← Back
QUEENS
266-07GAR 69 AVENUE
QUEENS · BIN 4624492
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
Structural
Floor 11 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BFS ARCHITECT PC408/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KNA CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAHARA CONTRACTING CORPGeneral Contractor304/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Z & T ENGINEERING, P.C.591208/05/2025
Building Lifecycle
All (38)Filed (3)Permit Issued (3)Violation (1)Inspection (1)Special Inspection (30)
10/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/15/2025
Permit issued — General Construction
Q08020525-I1-ST
10/15/2025
Permit issued — Structural
Q08020525-I1-FO
09/16/2025
Violation issued (ECB, closed)
Construction
08/21/2025
Permit issued — Structural
Q08020525-I1-GC
08/18/2025
Special inspection requirement — Subgrade Inspections
Fei Zeng
08/18/2025
Special inspection requirement — Wood – Seismic Resistance
Fei Zeng
08/18/2025
Special inspection requirement — Masonry
Fei Zeng
08/18/2025
Special inspection requirement — Concrete - Cast-In-Place
Fei Zeng
08/18/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Fei Zeng
08/18/2025
Special inspection requirement — Footing and Foundation
Fei Zeng
08/18/2025
Special inspection requirement — Final
Fei Zeng
08/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Fei Zeng
08/18/2025
Special inspection requirement — Structural Wood Frame
Fei Zeng
08/18/2025
Special inspection requirement — Permanent certificate
Fei Zeng
08/18/2025
Special inspection requirement — Air barrier - visual inspection
Fei Zeng
08/18/2025
Special inspection requirement — Air barrier — testing
Fei Zeng
08/18/2025
Special inspection requirement — Interior lighting power
Fei Zeng
08/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Fei Zeng
08/18/2025
Special inspection requirement — Electric vehicle service equipment requirements
Fei Zeng
08/18/2025
Special inspection requirement — Fenestration areas
Fei Zeng
08/18/2025
Special inspection requirement — Fenestration air leakage
Fei Zeng
08/18/2025
Special inspection requirement — Insulation placement and R values
Fei Zeng
08/05/2025
Filed — New Building
proposed one (1) car detached garage.
Q08020525-P2
08/05/2025
Special inspection requirement — Wood – Seismic Resistance
08/05/2025
Special inspection requirement — Concrete - Cast-In-Place
Fei Zeng
08/05/2025
Special inspection requirement — Masonry
Fei Zeng
08/05/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Fei Zeng
08/05/2025
Special inspection requirement — Subgrade Inspections
Fei Zeng
08/05/2025
Special inspection requirement — Final
Fei Zeng
08/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
Fei Zeng
08/05/2025
Special inspection requirement — Footing and Foundation
Fei Zeng
08/05/2025
Special inspection requirement — Structural Wood Frame
Fei Zeng
08/05/2025
Special inspection requirement — Permanent certificate
Fei Zeng
08/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Fei Zeng
08/05/2025
Special inspection requirement — Interior lighting power
Fei Zeng
06/14/2024
Filed — New Building
proposed one (1) car detached garage.
Q08020525-P1
10/27/2022
Filed — New Building
proposed one (1) car detached garage.
Q08020525-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSAHARA CONTRACTING CORP10/15/2025
DOB NOWStructuralSigned-offSAHARA CONTRACTING CORP10/15/2025
DOB NOWStructuralPermit IssuedSAHARA CONTRACTING CORP08/21/2025
2 projects · most recent 08/05/2025
Concrete Wood
FiledStatusContractorScope
08/05/2025Signed-offSAHARA CONTRACTING CORPConcrete, Wood
———2 scope_items
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/18/2025Subgrade InspectionsFei Zengspecial
08/18/2025Wood – Seismic ResistanceFei Zengspecial
08/18/2025MasonryFei Zengspecial
08/18/2025Concrete - Cast-In-PlaceFei Zengspecial
08/18/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFei Zengspecial
08/18/2025Footing and FoundationFei Zengprogress
08/18/2025FinalFei Zengprogress
08/18/2025Fire-Resistance Rated ConstructionFei Zengprogress
08/18/2025Structural Wood FrameFei Zengprogress
08/18/2025Permanent certificateFei Zengenergy_progress
08/18/2025Air barrier - visual inspectionFei Zengenergy_progress
08/18/2025Air barrier — testing Fei Zengenergy_progress
08/18/2025Interior lighting powerFei Zengenergy_progress
08/18/2025Fenestration and door U-factor and product ratingsFei Zengenergy_progress
08/18/2025Electric vehicle service equipment requirementsFei Zengenergy_progress
08/18/2025Fenestration areasFei Zengenergy_progress
08/18/2025Fenestration air leakageFei Zengenergy_progress
08/18/2025Insulation placement and R valuesFei Zengenergy_progress
08/05/2025Wood – Seismic Resistance—special
08/05/2025Concrete - Cast-In-PlaceFei Zengspecial
08/05/2025MasonryFei Zengspecial
08/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFei Zengspecial
08/05/2025Subgrade InspectionsFei Zengspecial
08/05/2025FinalFei Zengprogress
08/05/2025Fire-Resistance Rated ConstructionFei Zengprogress
Latest 25 of 36.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026Q08020525-P1Request digital key ↗
08/19/2026Q08020525-I1Request digital key ↗
08/19/2026Q08020525-P2Request digital key ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q08020525-P2Open ↗
08/13/2026Q08020525-I1Open ↗
08/13/2026Q08020525-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q08020525-P2Open ↗
08/13/2026Q08020525-I1Open ↗
08/13/2026Q08020525-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08020525-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026Q08020525-P2Open ↗
09/23/2026Q08020525-P2Open ↗
08/29/2026Q08020525-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026Q08020525-I1Open ↗
08/19/2026Q08020525-P2Open ↗
08/19/2026Q08020525-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026Q08020525-P2Open ↗
08/29/2026Q08020525-I1Open ↗
08/29/2026Q08020525-I1Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q08020525-P1Open ↗
08/13/2026Q08020525-I1Open ↗
08/13/2026Q08020525-P2Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026Q08020525-I1Open ↗
08/13/2026Q08020525-P2Open ↗
08/13/2026Q08020525-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q08020525-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/13/2026Q08020525-I1Open ↗
08/13/2026Q08020525-P2Open ↗
08/13/2026Q08020525-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q08020525-P1Open ↗
08/13/2026Q08020525-I1Open ↗
08/13/2026Q08020525-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/19/2026Q08020525-P1Open ↗
08/19/2026Q08020525-I1Open ↗
08/19/2026Q08020525-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08020525-I1Open ↗