← Back
Walk-up cooperative
Glen Oaks Village
76-03 COMMONWEALTH BLVD · BIN 4596085
💬 Discuss this project
1947Year Built
2Stories
C6Building Class
R3-2Zoning
133,656 sfGross Floor Area
168Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up cooperative · Owner of record: GLEN OAKS VILLAGE OWNERS INC · 278,100 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
Structural
Floor 21p · 1 filing · 4 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAS PE CONSULTING ENGINEERS506/03/2024
ANAND J. SOLANKI, P.E.110/04/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOP NOTCH CONSTRUCTION CGeneral Contractor203/21/2026
ZONE PLUMBING & HEATING CPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABDUS SALAM C. ENGINEERS484506/03/2024
ANAND J. SOLANKI, P.E.3662110/04/2021
Building Lifecycle
All (23)Filed (6)Permit Issued (4)Signed Off (2)Inspection (5)Objection (2)Special Inspection (4)
06/26/2024
Signed off — Alteration
HEREWITH FILING TO INSTALL PIPES AND DRAIN FOR WASHER AND DRYER
Q00715305-I1
06/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/03/2024
Filed — Alteration
HEREWITH FILING TO INSTALL PIPES AND DRAIN FOR WASHER AND DRYER
Q00715305-P3
06/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IDRIS SALAM
04/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2024
Filed — Alteration
HEREWITH FILING TO INSTALL PIPES AND DRAIN FOR WASHER AND DRYER
Q00715305-P2
12/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2023
Permit issued — Plumbing
Q00715305-I1-PL
03/23/2023
Filed — Alteration
HEREWITH FILING TO INSTALL PIPES AND DRAIN FOR WASHER AND DRYER
Q00715305-P1
03/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IDRIS SALAM
06/27/2022
Permit issued — Plumbing
Q00715305-I1-PL
04/11/2022
Objection raised — Accessibility
04/11/2022
Objection resolved — Addressed
04/08/2022
Filed — Alteration
HEREWITH FILING TO INSTALL PIPES AND DRAIN FOR WASHER AND DRYER
Q00715305-I1
04/08/2022
Filed — Alteration
Q00715312-I1
04/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
IDRIS SALAM
04/08/2022
Special inspection requirement — Final
Rizwan Salam
12/21/2021
Signed off — Alteration
REPAIR EXISTING LEFT HALF OF DAMAGED WOOD DECK IN REAR YARD. EXISTING RIGHT HALF OF DECK TO REMAIN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00595556-I1
12/20/2021
Permit issued — Structural
Q00595556-I1-ST
10/28/2021
Permit issued — Structural
Q00595556-I1-GC
10/04/2021
Filed — Alteration
REPAIR EXISTING LEFT HALF OF DAMAGED WOOD DECK IN REAR YARD. EXISTING RIGHT HALF OF DECK TO REMAIN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00595556-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C07/16/2023
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C06/27/2022
DOB NOWStructuralSigned-offTOP NOTCH CONSTRUCTION C12/20/2021
DOB NOWStructuralSigned-offTOP NOTCH CONSTRUCTION C10/28/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/03/2024Fire-Resistant Penetrations and JointsIDRIS SALAMspecial
03/22/2023Fire-Resistant Penetrations and JointsIDRIS SALAMspecial
04/08/2022Structural Stability – Alterations of existing buildingsIDRIS SALAMspecial
04/08/2022FinalRizwan Salamprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00595556-I1Request digital key ↗
08/26/2026Q00715312-I1Request digital key ↗
08/25/2026Q00715305-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q00715305-I1Open ↗
08/25/2026Q00715305-P2Open ↗
08/25/2026Q00715305-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00715305-P3Open ↗
08/26/2026Q00715312-I1Open ↗
08/24/2026Q00715305-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026Q00715305-P2Open ↗
08/25/2026Q00715305-P1Open ↗
08/15/2026Q00715305-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00595556-I1Open ↗