← Back
QUEENS
215-15 40 AVENUE
QUEENS · BIN 4625923
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC308/28/2026
Building Lifecycle
All (40)Filed (3)Objection (7)Special Inspection (30)
08/28/2026
Filed — New Building
INSTALL 18' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE
Q01353972-S2
06/12/2026
Objection resolved — Addressed
06/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/20/2026
Objection raised — Scope
03/20/2026
Objection raised — Admin
03/20/2026
Objection raised — Zoning
03/20/2026
Objection raised — Zoning
02/13/2026
Objection raised — Admin
02/13/2026
Objection raised — Structural
02/01/2026
Filed — New Building
INSTALL 18' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE
Q01353972-S1
02/01/2026
Filed — New Building
INSTALL 18' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE
Q01353972-I1
02/01/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
02/01/2026
Special inspection requirement — Masonry
02/01/2026
Special inspection requirement — Structural Steel - Details
02/01/2026
Special inspection requirement — Concrete - Cast-In-Place
02/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/01/2026
Special inspection requirement — Heating Systems
02/01/2026
Special inspection requirement — Structural Steel - High Strength Bolting
02/01/2026
Special inspection requirement — Structural Steel - Welding
02/01/2026
Special inspection requirement — Subgrade Inspections
02/01/2026
Special inspection requirement — Mechanical Systems
02/01/2026
Special inspection requirement — Energy Code Compliance Inspections
02/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/01/2026
Special inspection requirement — Structural Wood Frame
02/01/2026
Special inspection requirement — Final
02/01/2026
Special inspection requirement — Footing and Foundation
02/01/2026
Special inspection requirement — Duct leakage testing, insulation and design
02/01/2026
Special inspection requirement — Metering
02/01/2026
Special inspection requirement — Electric vehicle service equipment requirements
02/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/01/2026
Special inspection requirement — Interior lighting power
02/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/01/2026
Special inspection requirement — Maintenance information
02/01/2026
Special inspection requirement — Fenestration areas
02/01/2026
Special inspection requirement — Air barrier — testing
02/01/2026
Special inspection requirement — Fenestration air leakage
02/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/01/2026
Special inspection requirement — Air barrier - visual inspection
02/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/01/2026
Special inspection requirement — Insulation placement and R values
Nothing on file for this building.
1 project · most recent 08/28/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
08/28/2026——Steel, Concrete, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
06/11/2026Subsurface Investigations (Borings/Test Pits)—special
02/01/2026Subsurface Investigations (Borings/Test Pits)—special
02/01/2026Masonry—special
02/01/2026Structural Steel - Details—special
02/01/2026Concrete - Cast-In-Place—special
02/01/2026Fire-Resistant Penetrations and Joints—special
02/01/2026Heating Systems—special
02/01/2026Structural Steel - High Strength Bolting—special
02/01/2026Structural Steel - Welding—special
02/01/2026Subgrade Inspections—special
02/01/2026Mechanical Systems—special
02/01/2026Energy Code Compliance Inspections—progress
02/01/2026Fire-Resistance Rated Construction—progress
02/01/2026Structural Wood Frame—progress
02/01/2026Final—progress
02/01/2026Footing and Foundation—progress
02/01/2026Duct leakage testing, insulation and design—energy_progress
02/01/2026Metering—energy_progress
02/01/2026Electric vehicle service equipment requirements—energy_progress
02/01/2026Fenestration and door U-factor and product ratings—energy_progress
02/01/2026Interior lighting power—energy_progress
02/01/2026HVAC-R and service water piping design and insulation—energy_progress
02/01/2026Maintenance information—energy_progress
02/01/2026Fenestration areas—energy_progress
02/01/2026Air barrier — testing —energy_progress
Latest 25 of 33.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026Q01353972-S1Request digital key ↗
08/15/2026Q01353972-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01353972-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026Q01353972-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/15/2026Q01353972-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01353972-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01353972-S1Open ↗
08/17/2026Q01353972-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026Q01353972-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/15/2026Q01353972-S1Open ↗
08/15/2026Q01353972-I1Open ↗
▸DOB NOWSOIL REPORT2
08/15/2026Q01353972-S1Open ↗
08/15/2026Q01353972-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01353972-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01353972-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01353972-I1Open ↗