| Owner | Filings | Most Recent |
|---|---|---|
| SOUTH 153RD | 14 | 03/21/2026 |
| PT II CONTRACTING | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| TWIG CONSULTING ENGINEERS PC | 2 | 06/10/2021 |
| M C STRUCTURAL ENGINEERING | 2 | 06/01/2021 |
| BLUARCH LLC | 2 | 05/20/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| YBL NY | 12 | 03/21/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| BIS | OT | ISSUED | AUTOMOTIVE FACILITY SVCS | 01/05/2018 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/10/2021 | — | — | Air Conditioning Systems, Ventilation Systems | Cooling Mitsubishi Electric MXZ-4C36NAHZ 36,000 BTU · Heat Pump Outdoor ×2 PUMY-P60NKMU 60,000 BTU · Vrf Outdoor ×2 MXZ-8C48NAHZ 48,000 BTU · Heat Pump Outdoor ×1 Ventilation Delta Breeze SLM80 50 CFM · Exhaust Fan ×5 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2021 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2021 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2021 | — | — | Concrete |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/06/2021 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 07/13/2021 | Air barrier continuity plan testing | — | energy_progress |
| 07/13/2021 | Metering | — | energy_progress |
| 07/13/2021 | Electrical motors and elevators | — | energy_progress |
| 07/13/2021 | Electric vehicle service equipment requirements | — | energy_progress |
| 07/13/2021 | Vestibules | — | energy_progress |
| 06/10/2021 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/10/2021 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/10/2021 | HVAC-R and service water heating equipment | — | energy_progress |
| 05/27/2021 | Footing and Foundation | — | progress |
| 05/27/2021 | Sprinkler Systems | — | special |
| 05/27/2021 | Concrete - Cast-In-Place | — | special |
| 05/27/2021 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 05/27/2021 | Subgrade Inspections | — | special |
| 05/27/2021 | Final | — | progress |
| 05/10/2021 | Interior lighting power | — | energy_progress |
| 05/10/2021 | Energy Code Compliance Inspections | — | progress |
| 05/10/2021 | Structural Stability – Alterations of existing buildings | — | special |
| 05/10/2021 | Fenestration areas | — | energy_progress |
| 05/10/2021 | Demolition | — | special |
| 05/10/2021 | Lighting controls | — | energy_progress |
| 05/10/2021 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 05/10/2021 | Masonry | — | special |
| 05/10/2021 | Lighting in dwelling units | — | energy_progress |
| 05/10/2021 | Maintenance information | — | energy_progress |