← Back
Two family frame
85-02 165 STREET
QUEENS · BIN 4617466
💬 Discuss this project
2019Year Built
3Stories
B2Building Class
R4AZoning
4,293 sfGross Floor Area
2Units
0 Open Violations
Two family frame · 5,766 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 06/15/2020
General Wiring
FiledStatusContractorScope
06/15/2020CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
Building Lifecycle
All (23)Filed (2)Permit Issued (2)Signed Off (2)Violation (12)Inspection (4)Special Inspection (1)
05/12/2025
Signed off — Alteration
Q00000590-I1
04/25/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/18/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/28/2025
Permit issued — Curb Cut
Q00000590-I1-CC
04/19/2022
Signed off — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#421527814. The system is hydraulically calculated. There is no change in use occupancy or egress.
Q00555506-I1
12/28/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/22/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/19/2021
Permit issued — Sprinklers
Q00555506-I1-EW-SP
07/19/2021
Filed — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#421527814. The system is hydraulically calculated. There is no change in use occupancy or egress.
Q00555506-I1
07/11/2021
Special inspection requirement — Sprinkler Systems
Gregory Mortman
10/01/2020
Violation issued (ECB, closed)
Construction
06/28/2019
Violation issued (ECB, closed)
Construction
06/28/2019
Violation issued (ECB, closed)
Construction
06/28/2019
Violation issued (ECB, closed)
Construction
06/28/2019
Violation issued (ECB, closed)
Construction
03/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/05/2017
Filed — Alteration
Q00000590-I1
08/27/2009
Violation issued (ECB, closed)
Construction
03/17/2009
Violation issued (ECB, closed)
Construction
11/01/2006
Violation issued (ECB, closed)
Construction
07/26/2005
Violation issued (ECB, closed)
Construction
04/06/2005
Violation issued (ECB, closed)
Construction
04/06/2005
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHIMA TRED INC103/22/2026
RUPALITRAVEL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANGELO NG + ANTHONY NG ARCHITECTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A NG A NG ARCHITECTS STUDIOGeneral Contractor203/22/2026
NEW FAMILY HOMES & BUILDINGGeneral Contractor203/22/2026
W.R. PLBG AND HTG CORPPlumbing203/22/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
BLUEBUILD MGMT INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOMATED DESIGN CONSULTA895107/19/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBLUEBUILD MGMT INC03/28/2025
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C11/19/2021
BIS—ISSUEDNEW FAMILY HOMES & BUILDING12/09/2021
BISPLISSUEDW.R. PLBG AND HTG CORP10/15/2021
BIS—ISSUEDNEW FAMILY HOMES & BUILDING06/22/2021
BISEQISSUEDNEW FAMILY HOMES & BUILDING12/17/2020
BIS—ISSUEDNEW FAMILY HOMES & BUILDING12/12/2020
BISPLISSUEDW.R. PLBG AND HTG CORP07/07/2020
BIS—ISSUEDNEW FAMILY HOMES & BUILDING03/12/2020
BIS—ISSUEDNEW FAMILY HOMES & BUILDING01/07/2020
BISEQISSUEDNEW FAMILY HOMES & BUILDING01/07/2020
BIS—ISSUEDVERA CARTING CORP04/23/2019
BISEQISSUEDVERA CARTING CORP04/10/2019
BIS—ISSUEDVERA CARTING CORP03/29/2019
BIS—ISSUEDCHAEL CONSTRUCTION INC03/22/2019
BISEQISSUEDCHAEL CONSTRUCTION INC03/22/2019
BIS—ISSUEDVISION CONTRACTING NY COR12/14/2018
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/25/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/18/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
12/28/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/22/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/11/2021Sprinkler SystemsGregory Mortmanspecial
▾Documents — 176 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026Q00000590-I1Request digital key ↗
08/27/2026Q00555506-I1Request digital key ↗
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION22
02/19/2025440455339Open ↗
05/15/2024421405651Open ↗
05/10/2024421405651Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION11
07/07/2020421527814Open ↗
01/13/2020421527814Open ↗
01/13/2020421527814Open ↗
Showing 3 of 11 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
04/03/2017421405651Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/13/2022421527814Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
10/31/2024421405651Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/04/2022421405651Open ↗
▸Seals & Professional Certifications16
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/12/2019440455339Open ↗
11/08/2019421527814Open ↗
11/08/2019421527814Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/27/2019421952177Open ↗
02/11/2018440455339Open ↗
02/28/2017421405651Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/27/2019421952177Open ↗
02/28/2017421405651Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/29/2026Q00000590-I1Open ↗
08/13/2026Q00555506-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q00555506-I1Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING4
01/18/2022421527814Open ↗
08/10/2020421527814Open ↗
07/13/2020421527814Open ↗
Showing 3 of 4 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/28/2023421527814Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/28/2023421527814Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/26/2017421527814Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/04/2025421527814Open ↗
▸Safety & Tenant Protection7
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
04/09/2025421952177Open ↗
08/28/2023421527814Open ↗
▸BISSTREET TREE CHECKLIST2
07/24/2017421527814Open ↗
02/28/2017421405651Open ↗
▸BISSTREET TREE SIGNOFF2
10/25/2023421405651Open ↗
09/20/2022421527814Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/30/2023421527814Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/08/2019421527814Open ↗
11/05/2018421527814Open ↗
12/26/2017421527814Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL ENERGY CONSUMPTION1
08/28/2023421527814Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/28/2023421527814Open ↗
▸BISINTERIOR LIGHTING POWER1
08/28/2023421527814Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
08/28/2023421527814Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/28/2023421527814Open ↗
▸BISFENESTRATION AREAS1
08/28/2023421527814Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/28/2023421527814Open ↗
▸Inspections & Test Reports14
▸BISDEMOLITION (DM) JOB SIGNOFF2
06/19/2025421527814Open ↗
06/19/2025421527814Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
08/28/2023421527814Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/29/2023421527814Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
12/12/2023421527814Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/24/2019421527814Open ↗
▸BISBPP: FIELD INSPECTION1
10/31/2024421405651Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/28/2023421527814Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/28/2023421527814Open ↗
▸BISMECHANICAL SYSTEMS1
08/28/2023421527814Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/28/2023421527814Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/05/2018421527814Open ↗
▸BISMASONRY1
08/28/2023421527814Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/26/2017421527814Open ↗
▸Approvals, Objections & Sign-offs14
▸BISSUPERSEDING LETTER6
01/13/2020421527814Open ↗
01/13/2020421527814Open ↗
05/03/2019421527814Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/23/2020421527814Open ↗
07/20/2020421527814Open ↗
07/13/2020421527814Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
10/31/2024421405651Open ↗
05/15/2024421405651Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/26/2017421527814Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/09/2025421952177Open ↗
▸Cost, Insurance & Ownership9
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/19/2020421527814Open ↗
08/01/2019421952177Open ↗
05/03/2019421527814Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT2
03/27/2019421952177Open ↗
02/11/2018440455339Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
04/04/2019421527814Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
10/31/2024421405651Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/19/2025421952177Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION13
05/15/2024421405651Open ↗
05/15/2024421405651Open ↗
12/12/2023421527814Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET3
03/27/2019421952177Open ↗
07/24/2017421527814Open ↗
02/28/2017421405651Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/11/2018440455339Open ↗
▸Other Documents18
▸BISBPP - SUPPORTING DOCUMENTATION10
10/31/2024421405651Open ↗
10/31/2024421405651Open ↗
10/31/2024421405651Open ↗
Showing 3 of 10 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/09/2022421527814Open ↗
11/17/2021421405651Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
10/31/2024421405651Open ↗
▸BISSHUTOFF DAMPERS1
08/28/2023421527814Open ↗
▸BISLOWEST FLOOR ELEVATION1
07/16/2025421527814Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
10/31/2024421405651Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
05/15/2024421405651Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
08/28/2023421527814Open ↗