← Back
Walk-up cooperative
84-05 SHORE PARKWAY
QUEENS · BIN 4619445
💬 Discuss this project
1959Year Built
2Stories
C6Building Class
R5Zoning
76,548 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized20 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: DELKAP MANAGEMENT INC · 163,600 sf lot · 0.47 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CD ARCHITECT STUDIO, LLP108/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON PAUL DESIGN & CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINCHESE CONSTRUCTION INGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CD ARCHITECT STUDIO, LLP2573108/28/2025
Building Lifecycle
All (16)Filed (1)Permit Issued (1)Signed Off (1)Violation (8)Inspection (1)Objection (4)
05/08/2026
Violation issued (HPD, closed)
A
03/31/2026
Signed off — Alteration
RESTORE EX. APARTMENT & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION & COSMETIC FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Q01271364-I1
03/27/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/31/2025
Permit issued — General Construction
Q01271364-I1-GC
10/20/2025
Objection resolved — Addressed
09/19/2025
Objection resolved — Addressed
09/18/2025
Objection raised — Scope
09/18/2025
Objection raised — Cost
08/28/2025
Filed — Alteration
RESTORE EX. APARTMENT & REPAIR FIRE DAMAGES INCLUDING GENERAL CONSTRUCTION & COSMETIC FINISHES. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Q01271364-I1
06/13/2025
Violation issued (HPD, closed)
A
03/31/2023
Violation issued (HPD, closed)
A
11/16/2022
Violation issued (HPD, closed)
I
03/10/2022
Violation issued (HPD, closed)
A
04/20/2021
Violation issued (HPD, closed)
I
04/20/2021
Violation issued (HPD, closed)
A
11/06/2019
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTRINCHESE CONSTRUCTION IN10/31/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01271364-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026Q01271364-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026Q01271364-I1Open ↗