crack repairs at existing granite panels, and repointing of existing brick masonry joints as per plans filed
Q01366694-I1
03/03/2026
Special inspection requirement — Post-installed Anchors
ANTHONY MUSUMECI
03/03/2026
Special inspection requirement — Final
JAMIE MERRITT
01/07/2026
Permit issued — Suspended Scaffold
Q01342251-I1-SC
01/05/2026
Filed — Alteration
Installation of suspended scaffold for facade inspection/ repair.
Q01342251-I1
01/05/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
01/05/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
01/04/2025
Violation issued (ECB, closed)
Construction
08/09/2023
Signed off — Alteration
Replacement of one (1) Bloom Energy Fuel Cell Energy Server to perform system upgrade. Existing concrete pad shall be modified to accommodate the installation of the new ES-5 system.
Q08011567-I1
07/26/2023
Filed — Alteration
Replacement of one (1) Bloom Energy Fuel Cell Energy Server to perform system upgrade. Existing concrete pad shall be modified to accommodate the installation of the new ES-5 system.
Q08011567-P2
07/26/2023
Special inspection requirement — Final
SASHA SCARLAT
07/26/2023
Special inspection requirement — Concrete - Cast-In-Place
asghar Ghodsi
07/26/2023
Special inspection requirement — Subgrade Inspections
asghar Ghodsi
07/26/2023
Special inspection requirement — Post-installed Anchors
asghar Ghodsi
07/26/2023
Special inspection requirement — Footing and Foundation
asghar Ghodsi
07/21/2023
Special inspection requirement — Footing and Foundation
asghar Ghodsi
07/21/2023
Special inspection requirement — Concrete - Cast-In-Place
asghar Ghodsi
07/21/2023
Special inspection requirement — Post-installed Anchors
asghar Ghodsi
07/21/2023
Special inspection requirement — Subgrade Inspections
asghar Ghodsi
07/21/2023
Special inspection requirement — Final
SASHA SCARLAT
11/14/2022
Permit issued — Foundation
Q08011567-I1-FO
11/02/2022
Filed — Alteration
Replacement of one (1) Bloom Energy Fuel Cell Energy Server to perform system upgrade. Existing concrete pad shall be modified to accommodate the installation of the new ES-5 system.
Q08011567-P1
11/02/2022
Special inspection requirement — Concrete - Cast-In-Place
11/02/2022
Special inspection requirement — Final
11/02/2022
Special inspection requirement — Subgrade Inspections
11/02/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
11/02/2022
Special inspection requirement — Footing and Foundation
11/02/2022
Special inspection requirement — Post-installed Anchors
09/29/2022
Filed — Alteration
Replacement of one (1) Bloom Energy Fuel Cell Energy Server to perform system upgrade. Existing concrete pad shall be modified to accommodate the installation of the new ES-5 system.
Q08011567-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REIGN CO1 PROPCO LLC C/O103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/28/2021$59.3M—AT&T COMMUNICATIONS OF NEW YORK, INC. → REIGN CO1 PROPCO, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WELLWORTH CONSULTING LLC108/04/2026
TITAN ENGINEERS P.C103/13/2026
BLOOM ENERGY CORPORATION307/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BLOOM ENERGY603/21/2026
A1 EXPEDITING SERVICE CORP.203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLOOM ENERGY CORPORATIONGeneral Contractor303/21/2026
HATZEL AND BUEHLER, INCElectrical103/22/2026
AHEARN-HOLTZMAN, INCGeneral Contractor104/09/2026
SPRING SCAFFOLDING LLCGeneral Contractor108/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETI CONSULTANTS LLC7694103/13/2026
KZ ENGINEERING, P.C.4665101/05/2026
AUTOGRAPHIC CO1579207/26/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC08/04/2026
DOB NOWGeneral ConstructionPermit IssuedAHEARN-HOLTZMAN, INC03/26/2026
DOB NOWSuspended ScaffoldPermit IssuedH & H RESTORATION CORP01/07/2026
DOB NOWFoundationSigned-offBLOOM ENERGY CORPORATION11/14/2022
BISMHISSUEDAHEARN-HOLTZMAN, INC09/02/2020
BISOTISSUEDAHEARN-HOLTZMAN, INC09/02/2020
BISOTISSUEDAHEARN-HOLTZMAN, INC06/06/2018
BISMHISSUEDAHEARN-HOLTZMAN, INC06/06/2018
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/03/2026Post-installed AnchorsANTHONY MUSUMECIspecial
03/03/2026FinalJAMIE MERRITTprogress
01/05/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
01/05/2026Post-installed AnchorsKarol Zdancewiczspecial
07/26/2023FinalSASHA SCARLATprogress
07/26/2023Concrete - Cast-In-Placeasghar Ghodsispecial
07/26/2023Subgrade Inspectionsasghar Ghodsispecial
07/26/2023Post-installed Anchorsasghar Ghodsispecial
07/26/2023Footing and Foundationasghar Ghodsiprogress
07/21/2023Footing and Foundationasghar Ghodsiprogress
07/21/2023Concrete - Cast-In-Placeasghar Ghodsispecial
07/21/2023Post-installed Anchorsasghar Ghodsispecial
07/21/2023Subgrade Inspectionsasghar Ghodsispecial
07/21/2023FinalSASHA SCARLATprogress
11/02/2022Concrete - Cast-In-Place—special
11/02/2022Final—progress
11/02/2022Subgrade Inspections—special
11/02/2022Subsurface Conditions – Fill Placement & In-Place Density—special
11/02/2022Footing and Foundation—progress
11/02/2022Post-installed Anchors—special
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q08011567-P1Request digital key ↗
08/25/2026Q08011567-I1Request digital key ↗
08/25/2026Q08011567-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
10/30/2020421598916Open ↗
10/30/2020421598916Open ↗
06/13/2018421598916Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
02/12/2018421598916Open ↗
02/12/2018421598916Open ↗
▸Seals & Professional Certifications27
▸DOB NOWSpecial Inspector Seal & Signature9
08/28/2026Q08011567-I1Open ↗
08/28/2026Q08011567-I1Open ↗
08/28/2026Q08011567-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/13/2018421598916Open ↗
05/17/2018421598916Open ↗
05/17/2018421598916Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026Q08011567-I1Open ↗
08/28/2026Q08011567-I1Open ↗
08/28/2026Q08011567-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q08011567-I1Open ↗
08/25/2026Q08011567-P1Open ↗
08/17/2026Q01366694-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/12/2018421598916Open ↗
02/12/2018421598916Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01366694-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/12/2018421598916Open ↗
02/12/2018421598916Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSUPERSEDING LETTER1
10/30/2020421598916Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/12/2018421598916Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
02/12/2018421598916Open ↗
02/12/2018421598916Open ↗
▸BISADDITIONAL INFORMATION1
05/17/2018421598916Open ↗
▸BISBOROUGH INTAKE FORM1
10/30/2020421598916Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01342251-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q01342251-I1Open ↗