← Back
Two family brick
160-26 119TH DRIVE
QUEENS · BIN 4623151
💬 Discuss this project
2022Year Built
—Stories
B1Building Class
R3AZoning
2,090 sfGross Floor Area
2Units
Two family brick · 3,000 sf lot · 0.7 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MRAG DEVELOPMENT603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/09/2025$1.2M—160-26 119 DRIVE LLC → Private party$565/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADRIAGA ENGINEERING P.C.605/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BERNARDO GAMBA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor1203/21/2026
MADRIAGA ENGINEERING P CGeneral Contractor303/22/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637201/22/2024
Building Lifecycle
All (99)Filed (6)Permit Issued (6)Signed Off (3)Inspection (7)Objection (58)Special Inspection (19)
04/01/2026
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION JOB # 421941607.
Q00696168-I1
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
05/19/2025
Objection raised — Plumbing
05/12/2025
Objection raised — Plumbing
05/12/2025
Objection raised — Plumbing
05/06/2025
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
05/04/2025
Filed — New Building
NEW CAR GARAGE BUILDING
Q00568249-S1
05/04/2025
Special inspection requirement — Energy Code Compliance Inspections
05/04/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/04/2025
Special inspection requirement — Air barrier - visual inspection
04/28/2025
Special inspection requirement — Energy Code Compliance Inspections
01/03/2025
Objection raised — Energy
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection raised — Inspections
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection raised — Inspections
01/03/2025
Objection resolved — Addressed
04/01/2024
Signed off — Alteration
CURB CUT 10' WIDE INCLUDING SPLAYS
Q00424772-I1
03/06/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/01/2024
Signed off — Alteration
MECHANICAL SYSTEM APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION JOB# 421941607.
Q00696236-I1
02/23/2024
Objection raised — Other
02/23/2024
Objection resolved — Addressed
02/21/2024
Permit issued — Mechanical Systems
Q00696236-I1-MS
01/31/2024
Permit issued — Curb Cut
Q00424772-I1-CC
01/22/2024
Filed — Alteration
MECHANICAL SYSTEM APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION JOB# 421941607.
Q00696236-I1
01/22/2024
Special inspection requirement — Interior lighting power
01/22/2024
Special inspection requirement — Electric vehicle service equipment requirements
01/22/2024
Special inspection requirement — Maintenance information
02/21/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
02/21/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/21/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/31/2023
Permit issued — Plumbing
Q00696168-I1-PL
08/25/2022
Permit issued — Construction Fence
Q00430550-I1-FN
07/14/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/01/2022
Permit issued — Plumbing
Q00696168-I1-PL
06/24/2022
Objection raised — Energy
06/24/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Energy
06/24/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Energy
06/24/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Energy
06/24/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Energy
06/24/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Energy
06/24/2022
Objection resolved — Addressed
03/18/2022
Objection raised — Structural
03/18/2022
Objection resolved — Addressed
03/18/2022
Objection raised — Scope
03/18/2022
Objection resolved — Addressed
03/18/2022
Objection raised — Admin
03/18/2022
Objection resolved — Addressed
03/18/2022
Objection raised — Mechanical
03/18/2022
Objection resolved — Addressed
03/11/2022
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION JOB # 421941607.
Q00696168-I1
03/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offYAFE MEOD CORP02/21/2024
DOB NOWCurb CutSigned-offYAFE MEOD CORP01/31/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR01/31/2023
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP08/25/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING07/01/2022
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP09/20/2021
BIS—ISSUEDYAFE MEOD CORP08/24/2022
BIS—ISSUEDYAFE MEOD CORP08/10/2022
BIS—ISSUEDYAFE MEOD CORP09/17/2021
BIS—ISSUEDYAFE MEOD CORP09/17/2021
1 project · most recent 05/04/2025
Water/Sanitary
FiledStatusContractorScope
05/04/2025——Water/Sanitary
1 project · most recent 01/08/2024
General Wiring Lighting
FiledStatusContractorScope
01/08/2024CompleteBDS ELECTRIC CORP.General Wiring, Lighting
1 project · most recent 05/04/2025
FiledStatusContractorScope
05/04/2025——1 scope_items
1 project · most recent 09/07/2021
Fence
FiledStatusContractorScope
09/07/2021Signed-offYAFE MEOD CORPFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/06/2025Pass-Final Fence Non-Directive 14PassView ↗
03/06/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
02/21/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
02/21/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/21/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/04/2025Energy Code Compliance Inspections—progress
05/04/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/04/2025Air barrier - visual inspection—energy_progress
04/28/2025Energy Code Compliance Inspections—progress
01/22/2024Interior lighting power—energy_progress
01/22/2024Electric vehicle service equipment requirements—energy_progress
01/22/2024Maintenance information—energy_progress
03/10/2022Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
03/10/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRobert Truskoskyspecial
03/10/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRobert Truskoskyspecial
03/10/2022Sprinkler SystemsRobert Truskoskyspecial
03/10/2022HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
03/10/2022HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
03/10/2022HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
08/04/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/04/2021Masonry—special
08/04/2021Concrete - Cast-In-Place—special
07/30/2021Footing and Foundation—progress
07/30/2021Final—progress
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/27/2026Q00568249-S1Request digital key ↗
08/26/2026Q00696168-I1Request digital key ↗
08/23/2026Q00696236-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00424772-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00430550-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION12
05/12/2025421941607Open ↗
04/29/2025421946899Open ↗
04/28/2025421946899Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION4
05/09/2025421946899Open ↗
10/01/2021421941607Open ↗
10/01/2021421941607Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/08/2025421946899Open ↗
12/21/2023421946899Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS2
05/09/2025421946899Open ↗
05/09/2025421946899Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/24/2020421941607Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
02/22/2024421941607Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/17/2024421941607Open ↗
▸BISVERIFY TAX LOT1
02/22/2024421941607Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/22/2024421941607Open ↗
▸BISZONING DIAGRAM1
11/24/2020421941607Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/17/2024421941607Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00568249-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00430550-I1Open ↗
08/27/2026Q00568249-S1Open ↗
08/27/2026Q00568249-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/27/2020421941607Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q00696168-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q00696168-I1Open ↗
▸Trade Schedules & Equipment7
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
02/27/2024421941607Open ↗
02/27/2024421941607Open ↗
▸BISSPRINKLER SYSTEMS1
04/01/2024421941607Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/09/2024421941607Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/09/2024421941607Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
09/08/2021421941607Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00568249-I1Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST5
12/21/2023421946899Open ↗
07/19/2023421946899Open ↗
03/11/2021421946899Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES SITE PLAN2
10/17/2024421946899Open ↗
02/22/2024421941607Open ↗
▸BISSTREET TREE SIGNOFF2
10/17/2024421946899Open ↗
10/09/2024421941607Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/27/2021421941607Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00568249-I1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/19/2024421941607Open ↗
12/29/2021421941607Open ↗
07/30/2021421941607Open ↗
Showing 3 of 5 on file for this type
▸BISINTERIOR LIGHTING POWER2
02/27/2024421941607Open ↗
02/27/2024421941607Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/01/2024421941607Open ↗
▸BISFENESTRATION AREAS1
02/27/2024421941607Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
02/27/2024421941607Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/01/2024421941607Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/27/2024421941607Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/27/2024421941607Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/27/2024421941607Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/27/2020421941607Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
02/27/2024421941607Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00696168-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY9
01/19/2024421941607Open ↗
01/19/2024421941607Open ↗
12/29/2021421941607Open ↗
Showing 3 of 9 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
02/27/2024421941607Open ↗
03/23/2021421941607Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/25/2024421941607Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/25/2024421941607Open ↗
▸BISMASONRY1
03/25/2024421941607Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/25/2024421941607Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
04/01/2024421941607Open ↗
▸BISSOIL REPORT1
11/24/2020421941607Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/24/2020421941607Open ↗
▸BISMECHANICAL SYSTEMS1
04/01/2024421941607Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/19/2023421946899Open ↗
11/24/2020421941607Open ↗
11/24/2020421941607Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/11/2024421941607Open ↗
11/13/2024421941607Open ↗
11/23/2020421941607Open ↗
Showing 3 of 4 on file for this type
▸BISCURB CUT (CC) SIGNOFF2
10/17/2024421946899Open ↗
07/09/2024421941607Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
05/09/2025421946899Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET4
12/21/2023421946899Open ↗
07/19/2023421946899Open ↗
04/17/2020421946899Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
05/09/2025421946899Open ↗
04/20/2020421941607Open ↗
04/17/2020421946899Open ↗
▸BISADDITIONAL INFORMATION3
12/17/2024421941607Open ↗
12/21/2023421946899Open ↗
07/19/2023421946899Open ↗
▸Other Documents15
▸BISBPP - SUPPORTING DOCUMENTATION2
03/11/2021421946899Open ↗
03/11/2021421946899Open ↗
▸BISPERMANENT CERTIFICATE2
02/27/2024421941607Open ↗
02/27/2024421941607Open ↗
▸BISMAINTENANCE INFORMATION2
02/27/2024421941607Open ↗
02/27/2024421941607Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
05/08/2025421946899Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/21/2023421946899Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
03/25/2024421941607Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
02/27/2024421941607Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
05/08/2025421946899Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
04/01/2024421941607Open ↗
▸BISPLOT DIAGRAM1
01/27/2020421941607Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
04/01/2024421941607Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00568249-I1Open ↗