← Back
QUEENS
70-11 GAR 266 STREET
QUEENS · BIN 4624054
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureCivil
Roof2p · 1 filing · 20 docs
Floor 11 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.303/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUSTOMBUILT HOMES INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781203/27/2025
Building Lifecycle
All (32)Filed (3)Permit Issued (1)Inspection (2)Objection (2)Special Inspection (24)
04/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2025
Special inspection requirement — Masonry
CHRISTIAN LOZADA
04/10/2025
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
04/10/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/10/2025
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
04/10/2025
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
04/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
04/10/2025
Special inspection requirement — Final
PETER CHO
04/10/2025
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
04/10/2025
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
04/10/2025
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
03/27/2025
Filed — New Building
PROPOSED NEW ENCLOSED ONE (1) CAR GARAGE.
Q00744004-P2
01/14/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/12/2024
Permit issued — Earth Work
Q00744004-I1-GC-CX
08/23/2023
Filed — New Building
PROPOSED NEW ENCLOSED ONE (1) CAR GARAGE.
Q00744004-P1
08/09/2023
Special inspection requirement — Concrete - Cast-In-Place
08/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/09/2023
Special inspection requirement — Masonry
08/09/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/09/2023
Special inspection requirement — Subgrade Inspections
08/09/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/09/2023
Special inspection requirement — Final
08/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
08/09/2023
Special inspection requirement — Footing and Foundation
08/09/2023
Special inspection requirement — Structural Wood Frame
08/09/2023
Special inspection requirement — Electric vehicle service equipment requirements
08/09/2023
Special inspection requirement — Interior lighting power
06/16/2022
Objection resolved — Addressed
05/27/2022
Objection raised — Scope
05/24/2022
Filed — New Building
PROPOSED NEW ENCLOSED ONE (1) CAR GARAGE.
Q00744004-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedCUSTOMBUILT HOMES INC09/12/2024
1 project · most recent 10/24/2024
General Wiring
FiledStatusContractorScope
10/24/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 03/27/2025
Masonry Wood
FiledStatusContractorScope
03/27/2025Permit IssuedCUSTOMBUILT HOMES INCMasonry, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/14/2025Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/10/2025MasonryCHRISTIAN LOZADAspecial
04/10/2025Subgrade InspectionsCHRISTIAN LOZADAspecial
04/10/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
04/10/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/10/2025Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
04/10/2025Structural Wood FrameCHRISTIAN LOZADAprogress
04/10/2025Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
04/10/2025FinalPETER CHOprogress
04/10/2025Footing and FoundationCHRISTIAN LOZADAprogress
04/10/2025Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
04/10/2025Interior lighting powerCHRISTIAN LOZADAenergy_progress
08/09/2023Concrete - Cast-In-Place—special
08/09/2023Fire-Resistant Penetrations and Joints—special
08/09/2023Masonry—special
08/09/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/09/2023Subgrade Inspections—special
08/09/2023Subsurface Investigations (Borings/Test Pits)—special
08/09/2023Final—progress
08/09/2023Fire-Resistance Rated Construction—progress
08/09/2023Footing and Foundation—progress
08/09/2023Structural Wood Frame—progress
08/09/2023Electric vehicle service equipment requirements—energy_progress
08/09/2023Interior lighting power—energy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q00744004-P1Request digital key ↗
08/20/2026Q00744004-P2Request digital key ↗
08/15/2026Q00744004-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00744004-P2Open ↗
08/13/2026Q00744004-I1Open ↗
08/13/2026Q00744004-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00744004-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q00744004-I1Open ↗
09/01/2026Q00744004-I1Open ↗
09/01/2026Q00744004-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q00744004-P1Open ↗
08/20/2026Q00744004-I1Open ↗
08/20/2026Q00744004-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00744004-I1Open ↗
09/01/2026Q00744004-I1Open ↗
09/01/2026Q00744004-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/20/2026Q00744004-P1Open ↗
08/20/2026Q00744004-P2Open ↗
08/15/2026Q00744004-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00744004-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q00744004-I1Open ↗
08/13/2026Q00744004-P1Open ↗
08/13/2026Q00744004-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00744004-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026Q00744004-I1Open ↗
08/13/2026Q00744004-P2Open ↗
08/13/2026Q00744004-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q00744004-P1Open ↗
08/20/2026Q00744004-P2Open ↗
08/15/2026Q00744004-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00744004-P2Open ↗
08/13/2026Q00744004-P1Open ↗
08/13/2026Q00744004-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00744004-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00744004-I1Open ↗