Two stories - detached, small or mid-size
21-40 HAZEN STREET
QUEENS · BIN 4623973
💬 Discuss this project
2022Year Built
2Stories
A1Building Class
R4Zoning
3,511 sfGross Floor Area
1Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
1 job · most recent 09/19/2024
FiledStatusContractorScope
09/19/2024Signed-offALL PRO PLBG & HTG INC48 heads
1 job · most recent 09/19/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/19/2024Signed-offALL PRO PLBG & HTG INCGas, Storm, Water/Sanitary
4 jobs · most recent 04/04/2024
General Wiring
FiledStatusContractorScope
04/04/2024CancelledK.A.B. ELECTRIC CORPGeneral Wiring
04/03/2024CompleteBERGER QUALITY ELEC'L CON1 meters
12/17/2023CompleteBERGER QUALITY ELEC'L CON—
09/14/2021CompleteK.A.B. ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (79)Filed (6)Permit Issued (6)Signed Off (2)Violation (4)Inspection (7)Objection (26)Special Inspection (28)
07/23/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/17/2025
Signed off — Alteration
Q00423081-I1
10/03/2024
Special inspection requirement — HVAC insulation and sealing
SEBERT DYER
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
10/03/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/03/2024
Special inspection requirement — Sprinkler Systems
Warren Gordon
10/03/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SEBERT DYER
10/03/2024
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
10/03/2024
Special inspection requirement — HVAC and service water heating equipment
SEBERT DYER
10/03/2024
Special inspection requirement — Maintenance information
SEBERT DYER
10/03/2024
Special inspection requirement — HVAC and service water heating system controls
SEBERT DYER
09/26/2024
Objection resolved — Addressed
09/25/2024
Objection raised — Other
09/19/2024
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING AND SPRINKLER WORK FOR A NEW ONE FAMILY DWELLING IN CONJUNCTION WITH NB #440610046
Q00443924-P2
09/18/2024
Special inspection requirement — HVAC and service water heating equipment
SEBERT DYER
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
09/18/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SEBERT DYER
09/18/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
09/18/2024
Special inspection requirement — Sprinkler Systems
Warren Gordon
09/18/2024
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
09/18/2024
Special inspection requirement — HVAC insulation and sealing
SEBERT DYER
09/18/2024
Special inspection requirement — HVAC and service water heating system controls
SEBERT DYER
09/18/2024
Special inspection requirement — Maintenance information
SEBERT DYER
07/16/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/10/2024
Permit issued — Plumbing
Q00443924-I1-EW-SP
04/02/2024
Permit issued — Sprinklers
Q00443924-I1-PL
03/05/2024
Objection raised — Other
03/05/2024
Objection resolved — Addressed
03/05/2024
Objection raised — Inspections
03/05/2024
Objection resolved — Addressed
02/13/2024
Objection resolved — Addressed
02/13/2024
Objection resolved — Addressed
02/13/2024
Objection resolved — Addressed
02/13/2024
Objection resolved — Addressed
02/13/2024
Objection resolved — Addressed
02/08/2024
Objection raised — Scope
02/08/2024
Objection raised — Inspections
02/08/2024
Objection raised — Inspections
02/08/2024
Objection raised — Structural
02/08/2024
Objection raised — Fire_Protection
01/30/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/26/2024
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING AND SPRINKLER WORK FOR A NEW ONE FAMILY DWELLING IN CONJUNCTION WITH NB #440610046
Q00443924-P1
01/26/2024
Special inspection requirement — HVAC and service water heating equipment
SEBERT DYER
01/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
01/26/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SEBERT DYER
01/26/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
01/26/2024
Special inspection requirement — Sprinkler Systems
Warren Gordon
01/26/2024
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
01/26/2024
Special inspection requirement — HVAC and service water heating system controls
SEBERT DYER
01/26/2024
Special inspection requirement — Maintenance information
SEBERT DYER
01/26/2024
Special inspection requirement — HVAC insulation and sealing
SEBERT DYER
01/25/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/25/2022
Permit issued — Curb Cut
Q00423720-I1-CC
04/19/2022
Violation issued (ECB, closed)
Construction
03/31/2022
Violation issued (ECB, open)
Construction
01/13/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/07/2021
Permit issued — Sprinklers
Q00443924-I1-EW-SP
07/21/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 79 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MHM ENGINEERING, P.C.303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/12/2019$985K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M.S. SAVANI ARCHITECT, PC509/19/2024
MOHAMED MABROUK110/05/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCASTLE603/21/2026
FRANKLYN ESTRELLA ARCHITECT PLLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL PRO PLBG & HTG INCFire Protection207/08/2026
HELMSLEY GROUP INCGeneral Contractor207/08/2026
MHM ENGINEERING, P.CGeneral Contractor203/21/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL STATE PROPERTY INSPEC4288309/19/2024
TRIANGLE INSPECTION & TES7495309/19/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC07/10/2024
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC04/02/2024
DOB NOWCurb CutPermit IssuedHELMSLEY GROUP INC10/25/2022
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC12/07/2021
DOB NOWConstruction FenceSigned-offHELMSLEY GROUP INC07/02/2021
DOB NOWConstruction FenceSigned-offMHM ENGINEERING, P.C10/20/2020
BIS—ISSUEDMHM ENGINEERING, P.C02/14/2022
BIS—ISSUEDMHM ENGINEERING, P.C10/05/2021
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/23/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
07/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
10/03/2024HVAC insulation and sealing SEBERT DYERenergy_progress
10/03/2024Fire-Resistant Penetrations and JointsSEBERT DYERspecial
10/03/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/03/2024Sprinkler SystemsWarren Gordonspecial
10/03/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBERT DYERspecial
10/03/2024Energy Code Compliance InspectionsSEBERT DYERprogress
10/03/2024HVAC and service water heating equipment SEBERT DYERenergy_progress
10/03/2024Maintenance informationSEBERT DYERenergy_progress
10/03/2024HVAC and service water heating system controls SEBERT DYERenergy_progress
09/18/2024HVAC and service water heating equipment SEBERT DYERenergy_progress
09/18/2024Fire-Resistant Penetrations and JointsSEBERT DYERspecial
09/18/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBERT DYERspecial
09/18/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
09/18/2024Sprinkler SystemsWarren Gordonspecial
09/18/2024Energy Code Compliance InspectionsSEBERT DYERprogress
09/18/2024HVAC insulation and sealing SEBERT DYERenergy_progress
09/18/2024HVAC and service water heating system controls SEBERT DYERenergy_progress
09/18/2024Maintenance informationSEBERT DYERenergy_progress
01/26/2024HVAC and service water heating equipment SEBERT DYERenergy_progress
01/26/2024Fire-Resistant Penetrations and JointsSEBERT DYERspecial
01/26/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBERT DYERspecial
01/26/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
01/26/2024Sprinkler SystemsWarren Gordonspecial
01/26/2024Energy Code Compliance InspectionsSEBERT DYERprogress
01/26/2024HVAC and service water heating system controls SEBERT DYERenergy_progress
Latest 25 of 28.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing3
08/23/2026Q00443924-I1Request digital key ↗
08/15/2026Q00443924-P2Request digital key ↗
08/15/2026Q00443924-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/23/2026Q00443924-I1Request digital key ↗
08/15/2026Q00443924-P2Request digital key ↗
08/15/2026Q00443924-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/27/2026Q00423081-I1Request digital key ↗
08/14/2026Q00406762-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026Q00423720-I1Request digital key ↗
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION5
06/03/2025440610046Open ↗
04/14/2022440610046Open ↗
10/05/2021440610046Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
10/28/2025440645768Open ↗
12/07/2023440610046Open ↗
12/21/2020440645768Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
10/28/2022440645768Open ↗
12/07/2020440645768Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/17/2025440610046Open ↗
▸BISZONING DIAGRAM1
04/22/2021440610046Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature16
09/27/2026Q00443924-I1Open ↗
09/27/2026Q00443924-I1Open ↗
09/27/2026Q00443924-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/27/2026Q00443924-I1Open ↗
09/27/2026Q00443924-I1Open ↗
09/27/2026Q00443924-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00406762-I1Open ↗
08/27/2026Q00423081-I1Open ↗
08/23/2026Q00443924-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/07/2020440645768Open ↗
12/04/2020440610046Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
12/07/2020440645768Open ↗
12/04/2020440610046Open ↗
▸Trade Schedules & Equipment7
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)3
01/09/2024440610046Open ↗
01/09/2024440610046Open ↗
03/29/2021440610046Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/17/2025440610046Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/17/2025440610046Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
03/29/2021440610046Open ↗
▸BISHEATING SYSTEMS1
07/17/2025440610046Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
03/29/2021440610046Open ↗
12/23/2020440645768Open ↗
12/04/2020440610046Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/02/2021440610046Open ↗
▸BISSTREET TREES SITE PLAN1
01/09/2024440610046Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
07/17/2025440610046Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/18/2021440610046Open ↗
01/04/2021440610046Open ↗
12/04/2020440610046Open ↗
▸BISINTERIOR LIGHTING POWER1
07/17/2025440610046Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/17/2025440610046Open ↗
▸BISFENESTRATION AREAS1
07/17/2025440610046Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/17/2025440610046Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/17/2025440610046Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/17/2025440610046Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/14/2026440610046Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/04/2020440610046Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
07/17/2025440610046Open ↗
▸BISFENESTRATION AIR LEAKAGE1
07/17/2025440610046Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/17/2021440610046Open ↗
05/17/2021440610046Open ↗
05/17/2021440610046Open ↗
Showing 3 of 8 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
07/17/2025440610046Open ↗
05/19/2021440610046Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
05/19/2021440610046Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/17/2025440610046Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/17/2025440610046Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/17/2025440610046Open ↗
▸BISMASONRY1
07/17/2025440610046Open ↗
▸BISSOIL REPORT1
12/04/2020440610046Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
01/21/2026440610046Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
07/17/2025440610046Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/04/2020440610046Open ↗
▸BISMECHANICAL SYSTEMS1
07/17/2025440610046Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
07/17/2025440610046Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
11/17/2020440610046Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE5
04/14/2022440610046Open ↗
10/05/2021440610046Open ↗
07/29/2021440610046Open ↗
Showing 3 of 5 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
11/18/2021440610046Open ↗
06/07/2021440610046Open ↗
05/19/2021440610046Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
11/03/2025440645768Open ↗
01/09/2024440610046Open ↗
12/28/2023440610046Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
06/03/2025440610046Open ↗
12/17/2020440610046Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/07/2020440645768Open ↗
12/04/2020440610046Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/07/2020440645768Open ↗
▸BISEFILING COVER SHEET1
12/17/2020440610046Open ↗
▸Other Documents16
▸BISBPP - SUPPORTING DOCUMENTATION3
03/29/2021440610046Open ↗
12/23/2020440645768Open ↗
12/07/2020440645768Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
11/03/2025440645768Open ↗
03/11/2022440610046Open ↗
▸BISPLOT DIAGRAM2
04/22/2021440610046Open ↗
03/29/2021440610046Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/04/2020440610046Open ↗
▸BISMAINTENANCE INFORMATION1
07/17/2025440610046Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
07/17/2025440610046Open ↗
▸BISPERMANENT CERTIFICATE1
07/17/2025440610046Open ↗
▸BISBPP: FILING REQUIRED1
03/29/2021440610046Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
07/17/2025440610046Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/17/2025440610046Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
07/17/2025440610046Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
07/17/2025440610046Open ↗