← Back
Primarily 1 family with 2 stores or offices
65TH PLACE
QUEENS · BIN 4620189
💬 Discuss this project
1954Year Built
3Stories
S0Building Class
R4Zoning
3,768 sfGross Floor Area
3Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Primarily 1 family with 2 stores or offices · Owner of record: REISSANIDIS TWINS REALTY LLC · 3,000 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 14p · 1 filing · 10 docs
1 job · most recent 11/05/2024
Gas Water/Sanitary
FiledStatusContractorScope
11/05/2024Permit IssuedALL PRO PLBG & HTG INCGas, Water/Sanitary
3 jobs · most recent 08/23/2025
General Wiring
FiledStatusContractorScope
08/23/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
12/12/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
09/22/2020CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
Building Lifecycle
All (16)Filed (2)Permit Issued (2)Violation (3)Inspection (2)Special Inspection (7)
06/03/2025
Violation issued (ECB, open)
Construction
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/19/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/12/2024
Violation issued (ECB, open)
Unknown
11/26/2024
Permit issued — General Construction
Q01135175-I1-GC-CX
11/25/2024
Permit issued — Plumbing
Q01135175-S1-PL
11/05/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF EXIST. STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01135175-I1
11/05/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF EXIST. STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01135175-S1
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
10/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
Alexander Bomstein
10/30/2024
Special inspection requirement — Mechanical Systems
Pablo Ayala
10/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
10/30/2024
Special inspection requirement — Final
Pablo Ayala
10/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
10/30/2024
Special inspection requirement — Interior lighting power
Pablo Ayala
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REISSANIDIS TWINS REALTY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AYALA ENGINEERING PC211/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BG CONSTRUCTION NY INCGeneral Contractor303/21/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B WORLD CONSULTING, INC5704211/05/2024
AYALA ENGINEERING P.C.9207211/05/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBG CONSTRUCTION NY INC11/26/2024
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC11/25/2024
BIS—ISSUEDN/A02/24/2021
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/19/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/30/2024Fire-Resistant Penetrations and JointsPablo Ayalaspecial
10/30/2024Tenant Protection Plan ComplianceAlexander Bomsteinspecial
10/30/2024Mechanical SystemsPablo Ayalaspecial
10/30/2024Energy Code Compliance InspectionsPablo Ayalaprogress
10/30/2024FinalPablo Ayalaprogress
10/30/2024HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
10/30/2024Interior lighting powerPablo Ayalaenergy_progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026Q01135175-I1Request digital key ↗
08/21/2026Q01135175-S1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
07/15/2021421775591Open ↗
07/15/2021421775591Open ↗
02/10/2021421775591Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/06/2021421775591Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/20/2020421775591Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
06/15/2021421775591Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/15/2021421775591Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01135175-S1Open ↗
08/13/2026Q01135175-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01135175-I1Open ↗
09/01/2026Q01135175-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01135175-I1Open ↗
09/01/2026Q01135175-I1Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST3
04/23/2021421775591Open ↗
02/10/2021421775591Open ↗
10/15/2020421775591Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01135175-I1Open ↗
08/13/2026Q01135175-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
10/20/2020421775591Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
10/15/2020421775591Open ↗
▸BISCOST AFFIDAVIT1
04/23/2021421775591Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
07/15/2021421775591Open ↗
04/23/2021421775591Open ↗
02/10/2021421775591Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
07/15/2021421775591Open ↗
▸BISEFILING COVER SHEET1
10/20/2020421775591Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
12/16/2020421775591Open ↗