← Back
Two stories - detached, small or mid-size
133-02 14 AVENUE
QUEENS · BIN 4623451
💬 Discuss this project
2022Year Built
2.5Stories
A1Building Class
R2AZoning
2,200 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · Owner of record: BRIGHT POINT REALTY LLC · 4,489 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Roof2p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
1 job · most recent 02/23/2022
General Wiring
FiledStatusContractorScope
02/23/2022CompleteA.C. MORGAN ELECTRICGeneral Wiring
Building Lifecycle
All (55)Filed (6)Permit Issued (8)Signed Off (3)Violation (2)Inspection (6)Special Inspection (30)
08/04/2025
Signed off — Alteration
FILED PLUMBING WORK FOR A 1 FAMILY HOUSE IN CONJUNCTION WITH NB JOB #440656942
Q00475479-I1
07/09/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
07/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
07/09/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
07/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
07/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
07/09/2025
Special inspection requirement — Maintenance information
DEZHANG FANG
07/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
07/08/2025
Filed — Alteration
FILED PLUMBING WORK FOR A 1 FAMILY HOUSE IN CONJUNCTION WITH NB JOB #440656942
Q00475479-P3
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
07/07/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
07/07/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
07/07/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
07/07/2025
Special inspection requirement — Maintenance information
DEZHANG FANG
07/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
07/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
07/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
06/09/2025
Signed off — Alteration
INSTALL 8' LONG NEW CURB CUT & 18' LONG NEW PAIRED CURB CUT FOR A 2-STORY 1-FAMILY BUILDING. FILED IN CONJUNCTION WITH NB JOB #440656942.
Q00572192-I1
06/04/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/06/2025
Permit issued — Curb Cut
Q00572192-I1-CC
05/05/2025
Signed off — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH NB JOB #440656942.
Q00570412-I1
02/25/2025
Permit issued — Plumbing
Q00475479-I1-PL
07/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/18/2024
Filed — Alteration
FILED PLUMBING WORK FOR A 1 FAMILY HOUSE IN CONJUNCTION WITH NB JOB #440656942
Q00475479-P2
01/31/2024
Permit issued — Plumbing
Q00475479-I1-PL
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
12/19/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
12/19/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/19/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/19/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
12/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
12/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
12/19/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
12/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
09/01/2023
Permit issued — Construction Fence
Q00570412-I1-FN
01/31/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/18/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/13/2023
Permit issued — Plumbing
Q00475479-I1-PL
12/02/2022
Violation issued (ECB, closed)
Construction
09/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2022
Inspection — Pass-Final House Connection
Pass
View inspection ↗
05/05/2022
Permit issued — Plumbing
Q00475479-I1-PL
11/30/2021
Violation issued (ECB, closed)
Construction
11/15/2021
Permit issued — Construction Fence
Q00570412-I1-FN
08/11/2021
Filed — Alteration
INSTALL 8' LONG NEW CURB CUT & 18' LONG NEW PAIRED CURB CUT FOR A 2-STORY 1-FAMILY BUILDING. FILED IN CONJUNCTION WITH NB JOB #440656942.
Q00572192-I1
08/11/2021
Permit issued — Construction Fence
Q00570412-I1-FN
08/09/2021
Filed — Alteration
FILED PLUMBING WORK FOR A 1 FAMILY HOUSE IN CONJUNCTION WITH NB JOB #440656942
Q00475479-P1
08/04/2021
Filed — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH NB JOB #440656942.
Q00570412-I1
05/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
05/24/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
05/24/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
05/04/2021
Filed — Alteration
FILED PLUMBING WORK FOR A 1 FAMILY HOUSE IN CONJUNCTION WITH NB JOB #440656942
Q00475479-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PAN LINK CONSTRUCTION103/22/2026
ACER CONSTRUCTION103/22/2026
BRIGHT POINT REALTY503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGT ARCHITECTURE P.C.207/08/2025
ALPHA HOME DESIGN LLC106/18/2024
FANG ARCHITECT308/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FANG ARCHITECT303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor407/08/2026
RRP PLUMBING CORPPlumbing407/08/2026
HOME STYLE IMPROVEMENTS *General Contractor303/21/2026
PAN LINK CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513407/08/2025
TRIANGLE INSPECTION & TES7495407/08/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offHOME STYLE IMPROVEMENTS *05/06/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP02/25/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP01/31/2024
DOB NOWConstruction FenceSigned-offPAN LINK CONSTRUCTION INC09/01/2023
DOB NOWPlumbingSigned-offRRP PLUMBING CORP01/13/2023
DOB NOWPlumbingSigned-offRRP PLUMBING CORP05/05/2022
DOB NOWConstruction FenceSigned-offACER CONSTRUCTION INC11/15/2021
DOB NOWConstruction FenceSigned-offACER CONSTRUCTION INC08/11/2021
BIS—ISSUEDPAN LINK CONSTRUCTION INC10/24/2024
BIS—ISSUEDPAN LINK CONSTRUCTION INC02/07/2024
BIS—ISSUEDPAN LINK CONSTRUCTION INC10/26/2023
BIS—ISSUEDPAN LINK CONSTRUCTION INC08/31/2023
BIS—ISSUEDPAN LINK CONSTRUCTION INC10/12/2022
BIS—ISSUEDPAN LINK CONSTRUCTION INC10/12/2022
BIS—ISSUEDACER CONSTRUCTION INC11/13/2021
BIS—ISSUEDACER CONSTRUCTION INC11/13/2021
BIS—ISSUEDACER CONSTRUCTION INC08/25/2021
BIS—ISSUEDACER CONSTRUCTION INC08/20/2021
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/04/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/31/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2022Pass-Final House ConnectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
07/09/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/09/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
07/09/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
07/09/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
07/09/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
07/09/2025HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
07/09/2025HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
07/09/2025Maintenance informationDEZHANG FANGenergy_progress
07/09/2025HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
07/07/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
07/07/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
07/07/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
07/07/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/07/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
07/07/2025Maintenance informationDEZHANG FANGenergy_progress
07/07/2025HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
07/07/2025HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
07/07/2025HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
12/19/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
12/19/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
12/19/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
12/19/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/19/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
12/19/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
12/19/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
Latest 25 of 36.
▾Documents — 161 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing4
08/27/2026Q00475479-I1Request digital key ↗
08/27/2026Q00475479-P3Request digital key ↗
08/15/2026Q00475479-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch2
08/27/2026Q00570412-I1Request digital key ↗
08/27/2026Q00572192-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/11/2021440678606Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/28/2025440656942Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM3
07/23/2021440656942Open ↗
07/23/2021440656942Open ↗
07/23/2021440656942Open ↗
▸DOB NOWRestrictive Declaration/Easement 13
08/27/2026Q00475479-I1Open ↗
08/27/2026Q00475479-P2Open ↗
08/13/2026Q00475479-P3Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
08/11/2021440678606Open ↗
02/09/2021440656942Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/23/2021440656942Open ↗
▸BISVERIFY TAX LOT1
06/09/2025440656942Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature20
08/25/2026Q00475479-P3Open ↗
08/25/2026Q00475479-P3Open ↗
08/25/2026Q00475479-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/25/2026Q00475479-P3Open ↗
08/25/2026Q00475479-P3Open ↗
08/25/2026Q00475479-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00475479-I1Open ↗
08/27/2026Q00570412-I1Open ↗
08/13/2026Q00475479-P1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/11/2021440678606Open ↗
02/09/2021440656942Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/29/2021440656942Open ↗
09/29/2021440656942Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/11/2021440678606Open ↗
▸Trade Schedules & Equipment7
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
11/19/2025440656942Open ↗
07/23/2021440656942Open ↗
▸BISHEATING SYSTEMS1
06/09/2025440656942Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/17/2025440656942Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/17/2025440656942Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
04/13/2021440656942Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
07/23/2021440656942Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE SUPPORTING DOCUMENT3
08/04/2025440678606Open ↗
08/04/2025440678606Open ↗
08/27/2021440678606Open ↗
▸BISSTREET TREE CHECKLIST3
08/27/2021440678606Open ↗
08/27/2021440678606Open ↗
08/27/2021440678606Open ↗
▸BISSTREET TREES SITE PLAN1
07/28/2025440678606Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
06/09/2025440656942Open ↗
▸Energy Compliance11
▸BISFENESTRATION AIR LEAKAGE1
07/17/2025440656942Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/17/2025440656942Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
04/13/2021440656942Open ↗
▸BISINTERIOR LIGHTING POWER1
07/17/2025440656942Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/17/2025440656942Open ↗
▸BISFENESTRATION AREAS1
07/17/2025440656942Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/17/2025440656942Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/23/2021440656942Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/17/2025440656942Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/17/2025440656942Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00475479-I1Open ↗
▸Inspections & Test Reports17
▸DOB NOWSOIL REPORT4
08/27/2026Q00475479-I1Open ↗
08/27/2026Q00475479-P2Open ↗
08/27/2026Q00475479-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/23/2021440656942Open ↗
07/23/2021440656942Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
07/17/2025440656942Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
06/09/2025440656942Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
10/09/2025440656942Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
10/09/2025440656942Open ↗
▸BISBPP: FIELD INSPECTION1
08/04/2025440678606Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/09/2025440656942Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/09/2025440656942Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
06/09/2025440656942Open ↗
▸BISMASONRY1
06/09/2025440656942Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
06/09/2025440656942Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00475479-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE5
09/12/2025440656942Open ↗
05/23/2025440656942Open ↗
05/27/2021440656942Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/04/2025440678606Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/19/2025440656942Open ↗
▸BISSUPERSEDING LETTER1
12/01/2022440656942Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
12/01/2022440656942Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION5
11/19/2025440656942Open ↗
01/31/2022440656942Open ↗
09/13/2021440678606Open ↗
Showing 3 of 5 on file for this type
▸Other Documents17
▸BISBPP - SUPPORTING DOCUMENTATION5
08/04/2025440678606Open ↗
08/04/2025440678606Open ↗
09/13/2021440678606Open ↗
Showing 3 of 5 on file for this type
▸BISST SITE PLAN APPROVED BY DPR1
08/27/2021440678606Open ↗
▸BISDOB APPROVED CC PLANS1
08/27/2021440678606Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
07/17/2025440656942Open ↗
▸BISSHUTOFF DAMPERS1
07/17/2025440656942Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/09/2021440656942Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
08/04/2025440678606Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/27/2021440678606Open ↗
▸BISMAINTENANCE INFORMATION1
07/17/2025440656942Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
07/17/2025440656942Open ↗
▸BISPERMANENT CERTIFICATE1
07/17/2025440656942Open ↗
▸BISBPP: FILING REQUIRED1
07/23/2021440656942Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
08/04/2025440678606Open ↗