| Firm | Filings | Most Recent |
|---|---|---|
| AMERILAND BROOK LLC | 3 | 08/28/2026 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2026 | — | — | Steel, Concrete, Masonry, Wood |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/11/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 02/01/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 02/01/2026 | Masonry | — | special |
| 02/01/2026 | Structural Steel - Details | — | special |
| 02/01/2026 | Concrete - Cast-In-Place | — | special |
| 02/01/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 02/01/2026 | Heating Systems | — | special |
| 02/01/2026 | Structural Steel - High Strength Bolting | — | special |
| 02/01/2026 | Structural Steel - Welding | — | special |
| 02/01/2026 | Subgrade Inspections | — | special |
| 02/01/2026 | Mechanical Systems | — | special |
| 02/01/2026 | Energy Code Compliance Inspections | — | progress |
| 02/01/2026 | Fire-Resistance Rated Construction | — | progress |
| 02/01/2026 | Structural Wood Frame | — | progress |
| 02/01/2026 | Final | — | progress |
| 02/01/2026 | Footing and Foundation | — | progress |
| 02/01/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 02/01/2026 | Metering | — | energy_progress |
| 02/01/2026 | Electric vehicle service equipment requirements | — | energy_progress |
| 02/01/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 02/01/2026 | Interior lighting power | — | energy_progress |
| 02/01/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 02/01/2026 | Maintenance information | — | energy_progress |
| 02/01/2026 | Fenestration areas | — | energy_progress |
| 02/01/2026 | Air barrier — testing | — | energy_progress |