ECB03/06/2026OBSERVED:CONSTRUCTION SUPERINTENDENT WAZIR KHAN REGISTRATION 27464 FAILED TO PERFORM DUTIES .FOUND SITE WITH MULTIPLE UNSAFETY CONDITIONS LIKE WORK WITHOUT PERMIT ON FOUNDATION WALL, WORK NOT CONFORMING WITH A$5K due
ECB03/06/2026OBSERVED: ACTIVE SITE WITHOUT SSP, SOE AND FOUNDATIONS DRAWINGS ,NO OPTICAL MONITORING & VIBRATION INSPECTION REPORTS NO DOT PERMITS SUPER, ORIENTATION AND PRESHIFT LOG BOOKS ,CONTRARY TO BUILDING CODE STOP A$1K due
ECB03/06/2026OBSERVED ACTIVE SITE , UPON INSPECTION NOTED A GREAT AMOUNT ON MATERIAL DEBRIS IN DIFERENTS LOCATION , WOOD AND 2X4 AT CELLAR LEVEL STOP ALL WORK UNDER PERMIT Q00656479 / MAKE SITE SAFETY$3K due
ECB03/06/2026WORK WITHOUT A PERMIT. OBSERVED: ACTIVE SITE CP PRESENT AT TIME OF INSPECTION NOTED FOUNDATION WALLS DONE EXCEPT CORNER EXP 1 AND 2 UPON REVIEW ON BIS AND DOB NOW NO FOUNDATION PERMIT HAS BEEN OBTAINED, NEITHER$12K due
ECB03/06/2026OBSERVED: ACTIVE SITE CP PRESENT UPON INSPECTION NOTED INADEQUATELY FIRE EXTINGUISHERS NOT PER NYC FIRE CODE UNITS NOT MOUNTED, NOT FDNY SERVICE TAG, INADEQUATE SIZE ,ALSO NOT LABELED CONTRARY TO BC3303.7.2 P$3K due
ECB03/06/2026OBSERVED: NO PEDESTRIAN PROTECTION DURING CONCRETE OPERATIONS NO FLAG PERSON NO SIGNANGE , STOP ALL CONCRETE OPERATIONS UNDER JOB Q00656479 / PROVIDE FLAG PERSON AND ADEQUATE SIGNAGE DURING CONCRETE OPERATIONS$5K due
ECB03/06/2026OBSERVED: SOE WORK HAS BEEN DONE 85% APPROXIMATELY EXCEPT ON CORNER EXP1,2 , UPON REVIEW DRAWINGS NOTED MISSING WALLER AT EXP 1, RAKERS HAS BEEN INSTALLED WRONG WAY TURNED ON 90 DEGREES STOP ALL WORK FOR JO$3K due
ECB01/29/2026NEW COMMUNITY FACILITY BUILDING .OBSERVED SITE CLOSED NO ONGOING CONSTRUCTION ACTIVITY , UPON EXTERIOR INPECTION NOTED:SNOW NOT FULLY REMOVED AND ICE ON FRONT OF ENTIRE JOB SITE SIDEWALK CONTRARY TO CODE BBC330$5K due
ECB12/26/2025BC3301.13.5 ALTERNATE SUPER: DURING INSPECTION OF AN ACTIVE SITE I REQUESTED TO SEE THE SUPERINTENDENT AND THE COMPETENT PERSON, NEITHER ONE WAS ONSITE. THERE WAS NO ALTERNATIVE LICENSED OR CERTIFIED PERSON ONS$5K due
ECB06/03/2025GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39538910R ISSUED 04-09-25.$1K due
ECB04/09/2025DURING INSPECTION OF AN ACTIVE SITE AT SOE PHASE, I OBSERVED 5 WORKERS ONSITE, 4 STANDING ON TOP A WALL BRACED WITH WHALERS AND RAKERS, WITHOUT PPE FOR THEIR PROTECTION. I REQUESTED TO SEE THEIR SST. 1 WORKER D$10K due
ECB07/08/2026GENERAL CONTRACTOR FAILED TO FILE A CERTIFICATE OF CORRECTION WITH THE DOB FOR VIOLATION# 39551363N ISSUED 03/06/2026. NO CORRECTIVE MEASURES ON RECORD.Hearing held — result not yet published$1K proposed
ECB05/14/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.AT TIME OF INSPECTION,THE GENERAL CONTRACTOR FAILED TO FILE A CERTIFICATE OF CORRECTION FOR VHearing held — result not yet published$1K proposed