ECB05/12/2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FLOOR GYM ONE EMERGNothing owed — awaiting certificate of correction
ECB05/12/2026REISSUE: 35720058X DATE OF ISSUE: 06/10/2025. EXIT DOOR NOT SELF-CLOSING PROPERLY. AT THE TIME OF INSPECTION OBSERVED AND NOTED EXIT-23 2 EXIT DOORS AT 218 SR DOORS ARE ROTTED AND IN DISREPAIR, AT EXIT-7 ONE EXNothing owed — awaiting certificate of correction
ECB06/10/2025REISSUE#3567578Z EXIT DOOR NOT SELF-CLOSING.NOTED AT 2-3,8 BOTTOM OF DOORS ROTTED & INDISREPAIR AT EXIT 7 DOOR NOT SELF-CLOSING.REM:REPAIR/REPLACE DOOR.Nothing owed — awaiting certificate of correction
ECB06/10/2025REISSUE#35677576P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT ROOFTOP PARAPET MISSING 2 GUARDRAILS.REM:REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB07/18/2024EXIT DOOR NOT SELF-CLOSING.NOTED:EXIT DOOR 2-3 AT 218 STREET ROTTED ATBOTTOM AND DO NOT CLOSE PROPERLY.REM:REPAIR/REPLACE DOOR.Nothing owed — awaiting certificate of correction
ECB07/18/2024REISSUE#35676251M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT ROOFTOP 2 PARAPET RAILING SECTION MISSING.ALSO ROOM#127 ANDBOILER ROOM ROOF DO NOT HAVE PARAPET AT ALL.REM:PROVIDE PARAPET/RAILINNothing owed — awaiting certificate of correction
ECB07/27/2023REISSUED #35665502N: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT ROOFTOP PARAPET MISSING PANELS IN VARIOUS AREA, EXP #2 SECTION NO GUARDRAIL. REMEDY: REPAIR AND/OR REPLACENothing owed — awaiting certificate of correction
ECB06/23/2022REISSUED35587092J FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER NOTED:OBSERVED@ROOF LEVEL 2METAL PARAPET PANELS MISSING ALSO MISSING ENTIRE SEC@GUARDRAIL@LOWER SECD ROOF FACING EXP2 REPAIR &OR REPLACENothing owed — awaiting certificate of correction
ECB08/17/2021REISSUE ECB35495406P FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER NOTED:@ROOFTOP LEVEL 2METAL PARAPET PANELS MISSING REPAIR &/OR REPLACENothing owed — awaiting certificate of correction
ECB06/30/2020FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER(REISSUE ECB#35447710N). NOTED: AT ROOF LEVEL 2 METAL PARAPET PANELS MISSING. REMEDY: REPAIR &/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB09/20/2019FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT ROOF TOP,2 FIRE FEET METAL PARAPET PANELS MISSING. REMEDY: REPAIR/REPLACE.Nothing owed — awaiting certificate of correction
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 117,575 sf lot · 0.72 FAR built · Flood zone X