| Firm | Filings | Most Recent |
|---|---|---|
| CL ENGINEERING P.C. | 4 | 01/08/2026 |
| PETER CHO ARCHITECTS, PLLC | 1 | 10/25/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| METRO DESIGN CONSULTANTS INC | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PANTANO LANDSCAPING & CON | General Contractor | 5 | 04/09/2026 |
| POWER SURGE ELECTRIC, INC | Electrical | 1 | 03/22/2026 |
| J&J DESIGNS INC | General Contractor | 1 | 04/09/2026 |
| SUPERIOR PLUMBING & HEATING | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CL ENGINEERING P.C. | 6781 | 3 | 01/08/2026 |
| TRIANGLE INSPECTION & TES | 7495 | 1 | 04/29/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | J&J DESIGNS INC | 02/09/2026 |
| DOB NOW | Plumbing | Signed-off | SUPERIOR PLUMBING & HEATI | 11/14/2024 |
| DOB NOW | Structural | Permit Issued | PANTANO LANDSCAPING CON | 10/29/2024 |
| DOB NOW | General Construction | Permit Issued | PANTANO LANDSCAPING CON | 10/29/2024 |
| DOB NOW | Construction Fence | Signed-off | PANTANO LANDSCAPING CON | 10/28/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/08/2026 | Signed-off | J&J DESIGNS INC | Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Heat / Cool Heating Ventilation Hampton Bay 7114-01 50 CFM · Exhaust Fan ×10 Delta Breeze SMT150 150 CFM · Exhaust Fan ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/08/2026 | Signed-off | SUPERIOR PLUMBING & HEATI | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/01/2025 | Permit Issued | POWER SURGE ELECTRIC, INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/08/2026 | Signed-off | J&J DESIGNS INC | Steel, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/08/2026 | Signed-off | J&J DESIGNS INC | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/17/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 03/10/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 03/05/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/12/2026 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 11/28/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/15/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/11/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/14/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 02/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/17/2026 | HVAC-R and service water heating equipment | CHRISTIAN LOZADA | energy_progress |
| 02/17/2026 | Excavations - Sheeting, Shoring, and Bracing | CHRISTIAN LOZADA | special |
| 02/17/2026 | Heating Systems | CHRISTIAN LOZADA | special |
| 02/17/2026 | Mechanical Systems | CHRISTIAN LOZADA | special |
| 02/17/2026 | Masonry | CHRISTIAN LOZADA | special |
| 02/17/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | CHRISTIAN LOZADA | special |
| 02/17/2026 | Structural Steel - Details | CHRISTIAN LOZADA | special |
| 02/17/2026 | Subsurface Investigations (Borings/Test Pits) | Rajasekhar Sakhamuri | special |
| 02/17/2026 | Concrete - Cast-In-Place | CHRISTIAN LOZADA | special |
| 02/17/2026 | Fire-Resistant Penetrations and Joints | CHRISTIAN LOZADA | special |
| 02/17/2026 | Structural Steel - High Strength Bolting | CHRISTIAN LOZADA | special |
| 02/17/2026 | Subgrade Inspections | CHRISTIAN LOZADA | special |
| 02/17/2026 | Fire-Resistance Rated Construction | CHRISTIAN LOZADA | progress |
| 02/17/2026 | Energy Code Compliance Inspections | CHRISTIAN LOZADA | progress |
| 02/17/2026 | Final | PETER CHO | progress |
| 02/17/2026 | Footing and Foundation | CHRISTIAN LOZADA | progress |
| 02/17/2026 | Structural Wood Frame | CHRISTIAN LOZADA | progress |
| 02/17/2026 | Ventilation and air distribution system | CHRISTIAN LOZADA | energy_progress |
| 02/17/2026 | Insulation placement and R values | CHRISTIAN LOZADA | energy_progress |
| 02/17/2026 | Fenestration and door U-factor and product ratings | CHRISTIAN LOZADA | energy_progress |
| 02/17/2026 | Fenestration air leakage | CHRISTIAN LOZADA | energy_progress |
| 02/17/2026 | Air barrier - visual inspection | CHRISTIAN LOZADA | energy_progress |
| 02/17/2026 | Metering | CHRISTIAN LOZADA | energy_progress |
| 02/17/2026 | Duct leakage testing, insulation and design | CHRISTIAN LOZADA | energy_progress |
| 02/17/2026 | Protection of exposed foundation insulation | CHRISTIAN LOZADA | energy_progress |