← Back
Banking facility, with or without parking
69-20 80 STREET
QUEENS · BIN 4620236
💬 Discuss this project
2008Year Built
1Stories
K7Building Class
R4Zoning
3,520 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Banking facility, with or without parking · Owner of record: VALLEY NATIONAL REALTY LLC · 13,672 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingOther
Roof3p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VALLEY NATIONAL BANK409/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.204/06/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOUND REFRIGERATION & AIRGeneral Contractor104/09/2026
DJC CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808104/06/2026
Building Lifecycle
All (11)Filed (2)Permit Issued (2)Signed Off (2)Violation (1)Inspection (1)Special Inspection (3)
06/22/2026
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT ROOFTOP PACKAGED HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01377899-I1
06/18/2026
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT ROOFTOP PACKAGED HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01377899-S1
05/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT ROOFTOP PACKAGED HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01377899-I1
04/06/2026
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT ROOFTOP PACKAGED HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01377899-S1
04/06/2026
Permit issued — Mechanical Systems
Q01377899-I1-MS
04/06/2026
Permit issued — Plumbing
Q01377899-S1-PL
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
03/25/2026
Special inspection requirement — Mechanical Systems
Joseph Bazini
03/25/2026
Special inspection requirement — Final
Joseph Bazini
03/15/2001
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSOUND REFRIGERATION & AIR04/06/2026
DOB NOWPlumbingSigned-offDJC CORP04/06/2026
1 project · most recent 04/06/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/06/2026Signed-offSOUND REFRIGERATION & AIRHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane YHK180A3S0H 15 tons · Rooftop Unit ×1
Ventilation
Trane YHK180A3S0H 5,250 CFM · Rooftop Unit ×1
1 project · most recent 04/06/2026
Gas
FiledStatusContractorScope
04/06/2026Signed-offDJC CORPGas
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
03/31/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
03/25/2026Mechanical SystemsJoseph Bazinispecial
03/25/2026FinalJoseph Baziniprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026Q01377899-I1Request digital key ↗
08/17/2026Q01377899-S1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01377899-S1Open ↗
08/17/2026Q01377899-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q01377899-I1Open ↗
08/29/2026Q01377899-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026Q01377899-I1Open ↗