← Back
QUEENS
149-65 17 ROAD
QUEENS · BIN 4625197
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
StructuralMechanical
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar5p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK PETRUSO ARCHITECT PC805/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK PETRUSORA AOL COM1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METRO GC NY INCGeneral Contractor807/08/2026
ADRIANO PLMBG & HTG CORPPlumbing207/08/2026
EASTERN ELEC'L CONST INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRANK PETRUSO ARCHITECT,P993405/21/2025
Building Lifecycle
All (70)Filed (8)Permit Issued (7)Signed Off (4)Inspection (9)Objection (12)Special Inspection (30)
07/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/27/2025
Special inspection requirement — Masonry
Frank Petruso
06/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Petruso
06/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Frank Petruso
06/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Frank Petruso
06/27/2025
Special inspection requirement — Structural Wood Frame
Frank Petruso
06/27/2025
Special inspection requirement — Final
Frank Petruso
06/27/2025
Special inspection requirement — Footing and Foundation
Frank Petruso
06/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Frank Petruso
06/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
Frank Petruso
06/27/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Frank Petruso
06/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Frank Petruso
06/27/2025
Special inspection requirement — Subgrade Inspections
Frank Petruso
06/27/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Frank Petruso
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Petruso
06/27/2025
Special inspection requirement — Mechanical Systems
Frank Petruso
06/27/2025
Special inspection requirement — Concrete - Cast-In-Place
Frank Petruso
05/21/2025
Filed — Alteration CO
Construct full second floor addition, Two story horizontal addition & convert into a 2-family dwelling. Gut renovation of existing to include new partition layout, kitchens, bathrooms and mechanical work.
Q01079024-P2
05/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Frank Petruso
05/20/2025
Special inspection requirement — Concrete - Cast-In-Place
Frank Petruso
05/20/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Frank Petruso
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Petruso
05/20/2025
Special inspection requirement — Masonry
Frank Petruso
05/20/2025
Special inspection requirement — Mechanical Systems
Frank Petruso
05/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Frank Petruso
05/20/2025
Special inspection requirement — Subgrade Inspections
Frank Petruso
05/20/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Frank Petruso
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Frank Petruso
05/20/2025
Special inspection requirement — Final
Frank Petruso
05/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Frank Petruso
05/20/2025
Special inspection requirement — Footing and Foundation
Frank Petruso
05/20/2025
Special inspection requirement — Structural Wood Frame
Frank Petruso
05/08/2025
Signed off — Alteration
Q01108367-I1
05/05/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/01/2025
Signed off — Alteration
Q01098270-I1
04/25/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/24/2025
Signed off — Alteration
Install plumbing fixtures, gas equipment/appliances and related piping. Existing plumbing work to be removed.
Q01105301-I1
04/24/2025
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE
Q01075954-I1
04/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/17/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/15/2025
Permit issued — Curb Cut
Q01098270-I1-CC
04/10/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/04/2025
Permit issued — Plumbing
Q01105301-I1-PL
04/03/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/18/2025
Filed — Alteration
Install plumbing fixtures, gas equipment/appliances and related piping. Existing plumbing work to be removed.
Q01105301-P1
02/06/2025
Permit issued — Structural
Q01079024-I1-GC-CX
12/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/21/2024
Permit issued — Plumbing
Q01105301-I1-PL
09/23/2024
Permit issued — Mechanical Systems
Q01079024-I1-GC-CX
09/20/2024
Filed — Alteration CO
Construct full second floor addition, Two story horizontal addition & convert into a 2-family dwelling. Gut renovation of existing to include new partition layout, kitchens, bathrooms and mechanical work.
Q01079024-P1
09/16/2024
Permit issued — Structural
Q01108367-I1-GC-CX
09/09/2024
Filed — Alteration
Q01108367-I1
09/03/2024
Filed — Alteration
Install plumbing fixtures, gas equipment/appliances and related piping. Existing plumbing work to be removed.
Q01105301-I1
08/30/2024
Objection raised — Zoning
08/30/2024
Objection resolved — Addressed
08/30/2024
Objection raised — Zoning
08/30/2024
Objection resolved — Addressed
08/30/2024
Objection raised — Zoning
08/30/2024
Objection resolved — Addressed
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMETRO GC NY INC04/15/2025
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP04/04/2025
DOB NOWStructuralPermit IssuedMETRO GC NY INC02/06/2025
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP10/21/2024
DOB NOWMechanical SystemsPermit IssuedMETRO GC NY INC09/23/2024
DOB NOWStructuralSigned-offMETRO GC NY INC09/16/2024
DOB NOWConstruction FenceSigned-offMETRO GC NY INC07/08/2024
1 project · most recent 05/21/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/21/2025Permit IssuedMETRO GC NY INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Seer RA13NZ24AJ1NA, RA13NZ24AJ1NA 24,000 BTU · Split System ×8
Ventilation
Daikin 2MX18AXVJU,CTX07AXVJU 560 CFM · Exhaust Fan ×14
1 project · most recent 02/06/2025
General Wiring
FiledStatusContractorScope
02/06/2025CompleteEASTERN ELEC'L CONST INCGeneral Wiring
1 project · most recent 05/21/2025
Concrete Wood
FiledStatusContractorScope
05/21/2025Permit IssuedMETRO GC NY INCConcrete, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/25/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/17/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/10/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
06/27/2025MasonryFrank Petrusospecial
06/27/2025HVAC-R and service water piping design and insulationFrank Petrusoenergy_progress
06/27/2025HVAC-R and service water heating system controlsFrank Petrusoenergy_progress
06/27/2025HVAC-R and service water heating equipmentFrank Petrusoenergy_progress
06/27/2025Structural Wood FrameFrank Petrusoprogress
06/27/2025FinalFrank Petrusoprogress
06/27/2025Footing and FoundationFrank Petrusoprogress
06/27/2025Energy Code Compliance InspectionsFrank Petrusoprogress
06/27/2025Fire-Resistance Rated ConstructionFrank Petrusoprogress
06/27/2025Construction Utilizing CLT or SCL, Type IVFrank Petrusospecial
06/27/2025Structural Stability – Alterations of existing buildingsFrank Petrusospecial
06/27/2025Subgrade InspectionsFrank Petrusospecial
06/27/2025Wood – Prefabricated I-JoistsFrank Petrusospecial
06/27/2025Fire-Resistant Penetrations and JointsFrank Petrusospecial
06/27/2025Mechanical SystemsFrank Petrusospecial
06/27/2025Concrete - Cast-In-PlaceFrank Petrusospecial
05/20/2025HVAC-R and service water heating system controlsFrank Petrusoenergy_progress
05/20/2025Concrete - Cast-In-PlaceFrank Petrusospecial
05/20/2025Construction Utilizing CLT or SCL, Type IVFrank Petrusospecial
05/20/2025Fire-Resistant Penetrations and JointsFrank Petrusospecial
05/20/2025MasonryFrank Petrusospecial
05/20/2025Mechanical SystemsFrank Petrusospecial
05/20/2025Structural Stability – Alterations of existing buildingsFrank Petrusospecial
05/20/2025Subgrade InspectionsFrank Petrusospecial
05/20/2025Wood – Prefabricated I-JoistsFrank Petrusospecial
Latest 25 of 48.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026Q01075954-I1Request digital key ↗
08/21/2026Q01098270-I1Request digital key ↗
08/21/2026Q01105301-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q01079024-I1Open ↗
08/13/2026Q01079024-P2Open ↗
08/13/2026Q01079024-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026Q01079024-P2Open ↗
08/13/2026Q01079024-P1Open ↗
08/13/2026Q01079024-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026Q01105301-P1Open ↗
08/21/2026Q01105301-I1Open ↗
08/21/2026Q01108367-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q01079024-P2Open ↗
09/01/2026Q01079024-P2Open ↗
08/26/2026Q01079024-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q01079024-P2Open ↗
09/01/2026Q01079024-P2Open ↗
08/26/2026Q01079024-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q01079024-P2Open ↗
08/13/2026Q01079024-I1Open ↗
08/13/2026Q01079024-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q01105301-P1Open ↗
08/21/2026Q01105301-I1Open ↗
08/21/2026Q01108367-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026Q01079024-P2Open ↗
08/13/2026Q01079024-P1Open ↗
08/13/2026Q01079024-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q01079024-P1Open ↗
08/13/2026Q01079024-P2Open ↗
08/13/2026Q01079024-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q01079024-P2Open ↗
08/20/2026Q01079024-P1Open ↗
08/20/2026Q01079024-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q01079024-P2Open ↗
08/13/2026Q01079024-P1Open ↗
08/13/2026Q01079024-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01079024-I1Open ↗