| Owner | Filings | Most Recent |
|---|---|---|
| L H REALTY | 21 | 07/08/2026 |
| 4640 KISSENA | 4 | 07/08/2026 |
| L H REALTY 2022 | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| EDWARD LUI ARCHITECT PLLC | 7 | 07/30/2025 |
| CHUN FENG | 1 | 12/15/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| AMERGY SOLAR | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TLS CONSTRUCTION GROUP I* | General Contractor | 3 | 03/21/2026 |
| EXCELLENT METROPOLITAN | General Contractor | 2 | 07/08/2026 |
| CROWN PLUMBING INC | Plumbing | 2 | 07/08/2026 |
| AMERGY SOLAR INC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| G ENGINEERING PC | 7778 | 5 | 07/30/2025 |
| TRIANGLE INSPECTION & TES | 7495 | 2 | 01/30/2025 |
| SQ. ARCH, LLC | 4802 | 1 | 12/15/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | EXCELLENT METROPOLITAN | 03/03/2025 |
| DOB NOW | Solar | Signed-off | AMERGY SOLAR INC | 12/17/2024 |
| DOB NOW | Plumbing | Signed-off | CROWN PLUMBING INC | 09/18/2024 |
| DOB NOW | Plumbing | Signed-off | CROWN PLUMBING INC | 03/15/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | EXCELLENT METROPOLITAN | 01/02/2024 |
| DOB NOW | Construction Fence | Signed-off | TLS CONSTRUCTION GROUP I* | 12/29/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/30/2025 | Signed-off | EXCELLENT METROPOLITAN | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MXZ-3C24NA2 24,000 BTU · Heat Pump Outdoor ×2 MXZ-3C30NA2 30,000 BTU · Split System ×2 MXZ-2C20NA2 18 BTU · Split System ×1 MXZ-2C20NAHZ4 30,000 BTU · Heat Pump Outdoor ×8 MXZ-2C20NAZ4 18 BTU · Split System ×2 Ventilation Renewaire RENEWAIRE #EV90 100 CFM · Erv ×6 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2025 | Signed-off | CROWN PLUMBING INC | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/15/2024 | Complete | I.P. ELECTRIC INC | — |
| 03/15/2024 | Complete | KJK ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2025 | Signed-off | EXCELLENT METROPOLITAN | Steel, Masonry, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2025 | Signed-off | EXCELLENT METROPOLITAN | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2025 | Signed-off | EXCELLENT METROPOLITAN | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/04/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 03/13/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/07/2025 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 01/13/2025 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 01/13/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/13/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/29/2024 | Pass-Final PL - Underground | Pass | View ↗ |
| 08/12/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/19/2025 | Fenestration and door U-factor and product ratings | XIONGCAI GU | energy_progress |
| 09/19/2025 | Ventilation and air distribution system | XIONGCAI GU | energy_progress |
| 09/19/2025 | Protection of exposed foundation insulation | XIONGCAI GU | energy_progress |
| 09/19/2025 | Air barrier — testing | XIONGCAI GU | energy_progress |
| 09/19/2025 | HVAC-R and service water piping design and insulation | XIONGCAI GU | energy_progress |
| 09/19/2025 | Fenestration areas | XIONGCAI GU | energy_progress |
| 09/19/2025 | HVAC-R and service water heating equipment | XIONGCAI GU | energy_progress |
| 09/19/2025 | HVAC-R and service water heating system controls | XIONGCAI GU | energy_progress |
| 09/19/2025 | Maintenance information | XIONGCAI GU | energy_progress |
| 09/19/2025 | Metering | XIONGCAI GU | energy_progress |
| 09/19/2025 | Fenestration air leakage | XIONGCAI GU | energy_progress |
| 09/19/2025 | Interior lighting power | XIONGCAI GU | energy_progress |
| 09/19/2025 | Air barrier - visual inspection | XIONGCAI GU | energy_progress |
| 09/19/2025 | Insulation placement and R values | XIONGCAI GU | energy_progress |
| 09/19/2025 | Electric vehicle service equipment requirements | XIONGCAI GU | energy_progress |
| 09/19/2025 | Permanent certificate | XIONGCAI GU | energy_progress |
| 09/19/2025 | Fire-Resistance Rated Construction | XIONGCAI GU | progress |
| 09/19/2025 | Final | SAAD-ELDIN ELBEDWIHY | progress |
| 09/19/2025 | Structural Wood Frame | XIONGCAI GU | progress |
| 09/19/2025 | Footing and Foundation | XIONGCAI GU | progress |
| 09/19/2025 | Energy Code Compliance Inspections | XIONGCAI GU | progress |
| 09/19/2025 | Fire-Resistant Penetrations and Joints | XIONGCAI GU | special |
| 09/19/2025 | Subsurface Investigations (Borings/Test Pits) | Rajasekhar Sakhamuri | special |
| 09/19/2025 | Structural Steel - Details | XIONGCAI GU | special |
| 09/19/2025 | Excavations - Sheeting, Shoring, and Bracing | XIONGCAI GU | special |