← Back
QUEENS
43-24 222 STREET
QUEENS · BIN 4625045
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Mechanical
Floor 24p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WHITESTONE BUILDERS1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC107/22/2025
BFS ARCHITECT PC412/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTORAS BUILDERS LLCGeneral Contractor207/08/2026
AMERGY SOLAR INCGeneral Contractor107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802107/22/2025
BFS ARCHITECT PC7477312/20/2024
TRIANGLE INSPECTION & TES7495108/07/2024
Building Lifecycle
All (51)Filed (5)Permit Issued (4)Signed Off (3)Inspection (7)Objection (2)Special Inspection (30)
11/07/2025
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01251387-I1
07/25/2025
Permit issued — Solar
Q01251387-I1-SL
07/22/2025
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01251387-I1
07/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
07/04/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
07/04/2025
Special inspection requirement — Final
Chun Feng
07/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
07/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
04/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/28/2025
Signed off — New Building
FILED HEREWITH FOR PLUMBING WORK IN CONJUNCTION WITH GC Q01016453-I1
Q01016453-S1
01/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/16/2025
Special inspection requirement — Air barrier — testing
Belal Salim
01/16/2025
Special inspection requirement — Interior lighting power
Belal Salim
01/16/2025
Special inspection requirement — Air barrier - visual inspection
Belal Salim
01/16/2025
Special inspection requirement — Electric vehicle service equipment requirements
Belal Salim
01/16/2025
Special inspection requirement — Fenestration air leakage
Belal Salim
01/16/2025
Special inspection requirement — Maintenance information
Belal Salim
01/16/2025
Special inspection requirement — Fenestration areas
Belal Salim
01/16/2025
Special inspection requirement — Duct leakage testing, insulation and design
Belal Salim
01/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Belal Salim
01/16/2025
Special inspection requirement — Metering
Belal Salim
01/16/2025
Special inspection requirement — Insulation placement and R values
Belal Salim
01/16/2025
Special inspection requirement — Permanent certificate
Belal Salim
01/16/2025
Special inspection requirement — Subgrade Inspections
Belal Salim
01/16/2025
Special inspection requirement — Masonry
Belal Salim
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
01/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
01/16/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Belal Salim
01/16/2025
Special inspection requirement — Mechanical Systems
Belal Salim
01/16/2025
Special inspection requirement — Heating Systems
Belal Salim
01/16/2025
Special inspection requirement — Concrete - Cast-In-Place
Belal Salim
01/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Belal Salim
01/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Belal Salim
01/16/2025
Special inspection requirement — Final
Belal Salim
01/16/2025
Special inspection requirement — Footing and Foundation
Belal Salim
01/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Belal Salim
01/09/2025
Signed off — New Building
FILED HEREWITH FOR PLUMBING WORK IN CONJUNCTION WITH GC Q01016453-I1
Q01016453-S2
01/09/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/23/2024
Permit issued — Curb Cut
Q01016453-S1-CC
12/20/2024
Filed — New Building
FILED HEREWITH FOR PLUMBING WORK IN CONJUNCTION WITH GC Q01016453-I1
Q01016453-P1
10/28/2024
Objection resolved — Addressed
08/21/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/21/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/15/2024
Permit issued — Plumbing
Q01016453-S2-PL
08/15/2024
Objection raised — Zoning
08/07/2024
Filed — New Building
FILED HEREWITH FOR PLUMBING WORK IN CONJUNCTION WITH GC Q01016453-I1
Q01016453-S2
08/02/2024
Filed — New Building
FILED HEREWITH FOR PLUMBING WORK IN CONJUNCTION WITH GC Q01016453-I1
Q01016453-S1
06/24/2024
Permit issued — Mechanical Systems
Q01016453-I1-GC-CX
03/14/2024
Filed — New Building
FILED HEREWITH FOR PLUMBING WORK IN CONJUNCTION WITH GC Q01016453-I1
Q01016453-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMERGY SOLAR INC07/25/2025
DOB NOWCurb CutSigned-offMASTORAS BUILDERS LLC12/23/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR08/15/2024
DOB NOWMechanical SystemsPermit IssuedMASTORAS BUILDERS LLC06/24/2024
1 project · most recent 12/20/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/20/2024Signed-offMASTORAS BUILDERS LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Goodman GSZB406010 60,000 BTU · Heat Pump Outdoor ×4
Ventilation
Delta SLM501 50 CFM ×10
Air King ES248ADA 150 CFM · Kitchen Exhaust ×4
Comfort Aire DIRECT COMFORT DC-AMST60DU1400AA 1,970 CFM · Fan Coil Indoor ×4
Panasonic FV-10VEC2 (1.2 CFM/WATT) 1 CFM · Erv ×4
1 project · most recent 12/20/2024
Sprinkler System
FiledStatusContractorScope
12/20/2024——Sprinkler System
1 project · most recent 12/20/2024
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
12/20/2024Signed-offINFINITI ESC PLUMBING CORPlumbing-Sprinkler, Storm, Water/Sanitary
2 projects · most recent 07/22/2025
General Wiring
FiledStatusContractorScope
07/22/2025CompleteI.P. ELECTRIC INC—
08/09/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 12/20/2024
FiledStatusContractorScope
12/20/2024Signed-offMASTORAS BUILDERS LLC1 scope_items
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/09/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/21/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/21/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/21/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
07/04/2025Fire-Resistant Penetrations and JointsChun Fengspecial
07/04/2025Air barrier - visual inspectionChun Fengenergy_progress
07/04/2025FinalChun Fengprogress
07/04/2025Energy Code Compliance InspectionsChun Fengprogress
07/04/2025Structural Stability – Alterations of existing buildingsChun Fengspecial
01/16/2025Air barrier — testing Belal Salimenergy_progress
01/16/2025Interior lighting powerBelal Salimenergy_progress
01/16/2025Air barrier - visual inspectionBelal Salimenergy_progress
01/16/2025Electric vehicle service equipment requirementsBelal Salimenergy_progress
01/16/2025Fenestration air leakageBelal Salimenergy_progress
01/16/2025Maintenance informationBelal Salimenergy_progress
01/16/2025Fenestration areasBelal Salimenergy_progress
01/16/2025Duct leakage testing, insulation and designBelal Salimenergy_progress
01/16/2025HVAC-R and service water heating equipmentBelal Salimenergy_progress
01/16/2025MeteringBelal Salimenergy_progress
01/16/2025Insulation placement and R valuesBelal Salimenergy_progress
01/16/2025Permanent certificateBelal Salimenergy_progress
01/16/2025Subgrade InspectionsBelal Salimspecial
01/16/2025MasonryBelal Salimspecial
01/16/2025Fire-Resistant Penetrations and JointsBelal Salimspecial
01/16/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
01/16/2025Exhaust and Vent Systems in Plenums and DuctsBelal Salimspecial
01/16/2025Mechanical SystemsBelal Salimspecial
01/16/2025Heating SystemsBelal Salimspecial
01/16/2025Concrete - Cast-In-PlaceBelal Salimspecial
Latest 25 of 44.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01016453-I1Request digital key ↗
08/21/2026Q01016453-P1Request digital key ↗
08/21/2026Q01016453-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026Q01016453-I1Open ↗
08/13/2026Q01016453-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/21/2026Q01016453-I1Open ↗
08/13/2026Q01016453-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01016453-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
08/26/2026Q01016453-I1Open ↗
08/26/2026Q01016453-I1Open ↗
08/26/2026Q01016453-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/26/2026Q01016453-I1Open ↗
08/26/2026Q01016453-I1Open ↗
08/24/2026Q01016453-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01016453-I1Open ↗
08/19/2026Q01251387-I1Open ↗
08/13/2026Q01016453-S1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/21/2026Q01016453-I1Open ↗
08/13/2026Q01016453-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/21/2026Q01016453-I1Open ↗
08/13/2026Q01016453-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01016453-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q01016453-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q01016453-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/21/2026Q01016453-I1Open ↗
08/13/2026Q01016453-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01016453-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01016453-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01251387-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/21/2026Q01016453-I1Open ↗
08/13/2026Q01016453-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/21/2026Q01016453-I1Open ↗
08/13/2026Q01016453-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01016453-I1Open ↗
08/13/2026Q01016453-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01016453-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01016453-I1Open ↗