← Back
QUEENS
132-18 GAR 154 STREET
QUEENS · BIN 4625164
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Structural
Floor 11p · 1 filing · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOLANKI ENGINEERING, PC305/22/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PENCOL CONTRACTING CORPGeneral Contractor406/27/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252105/22/2025
SOLANKI ENGINEERING, P.C.8451205/22/2025
Building Lifecycle
All (32)Filed (3)Permit Issued (5)Inspection (5)Objection (16)Special Inspection (3)
07/10/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/24/2026
Permit issued — Curb Cut
Q01061073-S2-CC
03/25/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/22/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/22/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/29/2025
Permit issued — Structural
Q01061073-I1-ST
09/29/2025
Permit issued — Structural
Q01061073-I1-FO
09/29/2025
Permit issued — Foundation
Q01061073-I1-GC
08/01/2025
Permit issued — Plumbing
Q01061073-S1-PL
06/05/2025
Objection resolved — Addressed
05/22/2025
Filed — New Building
SUBSEQUENT FILING FOR THE INSTALLATION OF NEW DRYWELL IN OPEN SPACE ASSOCIATED WITH NEW BUILDING GARAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01061073-S1
05/22/2025
Filed — New Building
SUBSEQUENT FILING FOR THE INSTALLATION OF NEW DRYWELL IN OPEN SPACE ASSOCIATED WITH NEW BUILDING GARAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01061073-S2
05/21/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
03/24/2025
Objection raised — Zoning
03/24/2025
Objection raised — Other
03/12/2025
Objection resolved — Addressed
02/19/2025
Objection resolved — Addressed
02/18/2025
Objection resolved — Addressed
11/08/2024
Objection resolved — Addressed
07/03/2024
Objection resolved — Addressed
06/17/2024
Objection raised — Admin
06/17/2024
Objection raised — Inspections
06/17/2024
Objection raised — Scope
06/17/2024
Objection raised — Inspections
06/17/2024
Objection raised — Structural
06/17/2024
Objection raised — Structural
06/06/2024
Filed — New Building
SUBSEQUENT FILING FOR THE INSTALLATION OF NEW DRYWELL IN OPEN SPACE ASSOCIATED WITH NEW BUILDING GARAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01061073-I1
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashray Solanki
06/04/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Ashray Solanki
06/04/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedPENCOL CONTRACTING CORP06/24/2026
DOB NOWStructuralPermit IssuedPENCOL CONTRACTING CORP09/29/2025
DOB NOWStructuralPermit IssuedPENCOL CONTRACTING CORP09/29/2025
DOB NOWFoundationPermit IssuedPENCOL CONTRACTING CORP09/29/2025
DOB NOWPlumbingSigned-offN AND S PLUMBING INC08/01/2025
1 project · most recent 05/22/2025
Storm
FiledStatusContractorScope
05/22/2025Signed-offKISHAN PLUMBING INCStorm
1 project · most recent 08/29/2025
General Wiring
FiledStatusContractorScope
08/29/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 05/22/2025
Masonry Wood
FiledStatusContractorScope
05/22/2025Permit IssuedPENCOL CONTRACTING CORPMasonry, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/10/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
07/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/25/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/22/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/22/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/04/2024Fire-Resistant Penetrations and JointsAshray Solankispecial
06/04/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAshray Solankispecial
06/04/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q01061073-I1Request digital key ↗
08/20/2026Q01061073-S1Request digital key ↗
08/20/2026Q01061073-S2Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01061073-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01061073-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01061073-I1Open ↗
08/20/2026Q01061073-S2Open ↗
08/20/2026Q01061073-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q01061073-S1Open ↗
08/29/2026Q01061073-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01061073-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01061073-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/20/2026Q01061073-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01061073-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01061073-I1Open ↗