← Back
QUEENS
40-19 219 STREET
QUEENS · BIN 4625771
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 1 filing · 20 docs
Floor 2Under Construction16p · 1 filing · 20 docs
Floor 1Under Construction16p · 1 filing · 20 docs
CellarUnder Construction12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DYNASTY CONTRACTING1108/06/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.508/11/2026
MEI ARCHITECT PLLC110/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor404/09/2026
WASOFF PLBG & UTILITY COPlumbing108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129508/11/2026
TRIANGLE INSPECTION & TES7495208/11/2026
Building Lifecycle
All (51)Filed (6)Permit Issued (5)Objection (10)Special Inspection (30)
08/11/2026
Filed — New Building
PROPOSED A NEW 2-STORY RESIDENCE FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01288291-P1
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
08/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
08/07/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/07/2026
Special inspection requirement — Sprinkler Systems
MEHDI GHAZI
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
08/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
08/05/2026
Permit issued — Plumbing
Q01288291-S3-PL
07/30/2026
Filed — New Building
PROPOSED A NEW 2-STORY RESIDENCE FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01288291-S4
04/07/2026
Filed — New Building
PROPOSED A NEW 2-STORY RESIDENCE FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01288291-S3
03/25/2026
Permit issued — Earth Work
Q01288291-S1-FO-EA
03/24/2026
Permit issued — Mechanical Systems
Q01288291-I1-GC
03/24/2026
Permit issued — Structural
Q01288291-S2-ST
03/23/2026
Permit issued — General Construction
Q01288291-I1-MS
03/16/2026
Objection resolved — Addressed
03/08/2026
Filed — New Building
PROPOSED A NEW 2-STORY RESIDENCE FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01288291-S1
03/08/2026
Filed — New Building
PROPOSED A NEW 2-STORY RESIDENCE FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01288291-S2
03/08/2026
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
03/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
03/08/2026
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
03/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/13/2026
Objection resolved — Addressed
02/13/2026
Objection resolved — Addressed
12/30/2025
Objection raised — Zoning
12/10/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
11/28/2025
Special inspection requirement — Final
MEHDI GHAZI
11/28/2025
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
11/07/2025
Objection raised — Scope
11/07/2025
Objection raised — Energy
11/07/2025
Objection raised — Energy
11/07/2025
Objection raised — Admin
10/07/2025
Filed — New Building
PROPOSED A NEW 2-STORY RESIDENCE FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01288291-I1
09/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
09/16/2025
Special inspection requirement — Duct leakage testing, insulation and design
MEHDI GHAZI
09/16/2025
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
09/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
09/16/2025
Special inspection requirement — Interior lighting power
MEHDI GHAZI
09/16/2025
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
09/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
09/16/2025
Special inspection requirement — Maintenance information
MEHDI GHAZI
09/16/2025
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
09/16/2025
Special inspection requirement — Metering
MEHDI GHAZI
09/16/2025
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
09/16/2025
Special inspection requirement — Heating Systems
MEHDI GHAZI
09/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
09/16/2025
Special inspection requirement — Final
MEHDI GHAZI
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWASOFF PLBG & UTILITY CO08/05/2026
DOB NOWEarth WorkPermit IssuedL&L CONSTRUCTION DEVELOP03/25/2026
DOB NOWMechanical SystemsPermit IssuedL&L CONSTRUCTION DEVELOP03/24/2026
DOB NOWStructuralPermit IssuedL&L CONSTRUCTION DEVELOP03/24/2026
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP03/23/2026
1 project · most recent 08/11/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2026Permit IssuedL&L CONSTRUCTION DEVELOPHeating and Air Conditioning Systems
Heat / Cool
Goodman GLZS4BA6010 60,000 BTU · Heat Pump Outdoor ×2
GLZS4BA3610 36,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 08/11/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
08/11/2026Permit IssuedWASOFF PLBG & UTILITY COPlumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026Permit IssuedCL ELECTRICAL CORPGeneral Wiring
1 project · most recent 08/11/2026
Steel Masonry Wood
FiledStatusContractorScope
08/11/2026Permit IssuedWASOFF PLBG & UTILITY COSteel, Masonry, Wood
1 project · most recent 08/11/2026
Earthwork
FiledStatusContractorScope
08/11/2026Permit IssuedWASOFF PLBG & UTILITY COEarthwork
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
08/07/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
08/07/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
08/07/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/07/2026Sprinkler SystemsMEHDI GHAZIspecial
08/07/2026Energy Code Compliance InspectionsMEHDI GHAZIprogress
08/07/2026HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
08/07/2026HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
08/07/2026HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
03/08/2026Concrete - Cast-In-PlaceMEHDI GHAZIspecial
03/08/2026Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
03/08/2026Subgrade InspectionsMEHDI GHAZIspecial
03/08/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
11/28/2025FinalMEHDI GHAZIprogress
11/28/2025Footing and FoundationMEHDI GHAZIprogress
09/16/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
09/16/2025Duct leakage testing, insulation and designMEHDI GHAZIenergy_progress
09/16/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
09/16/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
09/16/2025Interior lighting powerMEHDI GHAZIenergy_progress
09/16/2025Mechanical SystemsMEHDI GHAZIspecial
09/16/2025Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
09/16/2025Maintenance informationMEHDI GHAZIenergy_progress
09/16/2025Fenestration air leakageMEHDI GHAZIenergy_progress
09/16/2025MeteringMEHDI GHAZIenergy_progress
09/16/2025Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
Latest 25 of 38.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026Q01288291-S4Request digital key ↗
08/17/2026Q01288291-S3Request digital key ↗
08/17/2026Q01288291-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01288291-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01288291-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01288291-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026Q01288291-S4Open ↗
08/17/2026Q01288291-S3Open ↗
08/17/2026Q01288291-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q01288291-I1Open ↗
09/23/2026Q01288291-I1Open ↗
09/07/2026Q01288291-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026Q01288291-I1Open ↗
09/23/2026Q01288291-I1Open ↗
09/07/2026Q01288291-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026Q01288291-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01288291-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026Q01288291-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q01288291-S1Open ↗
08/13/2026Q01288291-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026Q01288291-S1Open ↗
08/17/2026Q01288291-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01288291-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01288291-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01288291-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026Q01288291-S1Open ↗