← Back
Other miscellaneous
153 STREET
QUEENS · BIN 4617730
💬 Discuss this project
1995Year Built
1Stories
Z9Building Class
R5DZoning
360 sfGross Floor Area
1Units
Other miscellaneous · Owner of record: SOUTH 153RD LLC · 15,800 sf lot · 0.02 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOUTH 153RD1403/21/2026
PT II CONTRACTING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TWIG CONSULTING ENGINEERS PC206/10/2021
M C STRUCTURAL ENGINEERING206/01/2021
BLUARCH LLC205/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY1203/21/2026
Building Lifecycle
All (74)Filed (6)Objection (38)Special Inspection (30)
08/06/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/28/2021
Objection raised — Other
07/28/2021
Objection resolved — Addressed
07/28/2021
Objection raised — Zoning
07/28/2021
Objection resolved — Addressed
07/28/2021
Objection raised — Zoning
07/28/2021
Objection resolved — Addressed
07/28/2021
Objection raised — Accessibility
07/28/2021
Objection resolved — Addressed
07/28/2021
Objection raised — Zoning
07/28/2021
Objection resolved — Addressed
07/13/2021
Special inspection requirement — Air barrier continuity plan testing
07/13/2021
Special inspection requirement — Metering
07/13/2021
Special inspection requirement — Electrical motors and elevators
07/13/2021
Special inspection requirement — Electric vehicle service equipment requirements
07/13/2021
Special inspection requirement — Vestibules
06/29/2021
Objection raised — Scope
06/29/2021
Objection resolved — Addressed
06/29/2021
Objection raised — Inspections
06/29/2021
Objection resolved — Addressed
06/29/2021
Objection raised — Other
06/29/2021
Objection resolved — Addressed
06/21/2021
Objection raised — Other
06/21/2021
Objection resolved — Addressed
06/17/2021
Objection raised — Other
06/17/2021
Objection resolved — Addressed
06/14/2021
Objection raised — Other
06/14/2021
Objection resolved — Addressed
06/10/2021
Filed — New Building
MH WORK IN-CONJUNCTION WITH NEW BUILDING
Q00517904-S4
06/10/2021
Filed — New Building
MH WORK IN-CONJUNCTION WITH NEW BUILDING
Q00517904-S3
06/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
06/10/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
06/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
06/03/2021
Objection raised — Energy
06/03/2021
Objection resolved — Addressed
06/03/2021
Objection raised — Energy
06/03/2021
Objection resolved — Addressed
06/03/2021
Objection raised — Energy
06/03/2021
Objection resolved — Addressed
06/03/2021
Objection raised — Energy
06/03/2021
Objection resolved — Addressed
06/03/2021
Objection raised — Energy
06/03/2021
Objection resolved — Addressed
06/03/2021
Objection raised — Energy
06/03/2021
Objection resolved — Addressed
06/03/2021
Objection raised — Energy
06/03/2021
Objection resolved — Addressed
06/03/2021
Objection raised — Energy
06/03/2021
Objection resolved — Addressed
06/01/2021
Filed — New Building
MH WORK IN-CONJUNCTION WITH NEW BUILDING
Q00517904-S1
06/01/2021
Filed — New Building
MH WORK IN-CONJUNCTION WITH NEW BUILDING
Q00517904-S2
05/27/2021
Special inspection requirement — Footing and Foundation
05/27/2021
Special inspection requirement — Sprinkler Systems
05/27/2021
Special inspection requirement — Concrete - Cast-In-Place
05/27/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/27/2021
Special inspection requirement — Subgrade Inspections
05/27/2021
Special inspection requirement — Final
05/20/2021
Filed — New Building
MH WORK IN-CONJUNCTION WITH NEW BUILDING
Q00517904-I1
05/20/2021
Filed — Alteration
22' existing curb cut adjust with new building Q00517904.
Q00522367-I1
05/10/2021
Special inspection requirement — Interior lighting power
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDAUTOMOTIVE FACILITY SVCS01/05/2018
1 project · most recent 06/10/2021
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/10/2021——Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-4C36NAHZ 36,000 BTU · Heat Pump Outdoor ×2
PUMY-P60NKMU 60,000 BTU · Vrf Outdoor ×2
MXZ-8C48NAHZ 48,000 BTU · Heat Pump Outdoor ×1
Ventilation
Delta Breeze SLM80 50 CFM · Exhaust Fan ×5
1 project · most recent 06/10/2021
Sprinkler System
FiledStatusContractorScope
06/10/2021——Sprinkler System
1 project · most recent 06/10/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/10/2021——Gas, Storm, Water/Sanitary
1 project · most recent 06/10/2021
Concrete
FiledStatusContractorScope
06/10/2021——Concrete
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
08/06/2021Subsurface Investigations (Borings/Test Pits)—special
07/13/2021Air barrier continuity plan testing—energy_progress
07/13/2021Metering—energy_progress
07/13/2021Electrical motors and elevators—energy_progress
07/13/2021Electric vehicle service equipment requirements—energy_progress
07/13/2021Vestibules—energy_progress
06/10/2021HVAC-R and service water heating system controls—energy_progress
06/10/2021HVAC-R and service water piping design and insulation—energy_progress
06/10/2021HVAC-R and service water heating equipment—energy_progress
05/27/2021Footing and Foundation—progress
05/27/2021Sprinkler Systems—special
05/27/2021Concrete - Cast-In-Place—special
05/27/2021Excavations - Sheeting, Shoring, and Bracing—special
05/27/2021Subgrade Inspections—special
05/27/2021Final—progress
05/10/2021Interior lighting power—energy_progress
05/10/2021Energy Code Compliance Inspections—progress
05/10/2021Structural Stability – Alterations of existing buildings—special
05/10/2021Fenestration areas—energy_progress
05/10/2021Demolition—special
05/10/2021Lighting controls—energy_progress
05/10/2021HVAC-R and service water piping design and insulation—energy_progress
05/10/2021Masonry—special
05/10/2021Lighting in dwelling units—energy_progress
05/10/2021Maintenance information—energy_progress
Latest 25 of 38.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00517904-S2Request digital key ↗
08/27/2026Q00517904-S1Request digital key ↗
08/15/2026Q00517904-S4Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
05/19/2021440674539Open ↗
11/17/2017421555748Open ↗
09/27/2017421555748Open ↗
▸BISWORK PERMIT APPLICATION1
01/08/2018421555748Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/19/2021440674539Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/28/2017421555748Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q00517904-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q00517904-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00517904-S1Open ↗
08/27/2026Q00517904-S4Open ↗
08/27/2026Q00517904-S3Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/27/2017421555748Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/19/2021440674539Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/28/2017421555748Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/19/2021440674539Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/27/2017421555748Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026Q00517904-I1Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST1
05/19/2021440674539Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
09/28/2017421555748Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026Q00517904-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/15/2026Q00517904-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026Q00517904-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/27/2017421555748Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/15/2026Q00517904-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
09/28/2017421555748Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/27/2017421555748Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
11/17/2017421555748Open ↗
11/17/2017421555748Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/19/2021440674539Open ↗
▸BISBOROUGH INTAKE FORM1
11/17/2017421555748Open ↗
▸BISEFILING COVER SHEET1
09/27/2017421555748Open ↗
▸Other Documents2
▸BISBPP - SUPPORTING DOCUMENTATION1
05/19/2021440674539Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026Q00517904-I1Open ↗