← Back
Two stories - detached, small or mid-size
77-21 KEW FOREST LANE
QUEENS · BIN 4623495
💬 Discuss this project
2021Year Built
2Stories
A1Building Class
R2Zoning
2,414 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,400 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof2p · 1 filing · 20 docs
Cellar3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
N/A212/12/2022
FLUSHING ENGINEERING SERVICE PC209/19/2022
1+1 DESIGN STUDIO LLC109/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FIRE BUILDING CODE SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPH WEINSTEIN ELECTRIC 000796General Contractor303/22/2026
ALL PRO PLBG & HTG INCFire Protection207/08/2026
KY FUElectrical103/21/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495412/12/2022
BRIAN E. FLYNN, PE, PC2837209/19/2022
Building Lifecycle
All (41)Filed (5)Permit Issued (3)Signed Off (3)Violation (5)Objection (6)Special Inspection (19)
05/10/2023
Signed off — Alteration
Installation of Sprinkler system throughout building filed in conjunction with NB Application 421912498. Watermain filed under NB application.
Q00341463-I1
04/04/2023
Signed off — Alteration
NEW FIXTURES WITH ASSOCIATED PIPING THROUGHOUT NEW BUILDING. NEW DRYWELLS AND AREA DRAINS WITH ASSOCIATED PIPING. NO OCCUPANCY DURING CONSTRUCTION.
Q00290823-I1
02/22/2023
Signed off — Alteration
Q00219105-I1
12/20/2022
Special inspection requirement — Sprinkler Systems
Rajasekhar Sakhamuri
12/15/2022
Objection raised — Admin
12/15/2022
Objection resolved — Addressed
12/12/2022
Filed — Alteration
Installation of Sprinkler system throughout building filed in conjunction with NB Application 421912498. Watermain filed under NB application.
Q00341463-P1
09/25/2022
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
09/25/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
09/25/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN FLYNN
09/25/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
09/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
09/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
09/25/2022
Special inspection requirement — HVAC insulation and sealing
Rajasekhar Sakhamuri
09/25/2022
Special inspection requirement — HVAC and service water heating system controls
Rajasekhar Sakhamuri
09/25/2022
Special inspection requirement — HVAC and service water heating equipment
Rajasekhar Sakhamuri
09/19/2022
Filed — Alteration
NEW FIXTURES WITH ASSOCIATED PIPING THROUGHOUT NEW BUILDING. NEW DRYWELLS AND AREA DRAINS WITH ASSOCIATED PIPING. NO OCCUPANCY DURING CONSTRUCTION.
Q00290823-P1
09/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
09/16/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN FLYNN
09/16/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
09/16/2022
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
09/16/2022
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
09/16/2022
Special inspection requirement — HVAC insulation and sealing
Rajasekhar Sakhamuri
09/16/2022
Special inspection requirement — HVAC and service water heating equipment
Rajasekhar Sakhamuri
09/16/2022
Special inspection requirement — HVAC and service water heating system controls
Rajasekhar Sakhamuri
09/16/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
09/07/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/07/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2022
Permit issued — Sprinklers
Q00341463-I1-EW-SP
08/24/2022
Permit issued — Plumbing
Q00290823-I1-PL
04/23/2021
Violation issued (ECB, closed)
Construction
04/23/2021
Violation issued (ECB, closed)
Construction
03/03/2021
Permit issued — Sprinklers
Q00341463-I1-EW-SP
10/14/2020
Objection raised — Structural
10/14/2020
Objection resolved — Addressed
10/14/2020
Objection raised — Structural
10/14/2020
Objection resolved — Addressed
10/12/2020
Filed — Alteration
Installation of Sprinkler system throughout building filed in conjunction with NB Application 421912498. Watermain filed under NB application.
Q00341463-I1
03/23/2020
Filed — Alteration
NEW FIXTURES WITH ASSOCIATED PIPING THROUGHOUT NEW BUILDING. NEW DRYWELLS AND AREA DRAINS WITH ASSOCIATED PIPING. NO OCCUPANCY DURING CONSTRUCTION.
Q00290823-I1
09/25/2019
Filed — Alteration
Q00219105-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC08/24/2022
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC08/24/2022
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC03/03/2021
BIS—ISSUEDNEFCO ENTERPRISES INC03/13/2023
BIS—ISSUEDQUICK FIX UP HOME IMPROVE07/05/2022
BIS—ISSUEDQUICK FIX UP HOME IMPROVE12/22/2021
BIS—ISSUEDQUICK FIX UP HOME IMPROVE08/23/2021
BIS—ISSUEDRAMANAND CHANDRABALI11/16/2020
BIS—ISSUEDRAMANAND CHANDRABALI10/05/2020
2 projects · most recent 12/10/2020
General Wiring
FiledStatusContractorScope
12/10/2020CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
10/24/2019CompleteJOSEPH WEINSTEIN ELECTRIC1 meters
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
12/20/2022Sprinkler SystemsRajasekhar Sakhamurispecial
09/25/2022Maintenance informationRajasekhar Sakhamurienergy_progress
09/25/2022Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
09/25/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN FLYNNspecial
09/25/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRajasekhar Sakhamurispecial
09/25/2022Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
09/25/2022Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
09/25/2022HVAC insulation and sealing Rajasekhar Sakhamurienergy_progress
09/25/2022HVAC and service water heating system controls Rajasekhar Sakhamurienergy_progress
09/25/2022HVAC and service water heating equipment Rajasekhar Sakhamurienergy_progress
09/16/2022Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
09/16/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN FLYNNspecial
09/16/2022Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
09/16/2022Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
09/16/2022Maintenance informationRajasekhar Sakhamurienergy_progress
09/16/2022HVAC insulation and sealing Rajasekhar Sakhamurienergy_progress
09/16/2022HVAC and service water heating equipment Rajasekhar Sakhamurienergy_progress
09/16/2022HVAC and service water heating system controls Rajasekhar Sakhamurienergy_progress
09/16/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRajasekhar Sakhamurispecial
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Sprinkler2
08/15/2026Q00341463-P1Request digital key ↗
08/14/2026Q00341463-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026Q00290823-I1Request digital key ↗
08/25/2026Q00290823-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00219105-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION7
10/17/2023421912498Open ↗
10/06/2023421912498Open ↗
09/19/2022421943259Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION4
07/27/2023421912498Open ↗
08/24/2022421912498Open ↗
11/25/2020421912498Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/23/2022421943259Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
09/19/2023421912498Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/19/2023421912498Open ↗
▸BISZONING DIAGRAM1
04/20/2020421912498Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature10
08/26/2026Q00290823-I1Open ↗
08/26/2026Q00290823-I1Open ↗
08/26/2026Q00290823-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/26/2026Q00290823-I1Open ↗
08/26/2026Q00290823-I1Open ↗
08/26/2026Q00290823-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026Q00219105-I1Open ↗
08/25/2026Q00290823-P1Open ↗
08/25/2026Q00290823-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/29/2020421912498Open ↗
03/13/2020421912498Open ↗
▸Trade Schedules & Equipment5
▸BIS* SEWER CONNECTION: DEP SD1 & SD22
09/20/2023421912498Open ↗
04/20/2020421912498Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/10/2023421912498Open ↗
▸BISSPRINKLER SYSTEM1
09/20/2023421912498Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/10/2023421912498Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
09/14/2023421943259Open ↗
06/10/2020421943259Open ↗
03/13/2020421912498Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/29/2020421912498Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/20/2022421912498Open ↗
09/21/2020421912498Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/29/2020421912498Open ↗
03/13/2020421912498Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/10/2023421912498Open ↗
▸BISINTERIOR LIGHTING POWER1
05/10/2023421912498Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
05/10/2023421912498Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/10/2023421912498Open ↗
▸BISFENESTRATION AREAS1
05/10/2023421912498Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/18/2023421912498Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/10/2023421912498Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/02/2023421912498Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/10/2023421912498Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
05/10/2023421912498Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/20/2022421912498Open ↗
09/21/2020421912498Open ↗
04/20/2020421912498Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026Q00290823-P1Open ↗
08/13/2026Q00290823-I1Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/08/2023421912498Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
05/02/2023421912498Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/02/2023421912498Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/02/2023421912498Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/02/2023421912498Open ↗
▸BISMASONRY1
05/02/2023421912498Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
05/02/2023421912498Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
09/05/2023421912498Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
05/02/2023421912498Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
05/02/2023421912498Open ↗
▸BISSOIL REPORT1
04/20/2020421912498Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
05/02/2023421912498Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/29/2020421912498Open ↗
▸BISMECHANICAL SYSTEMS1
05/02/2023421912498Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
10/29/2020421912498Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00290823-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/12/2020421943259Open ↗
06/12/2020421943259Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
10/17/2023421912498Open ↗
04/20/2020421912498Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/12/2020421943259Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
07/27/2023421912498Open ↗
08/24/2022421912498Open ↗
10/29/2020421912498Open ↗
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM4
07/27/2023421912498Open ↗
08/24/2022421912498Open ↗
10/29/2020421912498Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
09/21/2020421912498Open ↗
09/02/2020421912498Open ↗
06/12/2020421943259Open ↗
▸BISEFILING COVER SHEET2
03/20/2020421943259Open ↗
03/13/2020421912498Open ↗
▸Other Documents15
▸BISUnknown3
10/07/2021421912498Open ↗
10/07/2021421912498Open ↗
10/07/2021421912498Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
04/20/2020421912498Open ↗
04/20/2020421912498Open ↗
▸BISSHUTOFF DAMPERS1
05/10/2023421912498Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
04/20/2020421912498Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/12/2020421943259Open ↗
▸BISRELOCATION OF FIRE HYDRANT ON THE EXISTING DRIVEWAY1
09/15/2023421943259Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
05/02/2023421912498Open ↗
▸BISMAINTENANCE INFORMATION1
05/10/2023421912498Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/10/2020421943259Open ↗
▸BISPERMANENT CERTIFICATE1
05/10/2023421912498Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
05/10/2023421912498Open ↗
▸BISPLOT DIAGRAM1
03/13/2020421912498Open ↗