← Back
QUEENS
258-18 147 ROAD
QUEENS · BIN 4625311
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 29p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.509/15/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor507/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177509/15/2025
IP CONCRETE TESTING AND I6252103/10/2025
Building Lifecycle
All (76)Filed (5)Permit Issued (4)Signed Off (3)Inspection (8)Objection (26)Special Inspection (30)
01/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/21/2025
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Subgrade Inspections
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Final
NAVEEN KUMAR
12/21/2025
Special inspection requirement — Lowest Floor Elevation
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Structural Wood Frame
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Electric vehicle service equipment requirements
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Ventilation and air distribution system
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Air barrier - visual inspection
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Insulation placement and R values
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Interior lighting power
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Duct leakage testing, insulation and design
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Air barrier — testing
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
12/21/2025
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
09/15/2025
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION # Q01139329-I1 FOR INSTALLATION OF A NEW PLUMBING SYSTEM WITH SPRINKLER SYSTEM FOR A TWO-FAMILY HOUSE.
Q01139329-P1
09/15/2025
Signed off — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION # Q01139329-I1 FOR INSTALLATION OF A NEW PLUMBING SYSTEM WITH SPRINKLER SYSTEM FOR A TWO-FAMILY HOUSE.
Q01139329-S2
09/13/2025
Signed off — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION # Q01139329-I1 FOR INSTALLATION OF A NEW PLUMBING SYSTEM WITH SPRINKLER SYSTEM FOR A TWO-FAMILY HOUSE.
Q01139329-S3
09/12/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/08/2025
Permit issued — Curb Cut
Q01139329-S3-CC
09/05/2025
Signed off — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION # Q01139329-I1 FOR INSTALLATION OF A NEW PLUMBING SYSTEM WITH SPRINKLER SYSTEM FOR A TWO-FAMILY HOUSE.
Q01139329-S4
05/01/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/01/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/08/2025
Permit issued — Plumbing
Q01139329-S2-PL
04/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2025
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION # Q01139329-I1 FOR INSTALLATION OF A NEW PLUMBING SYSTEM WITH SPRINKLER SYSTEM FOR A TWO-FAMILY HOUSE.
Q01139329-S2
03/05/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/26/2025
Permit issued — Foundation
Q01139329-I1-GC-CX
02/05/2025
Permit issued — Construction Fence
Q01139329-S4-FN
02/04/2025
Objection resolved — Addressed
02/04/2025
Objection resolved — Addressed
02/03/2025
Objection raised — Scope
02/03/2025
Objection raised — Inspections
01/29/2025
Objection resolved — Addressed
01/26/2025
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION # Q01139329-I1 FOR INSTALLATION OF A NEW PLUMBING SYSTEM WITH SPRINKLER SYSTEM FOR A TWO-FAMILY HOUSE.
Q01139329-S3
01/22/2025
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION # Q01139329-I1 FOR INSTALLATION OF A NEW PLUMBING SYSTEM WITH SPRINKLER SYSTEM FOR A TWO-FAMILY HOUSE.
Q01139329-S4
01/22/2025
Objection raised — Other
01/14/2025
Objection resolved — Addressed
01/14/2025
Objection resolved — Addressed
01/14/2025
Objection resolved — Addressed
01/14/2025
Objection resolved — Addressed
01/14/2025
Objection resolved — Addressed
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPRECISION HOME DEV INC09/08/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR04/08/2025
DOB NOWFoundationPermit IssuedPRECISION HOME DEV INC02/26/2025
DOB NOWConstruction FenceSigned-offPRECISION HOME DEV INC02/05/2025
1 project · most recent 09/15/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/15/2025Signed-offPRECISION HOME DEV INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree CONDENSER: FLEXX60HP230V1A0 AIR HANDLER: FLEXX48HP230V1BH 48,000 BTU · Split System ×4
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×10
FV-15VQ5 150 CFM · Exhaust Fan ×4
1 project · most recent 09/15/2025
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
09/15/2025Signed-offINFINITI ESC PLUMBING CORPlumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 04/30/2025
General Wiring
FiledStatusContractorScope
04/30/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 09/15/2025
Concrete Wood
FiledStatusContractorScope
09/15/2025Signed-offPRECISION HOME DEV INCConcrete, Wood
1 project · most recent 09/15/2025
Fence
FiledStatusContractorScope
09/15/2025Signed-offPRECISION HOME DEV INCFence
1 project · most recent 09/15/2025
Earthwork
FiledStatusContractorScope
09/15/2025Signed-offPRECISION HOME DEV INCEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/01/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/01/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/05/2025Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
12/21/2025Mechanical SystemsPIROOZ SOLTANIZADEHspecial
12/21/2025MasonryPIROOZ SOLTANIZADEHspecial
12/21/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
12/21/2025Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
12/21/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
12/21/2025Subgrade InspectionsPIROOZ SOLTANIZADEHspecial
12/21/2025Heating SystemsPIROOZ SOLTANIZADEHspecial
12/21/2025Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
12/21/2025FinalNAVEEN KUMARprogress
12/21/2025Lowest Floor ElevationPIROOZ SOLTANIZADEHprogress
12/21/2025Structural Wood FramePIROOZ SOLTANIZADEHprogress
12/21/2025Footing and FoundationPIROOZ SOLTANIZADEHprogress
12/21/2025Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
12/21/2025Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
12/21/2025PreliminaryPIROOZ SOLTANIZADEHprogress
12/21/2025Electric vehicle service equipment requirementsPIROOZ SOLTANIZADEHenergy_progress
12/21/2025Ventilation and air distribution systemPIROOZ SOLTANIZADEHenergy_progress
12/21/2025Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
12/21/2025Fenestration areasPIROOZ SOLTANIZADEHenergy_progress
12/21/2025Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
12/21/2025Air barrier - visual inspectionPIROOZ SOLTANIZADEHenergy_progress
12/21/2025Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
12/21/2025Interior lighting powerPIROOZ SOLTANIZADEHenergy_progress
12/21/2025HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
12/21/2025Fenestration air leakagePIROOZ SOLTANIZADEHenergy_progress
Latest 25 of 71.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01139329-P1Request digital key ↗
08/21/2026Q01139329-S4Request digital key ↗
08/21/2026Q01139329-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01139329-P1Open ↗
08/13/2026Q01139329-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01139329-P1Open ↗
08/13/2026Q01139329-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01139329-I1Open ↗
08/13/2026Q01139329-P1Open ↗
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature48
09/01/2026Q01139329-I1Open ↗
09/01/2026Q01139329-I1Open ↗
09/01/2026Q01139329-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026Q01139329-I1Open ↗
09/01/2026Q01139329-I1Open ↗
09/01/2026Q01139329-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01139329-I1Open ↗
08/21/2026Q01139329-P1Open ↗
08/21/2026Q01139329-S4Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q01139329-P1Open ↗
08/13/2026Q01139329-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/21/2026Q01139329-P1Open ↗
08/15/2026Q01139329-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01139329-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01139329-P1Open ↗
08/13/2026Q01139329-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01139329-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026Q01139329-I1Open ↗
08/13/2026Q01139329-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01139329-P1Open ↗
08/13/2026Q01139329-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01139329-P1Open ↗
08/15/2026Q01139329-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01139329-I1Open ↗
▸DOB NOWFinal Survey1