| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/27/2026 | — | — | Air Conditioning Systems, Cooling Towers, Generators, Heating and Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/27/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/27/2026 | — | — | Gas, Medical Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/27/2026 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/21/2026 | Permit Issued | LEON D. DEMATTEIS CONST | Fence |
| Owner | Filings | Most Recent |
|---|---|---|
| NYC DEPARTMENT OF DESIGN CONSTR | 7 | 09/13/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| TAREK M. ZEID, PE, PLLC | 1 | 04/21/2026 |
| STV INCORPORATED | 8 | 03/27/2026 |
| MUESER RUTLEDGE CONSULTING ENGINEER | 1 | 03/27/2026 |
| INFRASTRUCTURE ENGINEERING,INC., PC | 1 | 03/27/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| LEON D. DEMATTEIS CONST | General Contractor | 1 | 07/08/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | LEON D. DEMATTEIS CONST | 05/11/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/26/2026 | Final | — | progress |
| 03/23/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/23/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/23/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 03/20/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/20/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 03/20/2026 | Metering | — | energy_progress |
| 03/20/2026 | Electrical motors and elevators | — | energy_progress |
| 03/20/2026 | Maintenance information | — | energy_progress |
| 03/20/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | — | special |
| 03/20/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 03/20/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/20/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/20/2026 | Post-installed Anchors | — | special |
| 03/19/2026 | Electrical motors and elevators | — | energy_progress |
| 03/19/2026 | Concrete - Cast-In-Place | — | special |
| 03/19/2026 | Masonry | — | special |
| 03/19/2026 | Post-installed Anchors | — | special |
| 03/19/2026 | Structural Steel - High Strength Bolting | — | special |
| 03/19/2026 | Structural Steel - Welding | — | special |
| 03/19/2026 | Subgrade Inspections | — | special |
| 03/19/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 03/19/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 03/19/2026 | Structural Steel - Details | — | special |
| 03/19/2026 | HVAC-R and service water heating system controls | — | energy_progress |