QUEENS
135-20 222 STREET
QUEENS · BIN 4624940
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanical
Floor 223p · 1 filing · 20 docs
Floor 123p · 1 filing · 20 docs
Cellar26p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.401/08/2026
PETER CHO ARCHITECTS, PLLC110/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PANTANO LANDSCAPING & CONGeneral Contractor504/09/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
J&J DESIGNS INCGeneral Contractor104/09/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781301/08/2026
TRIANGLE INSPECTION & TES7495104/29/2024
Building Lifecycle
All (82)Filed (5)Permit Issued (5)Signed Off (2)Inspection (10)Objection (30)Special Inspection (30)
03/17/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/10/2026
Signed off — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00993239-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00993239-S1
03/10/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/18/2026
Signed off — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00993239-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00993239-S3
02/17/2026
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/17/2026
Special inspection requirement — Final
PETER CHO
02/17/2026
Special inspection requirement — Metering
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Protection of exposed foundation insulation
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Air barrier — testing
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Masonry
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
02/17/2026
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
02/12/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/09/2026
Permit issued — Curb Cut
Q00993239-S2-CC
01/08/2026
Filed — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00993239-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00993239-P1
11/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/14/2024
Permit issued — Plumbing
Q00993239-S1-PL
10/31/2024
Objection resolved — Addressed
10/31/2024
Objection resolved — Addressed
10/29/2024
Permit issued — Structural
Q00993239-I1-GC-CX
10/29/2024
Permit issued — General Construction
Q00993239-I1-FO-EA
10/28/2024
Permit issued — Construction Fence
Q00993239-S3-FN
10/25/2024
Filed — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00993239-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00993239-S3
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/11/2024
Objection raised — Zoning
09/17/2024
Objection resolved — Addressed
09/13/2024
Objection raised — Zoning
08/16/2024
Objection raised — Other
08/15/2024
Objection resolved — Addressed
08/07/2024
Objection resolved — Addressed
08/07/2024
Objection resolved — Addressed
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJ&J DESIGNS INC02/09/2026
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI11/14/2024
DOB NOWStructuralPermit IssuedPANTANO LANDSCAPING CON10/29/2024
DOB NOWGeneral ConstructionPermit IssuedPANTANO LANDSCAPING CON10/29/2024
DOB NOWConstruction FenceSigned-offPANTANO LANDSCAPING CON10/28/2024
1 project · most recent 01/08/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2026Signed-offJ&J DESIGNS INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Friedrich WFPU17Y363D 39,400 BTU · Condensing Unit ×2
WFPU18Z363C 36,400 BTU · Condensing Unit ×2
Heating
Friedrich WFH36Y193D 36,000 BTU · Ahu ×2
WFH36Z193C 36,000 BTU · Ahu ×2
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×10
Delta Breeze SMT150 150 CFM · Exhaust Fan ×4
1 project · most recent 01/08/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/08/2026Signed-offSUPERIOR PLUMBING & HEATIStorm, Water/Sanitary
1 project · most recent 10/01/2025
General Wiring
FiledStatusContractorScope
10/01/2025Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 01/08/2026
Steel Wood
FiledStatusContractorScope
01/08/2026Signed-offJ&J DESIGNS INCSteel, Wood
1 project · most recent 01/08/2026
Fence
FiledStatusContractorScope
01/08/2026Signed-offJ&J DESIGNS INCFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/17/2026Fail-Final CND-Occupancy InspectionFailView ↗
03/10/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
11/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
02/17/2026HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/17/2026Excavations - Sheeting, Shoring, and BracingCHRISTIAN LOZADAspecial
02/17/2026Heating SystemsCHRISTIAN LOZADAspecial
02/17/2026Mechanical SystemsCHRISTIAN LOZADAspecial
02/17/2026MasonryCHRISTIAN LOZADAspecial
02/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
02/17/2026Structural Steel - DetailsCHRISTIAN LOZADAspecial
02/17/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/17/2026Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
02/17/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/17/2026Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
02/17/2026Subgrade InspectionsCHRISTIAN LOZADAspecial
02/17/2026Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/17/2026Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/17/2026FinalPETER CHOprogress
02/17/2026Footing and FoundationCHRISTIAN LOZADAprogress
02/17/2026Structural Wood FrameCHRISTIAN LOZADAprogress
02/17/2026Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
02/17/2026Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
02/17/2026Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
02/17/2026Fenestration air leakageCHRISTIAN LOZADAenergy_progress
02/17/2026Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
02/17/2026MeteringCHRISTIAN LOZADAenergy_progress
02/17/2026Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
02/17/2026Protection of exposed foundation insulationCHRISTIAN LOZADAenergy_progress
Latest 25 of 74.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026Q00993239-P1Request digital key ↗
08/17/2026Q00993239-S3Request digital key ↗
08/17/2026Q00993239-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00993239-P1Open ↗
08/13/2026Q00993239-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026Q00993239-S1Open ↗
09/29/2026Q00993239-S1Open ↗
08/25/2026Q00993239-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/29/2026Q00993239-S1Open ↗
09/29/2026Q00993239-S1Open ↗
08/25/2026Q00993239-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q00993239-P1Open ↗
08/17/2026Q00993239-S3Open ↗
08/17/2026Q00993239-S2Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00993239-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00993239-P1Open ↗
08/13/2026Q00993239-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00993239-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00993239-I1Open ↗
08/13/2026Q00993239-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00993239-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026Q00993239-I1Open ↗
08/13/2026Q00993239-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00993239-P1Open ↗
08/13/2026Q00993239-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026Q00993239-P1Open ↗
08/17/2026Q00993239-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00993239-I1Open ↗