← Back
Two family brick
214-31 39TH AVENUE
QUEENS · BIN 4619899
💬 Discuss this project
0Year Built
—Stories
B1Building Class
R3XZoning
2,394 sfGross Floor Area
2Units
0 Open Violations
Two family brick · Owner of record: 39TH BAYSIDE LLC · 3,500 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Floor 28p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
1 job · most recent 12/02/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/02/2025Signed-offPRECISION HOME DEV INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree FLEXX60HP230V1AO / FLEXX48HP230V1BH 4 tons · Heat Pump Outdoor ×8
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×20
FV-15VQ5 150 CFM · Exhaust Fan ×8
1 job · most recent 12/02/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/02/2025Signed-offNYC MAINMAN CORPStorm, Water/Sanitary
1 job · most recent 02/09/2025
General Wiring
FiledStatusContractorScope
02/09/2025CompleteSKY ELECTRIC LLCGeneral Wiring
1 job · most recent 12/02/2025
Concrete Wood
FiledStatusContractorScope
12/02/2025Signed-offNYC MAINMAN CORPConcrete, Wood
1 job · most recent 12/02/2025
Fence
FiledStatusContractorScope
12/02/2025Signed-offNYC MAINMAN CORPFence
1 job · most recent 12/02/2025
Earthwork
FiledStatusContractorScope
12/02/2025Signed-offNYC MAINMAN CORPEarthwork
Building Lifecycle
All (59)Filed (8)Permit Issued (5)Signed Off (5)Violation (1)Inspection (10)Special Inspection (30)
05/20/2026
Signed off — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-I1
12/02/2025
Filed — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-P3
10/27/2025
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Subgrade Inspections
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Final
NAVEEN KUMAR
10/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Structural Wood Frame
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Air barrier — testing
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Interior lighting power
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Air barrier - visual inspection
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Metering
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Duct leakage testing, insulation and design
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Electric vehicle service equipment requirements
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Ventilation and air distribution system
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — Insulation placement and R values
PIROOZ SOLTANIZADEH
10/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
10/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/11/2025
Signed off — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-S5
09/21/2025
Signed off — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-S2
09/17/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/15/2025
Signed off — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-S1
09/06/2025
Filed — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-P2
09/05/2025
Signed off — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-S3
05/07/2025
Violation issued (ECB, closed)
Construction
04/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2025
Inspection — Pass-Final House Connection
Pass
View inspection ↗
03/26/2025
Permit issued — Plumbing
Q01108893-S5-PL
03/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/21/2025
Filed — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-S5
03/04/2025
Filed — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-P1
02/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2025
Permit issued — Plumbing
Q01108893-S1-PL
01/17/2025
Filed — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-S1
12/27/2024
Permit issued — Mechanical Systems
Q01108893-I1-GC-CX
12/27/2024
Permit issued — Construction Fence
Q01108893-S3-FN
12/27/2024
Permit issued — Curb Cut
Q01108893-S2-CC
10/07/2024
Filed — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-S2
10/06/2024
Filed — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-S3
09/17/2024
Filed — New Building
FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE.
Q01108893-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS2304/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.712/02/2025
MEHRABAN AHOURAIE103/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PIROOZ ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor304/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177512/02/2025
IP CONCRETE TESTING AND I6252101/17/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC03/26/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/07/2025
DOB NOWMechanical SystemsPermit IssuedPRECISION HOME DEV INC12/27/2024
DOB NOWConstruction FenceSigned-offPRECISION HOME DEV INC12/27/2024
DOB NOWCurb CutSigned-offPRECISION HOME DEV INC12/27/2024
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/17/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2025Pass-Final House ConnectionPassView ↗
03/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/24/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/24/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
10/27/2025Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
10/27/2025Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
10/27/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
10/27/2025Heating SystemsPIROOZ SOLTANIZADEHspecial
10/27/2025MasonryPIROOZ SOLTANIZADEHspecial
10/27/2025Mechanical SystemsPIROOZ SOLTANIZADEHspecial
10/27/2025Subgrade InspectionsPIROOZ SOLTANIZADEHspecial
10/27/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
10/27/2025Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
10/27/2025FinalNAVEEN KUMARprogress
10/27/2025Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
10/27/2025Footing and FoundationPIROOZ SOLTANIZADEHprogress
10/27/2025PreliminaryPIROOZ SOLTANIZADEHprogress
10/27/2025Structural Wood FramePIROOZ SOLTANIZADEHprogress
10/27/2025Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
10/27/2025Air barrier — testing PIROOZ SOLTANIZADEHenergy_progress
10/27/2025Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
10/27/2025Permanent certificatePIROOZ SOLTANIZADEHenergy_progress
10/27/2025Interior lighting powerPIROOZ SOLTANIZADEHenergy_progress
10/27/2025Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
10/27/2025HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
10/27/2025Air barrier - visual inspectionPIROOZ SOLTANIZADEHenergy_progress
10/27/2025Fenestration air leakagePIROOZ SOLTANIZADEHenergy_progress
10/27/2025HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
10/27/2025MeteringPIROOZ SOLTANIZADEHenergy_progress
Latest 25 of 38.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026Q01108893-S5Request digital key ↗
08/20/2026Q01108893-P1Request digital key ↗
08/20/2026Q01108893-S3Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
05/14/2025440819919Open ↗
10/08/2024440819919Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
11/12/2025440819919Open ↗
▸BISDOT- 410 PERMITS FOR ADA RAMPS1
11/12/2025440819919Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/08/2024440819919Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram4
08/20/2026Q01108893-P1Open ↗
08/20/2026Q01108893-I1Open ↗
08/13/2026Q01108893-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/20/2026Q01108893-I1Open ↗
08/20/2026Q01108893-P1Open ↗
08/13/2026Q01108893-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/20/2026Q01108893-P1Open ↗
08/20/2026Q01108893-I1Open ↗
08/13/2026Q01108893-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026Q01108893-S5Open ↗
08/20/2026Q01108893-P1Open ↗
08/20/2026Q01108893-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026Q01108893-S1Open ↗
08/25/2026Q01108893-S1Open ↗
08/23/2026Q01108893-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026Q01108893-S1Open ↗
08/25/2026Q01108893-S1Open ↗
08/23/2026Q01108893-P3Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/08/2024440819919Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/08/2024440819919Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/20/2026Q01108893-P1Open ↗
08/20/2026Q01108893-I1Open ↗
08/13/2026Q01108893-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist4
08/20/2026Q01108893-P2Open ↗
08/20/2026Q01108893-P1Open ↗
08/20/2026Q01108893-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES SITE PLAN1
11/11/2025440819919Open ↗
▸BISSTREET TREE CHECKLIST1
11/08/2024440819919Open ↗
▸BISSTREET TREE SIGNOFF1
11/11/2025440819919Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/20/2026Q01108893-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/20/2026Q01108893-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/20/2026Q01108893-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/20/2026Q01108893-I1Open ↗
08/20/2026Q01108893-P1Open ↗
08/13/2026Q01108893-P3Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: FIELD INSPECTION1
11/12/2025440819919Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/20/2026Q01108893-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/12/2025440819919Open ↗
▸BISCURB CUT (CC) SIGNOFF1
11/11/2025440819919Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
11/12/2025440819919Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
10/08/2024440819919Open ↗
▸BISADDITIONAL INFORMATION1
05/16/2025440819919Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial4
08/20/2026Q01108893-P1Open ↗
08/20/2026Q01108893-I1Open ↗
08/13/2026Q01108893-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026Q01108893-P2Open ↗
08/20/2026Q01108893-P1Open ↗
08/20/2026Q01108893-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/20/2026Q01108893-I1Open ↗
08/20/2026Q01108893-P1Open ↗
08/13/2026Q01108893-P3Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
11/12/2025440819919Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
11/08/2024440819919Open ↗
▸BISDOT COMPLIANCES AT CORNER ADA RAMPS ANDOPPOSITE SITES1
11/12/2025440819919Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
11/12/2025440819919Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
11/12/2025440819919Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
11/12/2025440819919Open ↗
▸DOB NOWFinal Survey1
08/20/2026Q01108893-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/20/2026Q01108893-I1Open ↗