← Back
Zoned residential, not Manhattan
38-32 215TH STREET
QUEENS · BIN 4625270
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3XZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned residential, not Manhattan · Owner of record: 39TH BAYSIDE LLC · 3,375 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Floor 221p · 1 filing · 20 docs
Floor 122p · 1 filing · 20 docs
Cellar26p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS2107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.611/04/2025
MEHRABAN AHOURAIE103/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PIROOZ ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor503/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177411/04/2025
IP CONCRETE TESTING AND I6252101/22/2025
Building Lifecycle
All (44)Filed (7)Permit Issued (5)Signed Off (5)Violation (1)Inspection (13)Objection (4)Special Inspection (9)
02/20/2026
Signed off — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-I1
01/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/06/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/04/2025
Filed — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-P2
10/31/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/23/2025
Inspection — No Access-Final CND-Occupancy Inspection
No Access
View inspection ↗
10/11/2025
Signed off — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-S4
10/01/2025
Signed off — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-S1
09/21/2025
Signed off — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-S2
09/17/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/05/2025
Signed off — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-S3
05/12/2025
Inspection — Pass-Final House Connection
Pass
View inspection ↗
04/28/2025
Violation issued (ECB, closed)
Construction
03/27/2025
Permit issued — Plumbing
Q01111474-S4-PL
03/21/2025
Filed — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-S4
03/20/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/20/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/19/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/19/2025
Objection resolved — Addressed
03/17/2025
Objection raised — Scope
03/04/2025
Filed — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-P1
02/25/2025
Permit issued — Plumbing
Q01111474-S1-PL
02/12/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/22/2025
Filed — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-S1
01/22/2025
Permit issued — General Construction
Q01111474-I1-GC-CX
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
01/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
01/22/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
01/22/2025
Special inspection requirement — Sprinkler Systems
PIROOZ SOLTANIZADEH
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
01/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
01/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
01/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
01/22/2025
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
01/21/2025
Permit issued — Curb Cut
Q01111474-S2-CC
01/17/2025
Permit issued — Construction Fence
Q01111474-S3-FN
01/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/14/2024
Objection resolved — Addressed
10/11/2024
Objection raised — Scope
10/07/2024
Filed — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-S2
10/06/2024
Filed — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-S3
09/17/2024
Filed — New Building
PROPOSED 2-STORY FRAME BUILDING WITH CELLAR, TWO FAMILY DWELLING.
Q01111474-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC03/27/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/25/2025
DOB NOWGeneral ConstructionPermit IssuedPRECISION HOME DEV INC01/22/2025
DOB NOWCurb CutSigned-offPRECISION HOME DEV INC01/21/2025
DOB NOWConstruction FenceSigned-offPRECISION HOME DEV INC01/17/2025
1 project · most recent 11/04/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/04/2025Permit IssuedPRECISION HOME DEV INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree FLEXX60HP230V1AO / FLEXX48HP230V1BH 4 tons · Heat Pump Outdoor ×6
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×15
FV-15VQ5 150 CFM · Exhaust Fan ×6
1 project · most recent 11/04/2025
Sprinkler System
FiledStatusContractorScope
11/04/2025——Sprinkler System
1 project · most recent 11/04/2025
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
11/04/2025Signed-offNYC MAINMAN CORPPlumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 02/09/2025
General Wiring
FiledStatusContractorScope
02/09/2025CompleteSKY ELECTRIC LLCGeneral Wiring
1 project · most recent 11/04/2025
Concrete Wood
FiledStatusContractorScope
11/04/2025Signed-offNYC MAINMAN CORPConcrete, Wood
1 project · most recent 11/04/2025
Fence
FiledStatusContractorScope
11/04/2025Signed-offNYC MAINMAN CORPFence
1 project · most recent 11/04/2025
Earthwork
FiledStatusContractorScope
11/04/2025Signed-offNYC MAINMAN CORPEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
01/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2026Fail-Final CND-Occupancy InspectionFailView ↗
10/31/2025Fail-Final CND-Occupancy InspectionFailView ↗
10/23/2025No Access-Final CND-Occupancy InspectionNo AccessView ↗
09/17/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/12/2025Pass-Final House ConnectionPassView ↗
03/20/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/20/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/12/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/22/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
01/22/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
01/22/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
01/22/2025Sprinkler SystemsPIROOZ SOLTANIZADEHspecial
01/22/2025Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
01/22/2025HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
01/22/2025HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
01/22/2025HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
01/22/2025Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026Q01111474-S4Request digital key ↗
08/20/2026Q01111474-S1Request digital key ↗
08/20/2026Q01111474-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/20/2026Q01111474-I1Open ↗
08/13/2026Q01111474-P1Open ↗
08/13/2026Q01111474-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/20/2026Q01111474-I1Open ↗
08/14/2026Q01111474-P1Open ↗
08/13/2026Q01111474-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/20/2026Q01111474-I1Open ↗
08/14/2026Q01111474-P1Open ↗
08/13/2026Q01111474-P2Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026Q01111474-P1Open ↗
08/20/2026Q01111474-I1Open ↗
08/13/2026Q01111474-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01111474-S1Open ↗
08/28/2026Q01111474-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q01111474-S1Open ↗
08/28/2026Q01111474-S1Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/20/2026Q01111474-I1Open ↗
08/14/2026Q01111474-P1Open ↗
08/13/2026Q01111474-P2Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/20/2026Q01111474-I1Open ↗
08/14/2026Q01111474-P1Open ↗
08/13/2026Q01111474-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q01111474-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q01111474-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01111474-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/20/2026Q01111474-I1Open ↗
08/14/2026Q01111474-P1Open ↗
08/13/2026Q01111474-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01111474-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/20/2026Q01111474-I1Open ↗
08/14/2026Q01111474-P1Open ↗
08/13/2026Q01111474-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/20/2026Q01111474-I1Open ↗
08/14/2026Q01111474-P1Open ↗
08/13/2026Q01111474-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q01111474-I1Open ↗
08/14/2026Q01111474-P1Open ↗
08/13/2026Q01111474-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01111474-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01111474-I1Open ↗