← Back
Walk-up cooperative
199-01 17 AVENUE
QUEENS · BIN 4619149
💬 Discuss this project
1952Year Built
2Stories
C6Building Class
R3-2Zoning
123,031 sfGross Floor Area
152Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up cooperative · Owner of record: N 16TH AVE AND W UTOPIA PKWY LLC · 273,700 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 8 docs
Floor 11p · 1 filing · 8 docs
Nothing on file for this building.
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (4)
05/13/2026
Filed — Alteration
Remove and replace failing fire wall between adjacent buildings.
Q00570318-P1
03/07/2022
Signed off — Alteration
Remove and replace failing fire wall between adjacent buildings.
Q00570318-I1
12/08/2021
Permit issued — General Construction
Q00570318-I1-GC
08/16/2021
Filed — Alteration
Remove and replace failing fire wall between adjacent buildings.
Q00570318-I1
08/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Solomon Rosenzweig
08/16/2021
Special inspection requirement — Masonry
Solomon Rosenzweig
08/16/2021
Special inspection requirement — Fire-Resistance Rated Construction
Solomon Rosenzweig
08/16/2021
Special inspection requirement — Final
Solomon Rosenzweig
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOLOMON ROSENZWEIG P.E P.C.205/13/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMPASS CONSTRUCTION OF NGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOLOMON ROSENZWEIG P.E. P1801205/13/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCOMPASS CONSTRUCTION OF N12/08/2021
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/16/2021Fire-Resistant Penetrations and JointsSolomon Rosenzweigspecial
08/16/2021MasonrySolomon Rosenzweigspecial
08/16/2021Fire-Resistance Rated ConstructionSolomon Rosenzweigprogress
08/16/2021FinalSolomon Rosenzweigprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q00570318-I1Request digital key ↗
08/16/2026Q00570318-P1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q00570318-P1Open ↗
08/13/2026Q00570318-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026Q00570318-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q00570318-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q00570318-P1Open ↗
08/13/2026Q00570318-I1Open ↗