← Back
Two family brick
70-36 70TH STREET
QUEENS · BIN 4624326
💬 Discuss this project
2024Year Built
3Stories
B1Building Class
R4-1Zoning
2,617 sfGross Floor Area
2Units
0 Open Violations
Two family brick · Owner of record: FAIRMONT REALTY GROUP LLC · 2,971 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof1p · 1 filing · 12 docs
Floor 314p · 1 filing · 20 docs
Floor 215p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FAIRMONT REALTY GROUP103/22/2026
A S CONTRACTORS OF NY I103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.910/23/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & S CONTRACTORS OF NY IGeneral Contractor507/08/2026
M & M PIPING AND HEATINGPlumbing207/08/2026
TRINCITY ELECTRIC, INCElectrical103/22/2026
WATER WORKS PIPING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177610/23/2025
TRIANGLE INSPECTION & TES7495207/22/2025
Building Lifecycle
All (79)Filed (9)Permit Issued (7)Signed Off (4)Violation (2)Inspection (10)Objection (17)Special Inspection (30)
06/11/2026
Signed off — New Building
PROPOSED NEW THREE STORY TWO FAMILY MASONRY BUILDING WITH CELLAR
Q08041368-I1
03/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/22/2026
Signed off — Alteration
Application filed for Installation of Plumbing fixtures and sprinkler system with less than 30 heads and related pipings in conjunction with NB application # Q08041368.
Q08050003-I1
12/11/2025
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Final
NAVEEN KUMAR
12/11/2025
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Air barrier - visual inspection
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Insulation placement and R values
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Air barrier — testing
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Ventilation and air distribution system
PIROOZ SOLTANIZADEH
12/11/2025
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
10/23/2025
Filed — New Building
PROPOSED NEW THREE STORY TWO FAMILY MASONRY BUILDING WITH CELLAR
Q08041368-P4
10/22/2025
Signed off — Alteration
Q08041385-I1
10/22/2025
Signed off — New Building
PROPOSED NEW THREE STORY TWO FAMILY MASONRY BUILDING WITH CELLAR
Q08041368-S1
10/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/22/2025
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
10/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
10/22/2025
Special inspection requirement — Final
10/22/2025
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
10/22/2025
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
10/22/2025
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
10/22/2025
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
10/22/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
10/22/2025
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
10/14/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/14/2025
Permit issued — Plumbing
Q08050003-I1-PL
07/22/2025
Filed — Alteration
Application filed for Installation of Plumbing fixtures and sprinkler system with less than 30 heads and related pipings in conjunction with NB application # Q08041368.
Q08050003-P1
07/22/2025
Filed — New Building
PROPOSED NEW THREE STORY TWO FAMILY MASONRY BUILDING WITH CELLAR
Q08041368-P3
07/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/21/2025
Inspection — Pass-Final House Connection
Pass
View inspection ↗
03/19/2025
Permit issued — Plumbing
Q25188587-I1-PL
02/19/2025
Permit issued — Construction Fence
Q08041385-I1-FN
11/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2024
Violation issued (ECB, closed)
Unknown
08/07/2024
Permit issued — Plumbing
Q08050003-I1-PL
07/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2024
Violation issued (ECB, closed)
Construction
05/24/2024
Filed — New Building
PROPOSED NEW THREE STORY TWO FAMILY MASONRY BUILDING WITH CELLAR
Q08041368-P1
02/29/2024
Permit issued — General Construction
Q08041368-I1-GC-CX
02/21/2024
Permit issued — Curb Cut
Q08041368-S1-CC
01/24/2024
Permit issued — Construction Fence
Q08041385-I1-FN
11/14/2023
Objection resolved — Addressed
11/14/2023
Objection resolved — Addressed
11/13/2023
Objection raised — Scope
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING08/14/2025
DOB NOWPlumbingSigned-offSUPERIOR PIPING&MECH CORP03/19/2025
DOB NOWConstruction FenceSigned-offA S CONTRACTORS OF NY I02/19/2025
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING08/07/2024
DOB NOWGeneral ConstructionPermit IssuedA S CONTRACTORS OF NY I02/29/2024
DOB NOWCurb CutSigned-offA S CONTRACTORS OF NY I02/21/2024
DOB NOWConstruction FenceSigned-offA S CONTRACTORS OF NY I01/24/2024
1 project · most recent 07/01/2024
General Wiring
FiledStatusContractorScope
07/01/2024CompleteTRINCITY ELECTRIC, INCGeneral Wiring
1 project · most recent 10/23/2025
Concrete Masonry Wood
FiledStatusContractorScope
10/23/2025Permit IssuedA & S CONTRACTORS OF NY IConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/14/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/03/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/21/2025Pass-Final House ConnectionPassView ↗
11/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
12/11/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
12/11/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
12/11/2025Heating SystemsPIROOZ SOLTANIZADEHspecial
12/11/2025Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
12/11/2025Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
12/11/2025MasonryPIROOZ SOLTANIZADEHspecial
12/11/2025Mechanical SystemsPIROOZ SOLTANIZADEHspecial
12/11/2025FinalNAVEEN KUMARprogress
12/11/2025Footing and FoundationPIROOZ SOLTANIZADEHprogress
12/11/2025Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
12/11/2025HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
12/11/2025Air barrier - visual inspectionPIROOZ SOLTANIZADEHenergy_progress
12/11/2025Permanent certificatePIROOZ SOLTANIZADEHenergy_progress
12/11/2025HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
12/11/2025Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
12/11/2025HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
12/11/2025Fenestration air leakagePIROOZ SOLTANIZADEHenergy_progress
12/11/2025Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
12/11/2025Air barrier — testing PIROOZ SOLTANIZADEHenergy_progress
12/11/2025Ventilation and air distribution systemPIROOZ SOLTANIZADEHenergy_progress
10/22/2025Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
10/22/2025Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
10/22/2025Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
10/22/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
10/22/2025Heating SystemsPIROOZ SOLTANIZADEHspecial
Latest 25 of 78.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026Q08041385-I1Request digital key ↗
08/24/2026Q08041368-P1Request digital key ↗
08/24/2026Q08041368-P4Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation1
03/28/2025440762970Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/29/2022440762970Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
11/05/2025440762970Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q08041368-I1Open ↗
08/13/2026Q08041368-P4Open ↗
08/13/2026Q08041368-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08041368-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026Q08041368-I1Open ↗
09/02/2026Q08041368-I1Open ↗
09/02/2026Q08041368-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026Q08041368-P4Open ↗
08/24/2026Q08041368-P3Open ↗
08/24/2026Q08041368-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q08041368-I1Open ↗
08/29/2026Q08041368-P4Open ↗
08/28/2026Q08041368-P3Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/29/2022440762970Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/29/2022440762970Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q08041368-P1Open ↗
08/13/2026Q08041368-I1Open ↗
08/13/2026Q08041368-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist4
08/13/2026Q08041368-I1Open ↗
08/13/2026Q08041368-P4Open ↗
08/13/2026Q08041368-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off2
08/24/2026Q08041368-I1Open ↗
08/13/2026Q08041368-I1Open ↗
▸BISSTREET TREES SITE PLAN1
10/31/2025440762970Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/11/2023440762970Open ↗
▸BISSTREET TREE CHECKLIST1
01/11/2023440762970Open ↗
▸BISSTREET TREE SIGNOFF1
10/31/2025440762970Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08041368-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q08041368-I1Open ↗
▸Inspections & Test Reports2
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
11/05/2025440762970Open ↗
▸BISBPP: FIELD INSPECTION1
11/05/2025440762970Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/05/2025440762970Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
11/05/2025440762970Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/29/2022440762970Open ↗
▸BISADDITIONAL INFORMATION1
09/26/2023440762970Open ↗
▸Other Documents19
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q08041368-P1Open ↗
08/13/2026Q08041368-P3Open ↗
08/13/2026Q08041368-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026Q08041368-P4Open ↗
08/24/2026Q08041368-P3Open ↗
08/24/2026Q08041368-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q08041368-I1Open ↗
08/13/2026Q08041368-P4Open ↗
08/13/2026Q08041368-P3Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: TOPOGRAPHIC SURVEY1
01/11/2023440762970Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
11/05/2025440762970Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
11/05/2025440762970Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/11/2023440762970Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
11/05/2025440762970Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08041368-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08041368-I1Open ↗