← Back
Three families
61-37 166 STREET
QUEENS · BIN 4623814
💬 Discuss this project
2022Year Built
—Stories
C0Building Class
R4Zoning
2,699 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · Owner of record: 6137 HOLDING LLC · 3,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Floor 31p · 1 filing · 5 docs
Floor 21p · 1 filing · 5 docs
Floor 1
Cellar1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LUSSO CONTRACTING1607/08/2026
6137 HOLDING LLC103/22/2026
A S BUILDERS403/21/2026
A S HOME BUILDERS403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/14/2023$562K—— → —$208/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK PETRUSO ARCHITECT PC407/27/2022
VATCHE GHAZARIAN, PE206/14/2021
A & T ENGINEERING, P.C.101/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK PETRUSORA AOL COM803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D & G PLUMBING CO. INCPlumbing207/08/2026
NELSON & TOM MAINT INC DBElectrical103/22/2026
RRP PLUMBING CORPFire Protection107/08/2026
ALL STATE 12 GENERAL CONTRACTINGGeneral Contractor107/08/2026
LUSSO CONTRACTING CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519207/27/2022
FRANK PETRUSO ARCHITECT,P993104/13/2021
Building Lifecycle
All (39)Filed (7)Permit Issued (5)Signed Off (5)Violation (3)Inspection (8)Special Inspection (11)
05/11/2026
Violation issued (HPD, closed)
A
06/16/2025
Violation issued (HPD, closed)
A
12/02/2024
Violation issued (HPD, closed)
I
10/25/2022
Signed off — Alteration
Q00500503-I1
10/20/2022
Signed off — Alteration
INSTALL PLUMBING AND SPRINKER SYSTEM
Q00499649-I1
08/12/2022
Signed off — Alteration
Q00474884-I1
08/11/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/10/2022
Permit issued — Curb Cut
Q00474884-I1-CC
07/27/2022
Filed — Alteration
INSTALL PLUMBING AND SPRINKER SYSTEM
Q00499649-P1
07/26/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/22/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/19/2022
Signed off — Alteration
THIS JOB IS FILED FOR CONSTRUCTION FENCE FOR DEMOLITION WORK AT 61-37 166 STREET, QUEENS, NY 11365.
Q00453972-I1
05/03/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/16/2022
Permit issued — Plumbing
Q00499649-I1-EW-SP
03/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/25/2022
Permit issued — Plumbing
Q00499649-I1-PL
01/21/2022
Signed off — Alteration
EREWITH FILED FOR EXCAVATION SLOPING/BERMING/BENCHING IN CONJUNCTION WITH JOB NO. 440654506 NEW LOT NUMBER 13 AND DOB JOB NO. Q00508484. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00508729-I1
12/26/2021
Permit issued — Construction Fence
Q00453972-I1-FN
08/17/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/11/2021
Permit issued — Plumbing
Q00499649-I1-PL
06/16/2021
Special inspection requirement — Final
Vatche Ghazarian
06/14/2021
Filed — Alteration
EREWITH FILED FOR EXCAVATION SLOPING/BERMING/BENCHING IN CONJUNCTION WITH JOB NO. 440654506 NEW LOT NUMBER 13 AND DOB JOB NO. Q00508484. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00508729-P1
04/24/2021
Filed — Alteration
EREWITH FILED FOR EXCAVATION SLOPING/BERMING/BENCHING IN CONJUNCTION WITH JOB NO. 440654506 NEW LOT NUMBER 13 AND DOB JOB NO. Q00508484. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00508729-I1
04/13/2021
Filed — Alteration
Q00500503-I1
04/08/2021
Filed — Alteration
INSTALL PLUMBING AND SPRINKER SYSTEM
Q00499649-I1
04/08/2021
Special inspection requirement — Masonry
Frank Petruso
04/08/2021
Special inspection requirement — Structural Cold-Formed Steel
Frank Petruso
04/08/2021
Special inspection requirement — Structural Steel - Details
Frank Petruso
04/08/2021
Special inspection requirement — Concrete - Cast-In-Place
Frank Petruso
04/08/2021
Special inspection requirement — Mechanical Systems
Frank Petruso
04/08/2021
Special inspection requirement — Heating Systems
Frank Petruso
04/08/2021
Special inspection requirement — Final
Frank Petruso
04/08/2021
Special inspection requirement — Footing and Foundation
Frank Petruso
04/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Petruso
03/09/2021
Filed — Alteration
Q00474884-I1
01/15/2021
Filed — Alteration
THIS JOB IS FILED FOR CONSTRUCTION FENCE FOR DEMOLITION WORK AT 61-37 166 STREET, QUEENS, NY 11365.
Q00453972-I1
01/14/2021
Special inspection requirement — Final
ROBERT LIN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offLUSSO CONTRACTING CORP08/10/2022
DOB NOWPlumbingSigned-offRALPH W. LANDOLFI JR.03/16/2022
DOB NOWPlumbingSigned-offD & G PLUMBING CO. INC01/25/2022
DOB NOWConstruction FenceSigned-offALL STATE 12 GENERAL CONT12/26/2021
DOB NOWPlumbingSigned-offD & G PLUMBING CO. INC08/11/2021
BIS—ISSUEDLUSSO CONTRACTING CORP06/17/2022
1 job · most recent 06/28/2022
General Wiring
FiledStatusContractorScope
06/28/2022CompleteNELSON & TOM MAINT INC DBGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/11/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
07/26/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/03/2022Pass-Final PL - UndergroundPassView ↗
03/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2022Pass-Final PL - UndergroundPassView ↗
08/17/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/16/2021FinalVatche Ghazarianprogress
04/08/2021MasonryFrank Petrusospecial
04/08/2021Structural Cold-Formed SteelFrank Petrusospecial
04/08/2021Structural Steel - DetailsFrank Petrusospecial
04/08/2021Concrete - Cast-In-PlaceFrank Petrusospecial
04/08/2021Mechanical SystemsFrank Petrusospecial
04/08/2021Heating SystemsFrank Petrusospecial
04/08/2021FinalFrank Petrusoprogress
04/08/2021Footing and FoundationFrank Petrusoprogress
04/08/2021Fire-Resistant Penetrations and JointsFrank Petrusospecial
01/14/2021FinalROBERT LINprogress
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/27/2026Q00499649-I1Request digital key ↗
08/27/2026Q00499649-P1Request digital key ↗
08/27/2026Q00500503-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026Q00474884-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00453972-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
07/07/2022440654506Open ↗
06/23/2022440668476Open ↗
03/12/2021440668476Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
06/14/2022440668476Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/05/2022440654506Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/29/2020440654506Open ↗
▸BISVERIFY TAX LOT1
12/08/2022440654506Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/06/2022440654506Open ↗
▸BISZONING DIAGRAM1
04/07/2021440654506Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00453972-I1Open ↗
08/27/2026Q00474884-I1Open ↗
08/27/2026Q00499649-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026Q00453972-I1Open ↗
08/24/2026Q00500503-I1Open ↗
08/23/2026Q00508729-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/12/2021440668476Open ↗
12/29/2020440654506Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
03/12/2021440668476Open ↗
12/29/2020440654506Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/13/2021440654506Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q00500503-I1Open ↗
▸Trade Schedules & Equipment5
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
10/10/2022440654506Open ↗
04/07/2021440654506Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/08/2022440654506Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/08/2022440654506Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
04/07/2021440654506Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREES SITE PLAN3
09/06/2022440654506Open ↗
08/16/2022440668476Open ↗
08/16/2022440668476Open ↗
▸BISSTREET TREE CHECKLIST2
04/07/2021440654506Open ↗
03/25/2021440668476Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/10/2021440654506Open ↗
▸BISSTREET TREE SIGNOFF1
09/06/2022440654506Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/02/2022440654506Open ↗
06/10/2021440654506Open ↗
04/07/2021440654506Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/08/2022440654506Open ↗
▸BISFENESTRATION AREAS1
12/08/2022440654506Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/08/2022440654506Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/08/2022440654506Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/08/2022440654506Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/08/2022440654506Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/13/2021440654506Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/29/2020440654506Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/08/2022440654506Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/06/2022440654506Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00499649-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/05/2021440654506Open ↗
06/10/2021440654506Open ↗
12/29/2020440654506Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
09/14/2022440654506Open ↗
06/10/2021440654506Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/13/2021440654506Open ↗
06/10/2021440654506Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/08/2022440654506Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/08/2022440654506Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/08/2022440654506Open ↗
▸BISSOIL REPORT1
12/29/2020440654506Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/10/2021440654506Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/29/2020440654506Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
07/13/2021440654506Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
09/19/2022440654506Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/20/2022440654506Open ↗
06/14/2022440668476Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/14/2022440668476Open ↗
04/07/2021440654506Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
12/29/2020440654506Open ↗
▸BISCURB CUT (CC) SIGNOFF1
08/16/2022440668476Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/13/2021440654506Open ↗
06/14/2021440654506Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
08/17/2022440668476Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
07/25/2022440654506Open ↗
04/07/2021440654506Open ↗
04/07/2021440654506Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
03/12/2021440668476Open ↗
12/29/2020440654506Open ↗
▸Other Documents17
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
07/13/2021440654506Open ↗
06/16/2021440654506Open ↗
06/10/2021440654506Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION2
12/08/2022440654506Open ↗
12/08/2022440654506Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00508729-I1Open ↗
08/13/2026Q00500503-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
04/07/2021440654506Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/25/2021440668476Open ↗
▸BISWOOD - INSTALLATION OF PREFABRICATED I-JOISTS1
12/08/2022440654506Open ↗
▸BISMAINTENANCE INFORMATION1
12/08/2022440654506Open ↗
▸BISPERMANENT CERTIFICATE1
12/08/2022440654506Open ↗
▸BISBPP-PARKS: REMOVE MATURE TREE1
06/14/2022440668476Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
08/05/2021440654506Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
12/08/2022440654506Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
06/14/2022440668476Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
12/08/2022440654506Open ↗